Godrej Sky Greens Phase 2
By Manjari Housing Projects LLP
RG-MH-23076 · RERA P52100032794 · Last updated on MahaRERA portal: 24 Jul 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Litigation declared, 3 cases
- Completion date moved by 9 months
- 1 extension taken
- Rs 230.00 crore secured on the land, in favour of ICICI BANK LIMITED
Clear
- No complaints on record
- Separate project account declared
- Allotment letter follows the model form
4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Godrej Sky Greens Phase 2 is a Residential / Group Housing project by Manjari Housing Projects LLP in Pune, Maharashtra, registered with MahaRERA as P52100032794 on 29 Jan 2022. Possession is promised by 31 Dec 2026. The completion date has moved by 9 months from the original filing. 320 of the 320 units on this registration are recorded sold or booked, and 3 of 11 construction stages are filed complete.
At a glance
Project
- NameGodrej Sky Greens Phase 2
- TypeResidential / Group Housing
- Location
- Off Awhalwadi Road
- Manjari Khurd
- MANJARI KH
- Haveli
- Pune
- 412307
- Pincode412307
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100032794
- ReraGenie IDRG-MH-23076
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on29 Jan 2022
- Promised completion31 Dec 2026
- Revised completionRevised to 31 Dec 2026 (originally 31 Mar 2026)
- Buildings1 building record
- Documents filed118 files
Current status
Figures as on 24 Jul 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Tower - 04 | NA | 28 | 27 | 320 | 0 | 320 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 24 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
3 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 95%.
Tower - 04: 69% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 95% |
| Sanitary Fittings within the flats / premises | 93% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 95% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 90% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 90% |
Progress on shared amenities15
As on 24 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 70% |
| Water Supply | Yes | 70% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 98% |
| Storm Water Drains | Yes | 98% |
| Landscaping & Tree Planting | Yes | 10% |
| Street Lighting | Yes | 0% |
| Community Buildings | Yes | 50% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 98% |
| Solid Waste Management And Disposal | Yes | 98% |
| Water conservation /Rain water harvesting | Yes | 98% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 98% |
| Electrical meter room, sub-station, receiving station | Yes | 95% |
| Aggregate area of recreational Open Space | Yes | 30% |
| Open Parking | No | Not applicable |
Parking filed1432
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| Tower - 04 | NA | Rs 55.50 cr | Rs 43.05 cr |
| - | NA | Rs 1.76 cr | Rs 62.76 lakh |
Certifying professionals and partners8
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | VK: a architecture |
| Architect | ANA Consortium Pvt Ltd |
| Engineer | CBRE South Asia Pvt. Ltd. |
| Engineer | Mangesh Avinash Lawand |
| Engineer | Mujeebur Rahman |
| Engineer | Kasturi Gandhi |
| Chartered Accountant | M D Deshpande & Co |
| Chartered Accountant | B S R & Co. LLP |
| Partner | Role in project |
|---|---|
| Manjari Housing Projects LLP | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterWe hereby submit this application seeking an extension of the registration period under Section 6 of the Maharashtra Real Estate Regulatory Authority Act.Now that the RCC activities are finished and the superstructure is prepared, with some internal finishing touches still to be done, we are optimistic that the remaining work will be finished in the upcoming year. As a result, we are now required to update the project's completion schedule and request an extension till 31-12-2026. We intend to execute an agreement with the customer to mention the date of possession on or before 31-12-2026. Kin
Litigation declared3
| Case | Court | Status |
|---|---|---|
| 494/2008 | Civil Judge Senior Division | Pending |
| 479/2008 | Bombay High Court | Pending |
| 1170/2014 | Civil Judge Junior Division | Pending |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 14 Jun 2022 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 22 Dec 2021 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 15 Feb 2022 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 26 May 2023Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2026
Documents filed118
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 118 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Architect Certificate Godrej Sky Greens Phase 2 R5 (23-07-2026).pdf | 24 Jul 2026 |
| Withdrawal Update Form 2File: R5B Godrej Sky Greens Ph2.pdf | 24 Jul 2026 |
| Withdrawal Update Form 3File: Sky Greens-2.pdf | 24 Jul 2026 |
| Withdrawal Update Form 1File: Godrej Sky Greens Phase 2.pdf | 4 May 2026 |
| Withdrawal Update Form 2File: R5B Godrej Sky Greens Ph2.pdf | 4 May 2026 |
| Withdrawal Update Form 3File: GODREJ SKY GREENS PHASE 2.pdf | 4 May 2026 |
| Form 2A (FY 2025-2026)File: R5B- Ph 2- Quality Assurance Certificate - Q4 - March 2026.pdf | 4 May 2026 |
| Form 2A (FY 2024-2025)File: Sky greens 2 Form 2a Fy25.pdf | 11 Feb 2026 |
| Withdrawal Update Form 1File: Form 1_Sky Greens 2.pdf | 20 Jan 2026 |
| Withdrawal Update Form 2File: R5B Godrej Sky Greens Ph2.pdf | 20 Jan 2026 |
| Withdrawal Update Form 3File: Sky Greens-2.pdf | 20 Jan 2026 |
| Withdrawal Update Form 1File: R5B - Sky Greens Phase 2.pdf | 17 Oct 2025 |
| Withdrawal Update Form 2File: R5B Godrej Sky Greens Ph2.pdf | 17 Oct 2025 |
| Withdrawal Update Form 3File: Sky Green Phase -II-September-2025_Signed.pdf | 17 Oct 2025 |
| Withdrawal Update Form 1File: Sky Greens Phase 2 - RERA.pdf | 7 Oct 2025 |
| Withdrawal Update Form 2File: R5B Godrej Sky Greens Ph2.pdf | 7 Oct 2025 |
| Withdrawal Update Form 3File: Sky Greens-2.pdf | 7 Oct 2025 |
| Form 5 (FY 2024-2025)File: Sky greens-2 24-25.pdf | 2 Sep 2025 |
| Form 1File: Sky Greens Phase 2 - RERA.pdf | 21 Jul 2025 |
| Form 2File: R5B Godrej Sky Greens Ph2.pdf | 21 Jul 2025 |
| Form 3File: Sky Greens-2.pdf | 21 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: Sky Greens Phase 2.pdf | 21 Jul 2025 |
| OthersFile: R5B Skygreens Phase 2 - Quality assurance certificate - Q1 - June 2025.pdf | 21 Jul 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: R5B Skygreens Phase 2- Quality Assurance Certificate - Q4 - March 2025.pdf | 29 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3-Sky Green Ph -II.pdf | 21 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: R5B Godrej Sky Greens Ph2.pdf | 16 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: Sky Greens Phase 2 - Tower 4.pdf | 16 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Skygreens_Form 1.pdf | 6 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Sky greens 2_Form 3.pdf | 28 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: R5B Godrej Skygreens Ph2_Form 2.pdf | 28 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: Sky Greens Phase 2_Disclosure Sold Unsold.pdf | 28 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Sky greens 2_Architect Certificate.pdf | 21 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Sky greens 2_CA Certificate.pdf | 21 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: R5B Godrej Skygreens 02_Engineer Certificate.pdf | 21 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: Sky Greens Phase 2_Disclosure Sold Unsold.pdf | 21 Oct 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5_Sky Green phase 2.pdf | 11 Oct 2024 |
| Form 5 (FY 2023-2024) | 30 Sep 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Godrej sky greens PH 2.pdf | 16 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers certificate Godrej Skygreens phase 2.pdf | 13 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Sky greens 2_compressed.pdf | 13 Jul 2024 |
| Disclosure of sold/ booked inventoryFile: Sky Greens Phase 2.pdf | 5 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RERA Certificate - R5B - Phase 2.pdf | 15 Apr 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Skygreen Ph-2 certificate signed with declaration.pdf | 15 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE R5B PHASE 2.pdf | 9 Apr 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: QUALITY ASSURANCE CERTIFICATE - R5B Skygreens Ph02.pdf | 9 Apr 2024 |
| Disclosure of sold/ booked inventoryFile: Sky Greens Phase 2.pdf | 4 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: R5B SKy green Phase 2 RERA Certificate.pdf | 15 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE R5B sky green PHASE 2.pdf | 15 Jan 2024 |
| Disclosure of sold/ booked inventoryFile: Sky Greens Phase 2.pdf | 15 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Godrej Sky Greens Ph-2.pdf | 15 Jan 2024 |
| Disclosure of sold/ booked inventoryFile: Sky Greens Phase 2.pdf | 20 Oct 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Skygreens phase 2.pdf | 19 Oct 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: sky greens 2_11zon.pdf | 18 Oct 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Manjari - Sky Greens Phase 2 SIGNED.pdf | 22 Sep 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SG2_CA.pdf | 17 Jul 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Sky Greens Phase 2_Architect Certificate.pdf | 12 Jul 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Godrej Skygreens (R5B - Ph 2) Engineers certificate - Q1 June2023.pdf | 10 Jul 2023 |
| Disclosure of sold/ booked inventoryFile: Sky Greens Phase 2.pdf | 10 Jul 2023 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: Society Registration Certificate SG Phase 1 and 2.pdf | 10 Jul 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: CC_compressed (1).pdf | 26 May 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf | 17 Apr 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate R5B Phase 2_compressed.pdf | 17 Apr 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Quality Assurance R5B Phase 2.pdf | 17 Apr 2023 |
| Disclosure of sold/ booked inventoryFile: Godrej Sky Greens Phase 2.pdf | 17 Apr 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Sky Greens-2_Form-3_compressed.pdf | 17 Apr 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Sky Greens Phase -2.pdf | 19 Jan 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate sky green phase 2.pdf | 19 Jan 2023 |
| Disclosure of sold/ booked inventoryFile: GODREJ SKY GREENS 2.pdf | 19 Jan 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Sky Greens 2 Form 3.pdf | 19 Jan 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf | 17 Oct 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: R5B Phase 2 Engineers Certificate_compressed.pdf | 17 Oct 2022 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold Sky Greens Phase 2.pdf | 17 Oct 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate-Sky Greens-2.pdf | 17 Oct 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Manjari - Skygreen Phase 2.pdf | 30 Sep 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Godrej Skygreens (R5B) Ph2 -Engineers Certificate Jun-22_compressed.pdf | 7 Jul 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Goderj Skygreens (R5B)Ph2 - Quality Assurance Certificate - Jun-22.pdf | 7 Jul 2022 |
| CERSAI detailsFile: CERSAI_Search_Report_Manjri1.pdf | 7 Jul 2022 |
| CERSAI detailsFile: CERSAI_Search_Report_200241688908_Manjri2.pdf | 7 Jul 2022 |
| Disclosure of sold/ booked inventoryFile: Sky Greens Phase -2_compressed.pdf | 7 Jul 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: MDD_Green Phase-II-signed.pdf | 7 Jul 2022 |
Promoter's earlier projects2
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Registered | Status | Promised | Delivered |
|---|---|---|---|---|---|---|
| Godrej ParkridgeP52100028310 | Manjari Kh, Pune | 674 | Feb 2021 | Ongoing | Sep 2025 | Not delivered |
| GODREJ BOULEVARDP52100024616 | Manjri Khurd, Pune | 780 | Feb 2020 | Ongoing | Sep 2025 | Not delivered |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 4 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 8 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 118 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep Godrej Sky Greens Phase 2 on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Manjari Khurd13,700+ in Pune
Filed coordinates, straight-line distance. 40 registered projects within 2 km.
MAGNACITY - Tower A2
Malnad Project (I) Pvt Ltd
Birla Evam Phase 1
Vypak Properties Private Limited
VTP AURELIA PHASE 1
ASOJ REALTY LLP
GODREJ BOULEVARD
Manjari Housing Projects LLP
Godrej Park Springs
Manjari Housing Projects LLP
VTP DOLCE VITA Phase 1
Ashdan Developers Private Limited
Builder: Manjari Housing Projects LLP
Manjari Housing Projects LLP has 9 registrations on MahaRERA, including GODREJ BOULEVARD and Godrej Park Springs. Its filings disclose 7 earlier MahaRERA projects: declares 2 of 2 past projects completed on time. Litigation is declared on 7 of its registrations. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if Godrej Sky Greens Phase 2 is delayed beyond 31 Dec 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Godrej Sky Greens Phase 2?
The registered promoter entity is Manjari Housing Projects LLP, an others as per the filing. Its GSTIN 27AARFG0014F1ZP can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Godrej Sky Greens Phase 2?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Godrej Sky Greens Phase 2?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Godrej Sky Greens Phase 2?
The professionals named in the filing: Architect: VK: a architecture; Architect: ANA Consortium Pvt Ltd; Engineer: CBRE South Asia Pvt. Ltd.; Engineer: Mangesh Avinash Lawand; Engineer: Mujeebur Rahman; Engineer: Kasturi Gandhi. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Godrej Sky Greens Phase 2?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.