Completed No litigation declared Residential / Group Housing project

Godrej Prana

By DREAM WORLD LANDMARKS LLP

RG-MH-10067 · RERA P52100001372 · Last updated on MahaRERA portal: 13 Jul 2022

Source: official MahaRERA filing

Red flags

  • 4 complaints at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Sep 2020Possession promisedregistration recorded completed
70 of 77Construction stages doneacross 7 buildings; furthest along: Stilt Floor, 0%
4Complaints at MahaRERAon this registration
Jump to the 46 documents Report an error

Godrej Prana is a Residential / Group Housing project by DREAM WORLD LANDMARKS LLP in Pune, Maharashtra, registered with MahaRERA as P52100001372 on 27 Jul 2017. The registration is recorded completed; possession was promised by 30 Sep 2020. 4 complaints are on record with the regulator.

At a glance

Project

  • NameGodrej Prana
  • TypeResidential / Group Housing
  • Location
    • UNDRI HANDEWADI ROAD
    • UNDRI
    • Haveli
    • Pune
    • 412207
  • Pincode412207
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100001372
  • ReraGenie IDRG-MH-10067

Builder

  • NameDREAM WORLD LANDMARKS LLP
  • Entity typeOthers
  • Named personsGodrej Properties Limited, DEVI HILL PARADISE LLP, LOTUS LAND DEVELOPERS LLP, SANSKRITI LAND DEVELOPERS LLP, PARIJAT LAND DEVELOPERS LLP
  • Other registrations2 more →
  • Completed2 of 3
  • Declared earlier projects2 →

Key dates

this monthRegisteredJul 2017PromisedSep 2020Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on27 Jul 2017
  • Promised completion30 Sep 2020
  • Revised completionNone
  • Buildings7 building records
  • Documents filed46 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
TOWER ANA140000
TOWER BNA160000
TOWER CNA160000
TOWER DNA160000
TOWER ENA160000
TOWER FNA160000
TOWER GNA140000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building7

As on 13 Jul 2022, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

70 of 77 construction stages are filed complete across 7 buildings. The stage furthest along is Stilt Floor, at 0%.

TOWER A91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
TOWER B91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
TOWER C91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
TOWER D91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
TOWER E91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
TOWER F91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
TOWER G91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities16

As on 13 Jul 2022, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsYes100%
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%
Others Underground water tankYes100%

Parking filed544

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots544
Closed/Covered544
BuildingClosed/CoveredTotal
TOWER A134134
TOWER B9696
TOWER C9797
TOWER D4343
TOWER E4343
TOWER F4343
TOWER G8888

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area27,947 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI57149.72
Proposed, not sanctioned57,150 sq m
Buildings approved7
Buildings sanctioned7

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchMANEKJI WADIA BLDG GROUND FLOOR NANIK MOTWANI MARG FORT MUMBAI - 400001

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectKIPA architects
EngineerCushman & Wakefield
Chartered AccountantM D Deshpande & Co.
PartnerRole in project
DREAM WORLD LANDMARKS LLP-

Litigation declared13

CaseCourtStatus
SCS 440/2017/2017Civil Court Senior DivisionPENDING
SCS 609/2017/2017Civil Court Senior DivisionPENDING
RCS 1936/2016/2016Civil Court Junior DivisionPENDING
Appeal no 4257/2018/2018Deputy Director of Land RecordsPENDING
RCS 4469/2013/2013Civil Court Junior DivisionPENDING
RCC 26/2017/2017Judicial Magistrate First ClassPENDING
RCS 887/2017/2017Civil Court Jr Division PunePENDING
Misc Civil Appeal 146/2018/2018District CourtPENDING
RCS 259/2019Civil Court Junior DivisionPENDING
S C S 415/2019Civil Court Senior DivisionPENDING
CC005000000022721/2019/2019RERADISPOSED OF
CC/331/2019/2019National Consumer Disputes Redressal Commission DelhiPENDING
1003/2017JMFC Cantonment Court PuneReply Unready

Complaints filed with MahaRERA4

Case no.ComplainantRespondentFiled
CC005000000022721ATUL MAHADEV BHAGTDreamworld Landmarks LLP28/02/2019
CC005000000023121Arif Elahi ShamsiMohit Malhotra11/06/2019
CC005000000064655Kishan H RathodDream World Landmarks LLP08/10/2020
CC005000000127087Anant Ram KoriDream World LandmarkLLP13/05/2022

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 22 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 8 Nov 2019
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 19 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 26 Oct 2019Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 19 Apr 2021

Documents filed46

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Disclosure of sold/ booked inventoryFile: Prana - Disclosure of inventory.pdf13 Jul 2022
Disclosure of sold/ booked inventoryFile: Disclosure of inventory.pdf14 Apr 2022
Disclosure of sold/ booked inventoryFile: Prana Sep 21 .pdf26 Oct 2021
Disclosure of sold/ booked inventoryFile: Prana compressed.pdf15 Jul 2021
Architect’s Certificate on Completion of Project (Form 4)File: Form 04 - Architect's Certificate Prana.pdf27 May 2021
Disclosure of sold/ booked inventoryFile: Prana Towers A to G compressed opt.pdf24 May 2021
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC Prana - Tower G.pdf19 Apr 2021
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: F Building OC.pdf19 Apr 2021
Status of Formation of Legal Entity (Society/Co Op etc.)File: Prana Society Registration Certificate.pdf16 Apr 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Prana Form 5 UPLOAD.pdf1 Oct 2020
Proforma of Allotment letterFile: ReraPranaAgreement 31st March 30 updated.pdf31 Mar 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Prana Architect certificate 30 Sept 2019 compressed.pdf24 Mar 2020
Certificates of CA (Form 3)File: Godrej Prana CA 30 Sept 2019 1 to 3 compressed.pdf24 Mar 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: RERA certificate for work status Execution 31012020.pdf23 Mar 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: RERA - Engineer Monthly Certificate 31012020 - Copy.pdf23 Mar 2020
Certificates of CA (Form 3)File: CA Prana 31012020 FY201920 one compressed.pdf23 Mar 2020
Certificates of CA (Form 3)File: CA Prana 31012020 FY201920 two compressed.pdf23 Mar 2020
Certificates of CA (Form 5)File: CA Prana 31012020 FY201920 one compressed.pdf23 Mar 2020
Layout approvalFile: Prana Greens Layout -converted.pdf8 Nov 2019
Copy of Layout Approval (in case of layout)File: Prana Greens Layout -converted.pdf8 Nov 2019
Commencement Certificates / NA Order for plotted developmentFile: Prana DP CC_0059.pdf26 Oct 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Prana-KIPA-Architect Certificate 30-07-2019.pdf26 Oct 2019
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Prana Completion Bldg B C Part II.pdf26 Oct 2019
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Prana Completion Bldg D E Part IV.pdf26 Oct 2019
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: COMPLETION -PART I - PRANA.pdf26 Oct 2019
Certificates of CA (Form 5)File: Godrej Prana.pdf30 Sep 2019
Certificates of CA (Form 5)File: Prana.pdf30 Sep 2018
Proforma of Allotment letterFile: Docs Prana.pdf5 Jun 2018
Proforma of Allotment letterFile: Docs Prana.pdf31 May 2018
Proforma of Allotment letterFile: Prana - 27-3-2018.pdf27 Mar 2018
Proforma of Allotment letterFile: Prana - updated.pdf6 Mar 2018
Proforma of Allotment letterFile: Prana RERA - AFS.pdf14 Nov 2017
Copy of the legal title reportFile: Prana_Title Certificate_Main-compressed.pdf22 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect's Certificate_Infinity_Revised-compressed.pdf22 Jul 2017
Proforma of Allotment letterFile: Prana_Proforma Allotment and AFS-compressed.pdf22 Jul 2017
Certificates of CA (Form 3)File: CA CERTIFICATE-compressed.pdf21 Jul 2017
Layout approvalFile: PRANA LAYOUT PLAN.pdf19 Jul 2017
Building plan approvalFile: PRANA_IOD.pdf19 Jul 2017
PAN CardFile: DWLLP Pan Card.pdf19 Jul 2017
Copy of the legal title reportFile: PRANA_TITLE CERTIFICATE.pdf19 Jul 2017
Details of encumbrancesFile: Encumbrance - Prana.pdf19 Jul 2017
Copy of Layout Approval (in case of layout)File: PRANA LAYOUT PLAN.pdf19 Jul 2017
Building Plan Approval (IOD)File: PRANA_IOD.pdf19 Jul 2017
Commencement Certificates / NA Order for plotted developmentFile: PRANA_Commencement certificate.pdf19 Jul 2017
Declaration in FORM BFile: Godrej Prana Form B-Compressed.pdf19 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: RERA - Engineer's certificate.pdf19 Jul 2017

How this compares with Pune

26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Godrej Prana on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near UNDRI13,700+ in Pune

2 kmGodrej PranaCompleted 65Lapsed / revoked 29Other 48Dot size: filed unitsN

Filed coordinates, straight-line distance. 142 registered projects within 2 km.

Builder: DREAM WORLD LANDMARKS LLP

DREAM WORLD LANDMARKS LLP has 3 registrations on MahaRERA, including Godrej Greens and Godrej Prana. Its filings disclose 2 earlier MahaRERA projects: declares 0 of 1 past projects completed on time. Litigation is declared on 2 of its registrations. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Godrej Prana is delayed beyond 30 Sep 2020?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Godrej Prana?

The registered promoter entity is DREAM WORLD LANDMARKS LLP, an others as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Godrej Prana?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Godrej Prana?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Godrej Prana?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Godrej Prana?

The professionals named in the filing: Architect: KIPA architects; Engineer: Cushman & Wakefield; Chartered Accountant: M D Deshpande & Co.. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Godrej Prana?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Godrej Prana. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Godrej Prana to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.