ReraGenieLog inGet a buyer report

Home / Browse projects / Mumbai Suburban, Maharashtra / Godrej Reserve Wing 2

Registered Litigation declared Others project

Godrej Reserve Wing 2

By GODREJ PROPERTIES LIMITED

RG-MH-31123 · RERA P51800079457 · Last updated on MahaRERA portal: 11 Jun 2026

Source: official MahaRERA filing

Red flags

  • Litigation declared, 12 cases

Clear

  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • All 13 earlier projects delivered on promise

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Jun 2031Possession promisedno revision filed
2 of 22Construction stages doneacross 2 buildings; furthest along: Basement (if any), 0%
221 of 308Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 114 documents Report an error

Godrej Reserve Wing 2 is a Others project by GODREJ PROPERTIES LIMITED in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800079457 on 6 Mar 2025. Possession is promised by 30 Jun 2031. 87 of the 308 units on this registration are recorded sold or booked, and 2 of 22 construction stages are filed complete.

At a glance

Project

  • NameGodrej Reserve Wing 2
  • TypeOthers
  • Location
    • Akurli Road
    • Off Western Express Highway
    • R/S Ward
    • Mumbai-400101
    • Akurli
    • Borivali
    • Mumbai Suburban
    • 400101
  • Pincode400101
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800079457
  • ReraGenie IDRG-MH-31123

Builder

  • NameGODREJ PROPERTIES LIMITED
  • Entity typeCompany
  • CINL74120MH1985PLC035308
  • GSTIN27AAACG3995M1Z1
  • GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • Managing DirectorGaurav Pandey
  • Other registrations27 more →
  • Completed5 of 28
  • No longer live1 lapsed, de-registered or revoked
  • Declared earlier projects35 →

Key dates

this monthRegisteredMar 2025PromisedJun 2031

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on6 Mar 2025
  • Promised completion30 Jun 2031
  • Revised completionNone
  • Buildings2 building records
  • Documents filed114 files

Current status

28%87 of 308 units booked
17.6%Work done, per cost certificate

Figures as on 11 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Wing 2NA52512630263
CommercialNA2204545

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 11 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

2 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Basement (if any), at 0%.

Wing 29%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Commercial9%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 11 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed644

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots644
Closed/Covered644
BuildingClosed/CoveredTotal
Wing 2579579
Commercial6565

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area15,984 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on14 Jul 2025

Approvals and building plan

Sanctioning authorityMCGM
Permissible FSI48748.13
Proposed, not sanctioned48,513 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchUNIVERSAL INSURANCE BUILDING,GROUND FLOOR SIR P M ROAD, FORT,MAHARASHTRA,400001
Estimated costRs 583.53 cr
Cost incurredRs 102.89 cr
Work done17.63%
BuildingWingEstimatedIncurred
Wing 2NARs 540.14 crRs 65.22 cr
CommercialNARs 38.65 crRs 32.92 cr
-NARs 4.74 crRs 4.74 cr

Certifying professionals and partners7

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectR Design Architects
EngineerRajendra Joshi
EngineerVinyasa Consultants
EngineerSamartha Constro Consultants LLP
Chartered AccountantPiyush Jain
Chartered AccountantBSR and Co. LLP
Chartered AccountantB S R & Co. LLP ( 101248W/W-100022)
PartnerRole in project
GODREJ PROPERTIES LIMITED-

Litigation declared12

CaseCourtStatus
12/15 of 2012/2012Court of Small Causes at Mumbai Bandra BranchPending
13/16 of 2012/2012Court of Small Causes at Mumbai Bandra BranchPending
14/17 of 2012/2012Court of Small Causes at Mumbai Bandra BranchPending
15/18 of 2012/2012Court of Small Causes at Mumbai Bandra BranchPending
16/19 of 2012/2012Court of Small Causes at Mumbai Bandra BranchPending
17/20 of 2012/2012Court of Small Causes at Mumbai Bandra BranchPending
18/21 of 2012/2012Court of Small Causes at Mumbai Bandra BranchPending
195/215 of 2014/2014Court of Small Causes at Mumbai Bandra BranchPending
216 of 2014/2014Court of Small Causes at Mumbai Bandra BranchPending
Application 1 of 2023/2023Honorable Joint Charity CommissionerPending
26898/2024High Court BombayPending
WP L No 2848/2025High Court BombayPending

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 21 Feb 2025
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 18 Sep 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 12 Sep 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 21 Feb 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Jun 2031

Documents filed114

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 114 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2025-2026)File: Godrej Reserve_Form 2A_Tower 2.pdf11 Jun 2026
Withdrawal Update Form 1File: Godrej Reserve - Form 1 - Architects Certificate - FY26Q4 - T2.pdf17 Apr 2026
Withdrawal Update Form 2File: GODREJ RESERVE-T2_KANDIVALI_EC_31MAR26 - Final.pdf17 Apr 2026
Withdrawal Update Form 3File: Withdrawal Application Form 3_Reserve_T2_FY26Q4 2.pdf17 Apr 2026
Withdrawal Update Form 1File: Godrej Reserve - Form 1 - Architect Certificate - FY26Q3 - T2.pdf17 Jan 2026
Withdrawal Update Form 2File: GODREJ RESERVE-T2_KANDIVALI_EC_DEC 25 - Final.pdf17 Jan 2026
Withdrawal Update Form 3File: CA Certificate T-2.pdf17 Jan 2026
Withdrawal Update Form 1File: RERA certificate Wing 2_Sept 25.pdf20 Oct 2025
Withdrawal Update Form 2File: GODREJ RESERVE-T2_KANDIVALI_EC_SEPTu002725 - Final.pdf20 Oct 2025
Withdrawal Update Form 3File: CA CERTIFICATE T-2.pdf20 Oct 2025
Layout approvalFile: 1- Revised Layout_marked.pdf18 Sep 2025
Building plan approvalFile: 2 - Revised Plans.pdf12 Sep 2025
Building plan approvalFile: 3 - Revised Plans.pdf12 Sep 2025
Building plan approvalFile: 4 - Revised Plans.pdf12 Sep 2025
Building plan approvalFile: 5 - Revised Plans.pdf12 Sep 2025
Building plan approvalFile: 6 - Revised Plans.pdf12 Sep 2025
Building plan approvalFile: 7 - Revised Plans.pdf12 Sep 2025
Building plan approvalFile: 8 - Revised Plans.pdf12 Sep 2025
Building plan approvalFile: 9 - Revised Plans.pdf12 Sep 2025
Building plan approvalFile: 10 - Revised Plans.pdf12 Sep 2025
Building plan approvalFile: 11 - Revised Plans.pdf12 Sep 2025
Building plan approvalFile: 12 - Revised Plans.pdf12 Sep 2025
Building plan approvalFile: 13 - Revised Plans.pdf12 Sep 2025
Building plan approvalFile: 14 - Revised Plans.pdf12 Sep 2025
Building plan approvalFile: 15 - Revised Plans.pdf12 Sep 2025
Form 5 (FY 2024-2025)File: Godrej Reserve Wing 2 S_rev.pdf28 Aug 2025
Form 1File: Form 1- RERA certificate Wing 2_June 25..pdf17 Jul 2025
Form 2File: Form 2- EC June 25.pdf17 Jul 2025
Form 3File: Form 3- CA Certificate T2.pdf17 Jul 2025
Disclosure of Sold and Booked InventoryFile: Disclosure Sold Unsold - T2.pdf17 Jul 2025
Form 2A (FY 2024-2025)3 Jun 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Wing 2 Architect.pdf18 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Wing 2 CA.pdf18 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: T2 Engineer.pdf18 Apr 2025
Disclosure of sold/ booked inventoryFile: W2 Retail Declaration.pdf18 Apr 2025
Declaration about Commencement CertificateFile: CC Declaration - Final 3325.pdf3 Mar 2025
Layout approvalFile: Layout - Final.pdf28 Feb 2025
Building plan approvalFile: 2025-02-24 Amended Letter.pdf28 Feb 2025
Copy of Layout Approval (in case of layout)File: Layout - Final.pdf28 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf28 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate - Final.pdf28 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate.pdf28 Feb 2025
Building Plan Approval / NA Order for plotted developmentFile: 2025-02-24 Amended Letter.pdf28 Feb 2025
Other - LegalFile: Registered Conveyance Deed_compressed (1)-2_compressed-2.pdf28 Feb 2025
Other - LegalFile: Registered Conveyance Deed_compressed (1)-10.pdf28 Feb 2025
Other - LegalFile: Registered Conveyance Deed_compressed (1)-9.pdf28 Feb 2025
Other - LegalFile: Registered Conveyance Deed_compressed (1)-8.pdf28 Feb 2025
Other - LegalFile: Registered Conveyance Deed_compressed (1)-7.pdf28 Feb 2025
Other - LegalFile: Registered Conveyance Deed_compressed (1)-6.pdf28 Feb 2025
Other - LegalFile: Registered Conveyance Deed_compressed (1)-5.pdf28 Feb 2025
Other - LegalFile: Registered Conveyance Deed_compressed (1)-3.pdf28 Feb 2025
Other - LegalFile: Registered Conveyance Deed_compressed (1)-2_compressed-1.pdf28 Feb 2025
Other - LegalFile: Registered Conveyance Deed_compressed (1)-1.pdf28 Feb 2025
Other - LegalFile: Registered Conveyance Deed_compressed (1)-4.pdf28 Feb 2025
Disclosure for secured/unsecured finance availed for the projectFile: Disclosure Secured Unsecured - Final.pdf28 Feb 2025
Building plan approvalFile: Section plan (2).pdf26 Feb 2025
Building Plan Approval / NA Order for plotted developmentFile: Section plan (2).pdf26 Feb 2025
Building plan approvalFile: Floor Plans - Wing 2_1-1.pdf24 Feb 2025
Building plan approvalFile: Floor Plans - Wing 2_3-3.pdf24 Feb 2025
Building plan approvalFile: Floor Plans - Wing 2_4-4.pdf24 Feb 2025
Building plan approvalFile: Floor Plans - Wing 2_5-end.pdf24 Feb 2025
Building plan approvalFile: Amended Drawing 1 to 11-flat-2.pdf24 Feb 2025
Building plan approvalFile: Amended Drawing 1 to 11-flat-3.pdf24 Feb 2025
Building plan approvalFile: Amended Drawing 1 to 11-flat-4_compressed (1).pdf24 Feb 2025
Building plan approvalFile: Amended Drawing 1 to 11-flat-5.pdf24 Feb 2025
Building plan approvalFile: Amended Drawing 1 to 11-flat-6.pdf24 Feb 2025
Building plan approvalFile: Amended Drawing 1 to 11-flat-7.pdf24 Feb 2025
Building plan approvalFile: Amended Drawing 1 to 11-flat-8.pdf24 Feb 2025
Building plan approvalFile: Amended Drawing 1 to 11-flat-9.pdf24 Feb 2025
Building plan approvalFile: Amended Drawing 1 to 11-flat-11.pdf24 Feb 2025
Building plan approvalFile: Amended Drawing 1 to 11-flat-10.pdf24 Feb 2025
Building Plan Approval / NA Order for plotted developmentFile: Amended Drawing 1 to 11-flat-4_compressed (1).pdf24 Feb 2025
Building Plan Approval / NA Order for plotted developmentFile: Amended Drawing 1 to 11-flat-10.pdf24 Feb 2025
Building Plan Approval / NA Order for plotted developmentFile: Amended Drawing 1 to 11-flat-11.pdf24 Feb 2025
Building Plan Approval / NA Order for plotted developmentFile: Amended Drawing 1 to 11-flat-9.pdf24 Feb 2025
Building Plan Approval / NA Order for plotted developmentFile: Amended Drawing 1 to 11-flat-8.pdf24 Feb 2025
Building Plan Approval / NA Order for plotted developmentFile: Amended Drawing 1 to 11-flat-7.pdf24 Feb 2025
Building Plan Approval / NA Order for plotted developmentFile: Amended Drawing 1 to 11-flat-6.pdf24 Feb 2025
Building Plan Approval / NA Order for plotted developmentFile: Amended Drawing 1 to 11-flat-5.pdf24 Feb 2025
Building Plan Approval / NA Order for plotted developmentFile: Amended Drawing 1 to 11-flat-3.pdf24 Feb 2025

Promoter's earlier projects13

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

13 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
GODREJ RESERVE WING 5AKURLI ROAD OFF WETERN EXPRESS HIGHWAY-OngoingJun 2030Jun 2030
GODREJ RESERVE WING 4AKURLI ROAD OFF WETRN EXPRESS HIGHWAY AKURLI MUMBAI SUBURBAN-OngoingJun 2030Jun 2030
GODREJ RESERVE WING 1AKURLI ROAD OFF WETERN EXPRESS HIGHWAY AKURLI MUMBAI SUBURBAN-OngoingJun 2030Jun 2030
Godrej Ascend Phase 4Locality Dhokali Naka Village Thane M Crop Taluka Thane Dist Thane191OngoingDec 2029Dec 2029
Godrej CarmichaelMalabar Cumbala Hill M L Dahanukar Marg Mumbai 40002618OngoingOct 2029Oct 2029
Godrej Ascend Phase 3Village Thane M Crop Taluka Thane Dist Thane497OngoingOct 2029Oct 2029
Godrej Sky TerracesVillage Deonar Street Deonar Farm Road Mumbai 40008855OngoingMar 2029Mar 2029
Godrej Ascend Phase 2Village Thane M Crop Taluka Thane Dist Thane198OngoingDec 2028Dec 2028
Godrej Ascend Phase 1Village Thane M Crop Taluka Thane Dist Thane654OngoingApr 2028Apr 2028
Godrej Emerald WatersVillage Pimpri Chinchwad M Crop Taluka Haveli Dist Pune139OngoingMar 2028Mar 2028
Godrej Riviera Phase 1Taluka Kalyan Dist Thane4OngoingDec 2026Dec 2026
Godrej Urban ParkVillage Kurla Taluka Kurla Dist Mumbai Suburban579OngoingSep 2026Sep 2026
Godrej Orchard EstateVillage Besa Ghogli Road District Nagpur PIN 440034 Maharashtra-OngoingDec 2024Dec 2024

How this compares with Mumbai Suburban

28%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Godrej Reserve Wing 2 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near R/S Ward, Mumbai-4001016,700+ in Mumbai Suburban

2 kmGodrej Reserve Wing 2Completed 81Lapsed / revoked 57Other 117Dot size: filed unitsN

Filed coordinates, straight-line distance. 255 registered projects within 2 km.

Builder: GODREJ PROPERTIES LIMITED

Godrej Properties Limited has 28 registrations on MahaRERA, including The Trees, Residential Phase 1 and Godrej Anandam. Its filings disclose 35 earlier MahaRERA projects: declares 28 of 30 past projects completed on time. Litigation is declared on 7 of its registrations. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if Godrej Reserve Wing 2 is delayed beyond 30 Jun 2031?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Godrej Reserve Wing 2?

The registered promoter entity is GODREJ PROPERTIES LIMITED, a company as per the filing. Its CIN L74120MH1985PLC035308 and GSTIN 27AAACG3995M1Z1 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Godrej Reserve Wing 2?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Godrej Reserve Wing 2?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Godrej Reserve Wing 2?

The professionals named in the filing: Architect: R Design Architects; Engineer: Rajendra Joshi; Engineer: Vinyasa Consultants; Engineer: Samartha Constro Consultants LLP; Chartered Accountant: Piyush Jain; Chartered Accountant: BSR and Co. LLP. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Godrej Reserve Wing 2?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Godrej Reserve Wing 2. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Godrej Reserve Wing 2 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.