Completed Litigation declared Residential / Group Housing project

Godrej Hillside 1

By Mahalunge Township Developers LLP

RG-MH-13055 · RERA P52100022099 · Last updated on MahaRERA portal: 11 Feb 2025

Source: official MahaRERA filing

Red flags

  • Litigation declared, 5 cases
  • 3 complaints at MahaRERA
  • Rs 321.00 crore secured on the land, in favour of ICICI Bank Limited

Clear

  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Oct 2024Possession promisedregistration recorded completed
36 of 44Construction stages doneacross 4 buildings; furthest along: Podiums (if any), 0%
3Complaints at MahaRERAon this registration
Jump to the 114 documents Report an error

Godrej Hillside 1 is a Residential / Group Housing project by Mahalunge Township Developers LLP in Pune, Maharashtra, registered with MahaRERA as P52100022099 on 27 Aug 2019. The registration is recorded completed; possession was promised by 30 Oct 2024. 3 complaints are on record with the regulator.

At a glance

Project

  • NameGodrej Hillside 1
  • TypeResidential / Group Housing
  • Location
    • MDR Road
    • Mahalunge
    • Mulshi
    • Pune
    • 411045
  • Pincode411045
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100022099
  • ReraGenie IDRG-MH-13055

Builder

  • NameMahalunge Township Developers LLP
  • Entity typeOthers
  • GSTIN27AAOFG3727E1ZC
  • Named personsGodrej Properties Limited, Mahalunge Land Developers LLP
  • Other registrations1 more →
  • Completed2 of 2
  • Declared earlier projects1 →

Key dates

this monthRegisteredAug 2019PromisedOct 2024Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on27 Aug 2019
  • Promised completion30 Oct 2024
  • Revised completionNone
  • Buildings4 building records
  • Documents filed114 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Tower 1NA250000
Tower 2NA250000
Tower 3NA250000
Tower 4NA50000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building4

As on 11 Feb 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

36 of 44 construction stages are filed complete across 4 buildings. The stage furthest along is Podiums (if any), at 0%.

Tower 182%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Tower 282%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Tower 382%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Tower 482%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 11 Feb 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed2579

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots2,579
Closed/Covered1,092
Open Space1,487
BuildingClosed/CoveredOpen SpaceTotal
Tower 1364495859
Tower 2364495859
Tower 3364497861

Land and ownership

A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area17,412 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared present
Charge in favour ofICICI Bank Limited
Secured amountRs 321.00 crore
CERSAI search filedYes
Declared on27 Sep 2024

Approvals and building plan

Sanctioning authorityPune Metropolitan Region Development Authority (PMRDA)
Permissible FSI41144.73
Proposed, not sanctioned41,145 sq m
Buildings approved4
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchThe Address Commercia,Survey no 154,Shop no 118,119,120,Mumbai Bangalore Highway,Wakad,Pune- 411057

Certifying professionals and partners7

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectV K a Architecture
ArchitectVK:a architecture
EngineerBricklane
EngineerMelior Structural Solution Private Limited
EngineerSamartha Constro Consultants LLP
Chartered AccountantM D Deshpande & Co
Chartered AccountantB S R & Co. LLP
PartnerRole in project
Mahalunge Township Developers LLP-

Litigation declared5

CaseCourtStatus
RCS 1233/2014Civil Judge Junior DivisionOngoing
RCS 822/2008Civil Judge Junior DivisionClosed
RCA 601/2014District Judge and Addl Sessions Judge PuneOngoing
RCA-601/2014/2014Pune District and Sessions CourtOngoing
RCS-170/2021/2021Pune District & Sessions CourtOngoing

Complaints filed with MahaRERA3

Case no.ComplainantRespondentFiled
CC005000000095745Sunita Mukund SuryawanshiMhalunge Township Developers LLP09/07/2021
CC005000000177843Mohit Narayan ChaudharyMahalunge Township Developers LLP27/11/2022
CC005000000269699Anis GuptaGodrej Properties04/11/2023

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 2 Jun 2020
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 6 Aug 2019
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 6 Aug 2019
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 6 Aug 2019Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 14 Nov 2024

Documents filed114

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 114 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect’s Certificate on Completion of Project (Form 4)File: Form 4 - Godrej Hillside 1.pdf11 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Hillside 1 _ Form 1 _ Q3 FY25.pdf17 Jan 2025
Certificates of CA (Form 3)File: Form 3 _ Hillside 1 _ Q3 FY25.pdf15 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Godrej Hillside 1 _ Form 2 _ Q3 FY25.pdf13 Jan 2025
Disclosure of sold/ booked inventoryFile: Godrej Hillside 1 _ Inventory Data _ Q3 FY25.pdf13 Jan 2025
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: R3 Full OC 21-03-2023.pdf14 Nov 2024
Disclosure of sold/ booked inventoryFile: Godrej Hillside 1.pdf16 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Hillside 1.pdf15 Oct 2024
Certificates of CA (Form 3)File: Form 3 - Hillside 1.pdf15 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Hillside 1.pdf12 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Hillside 1.pdf12 Oct 2024
Form 5 (FY 2023-2024)File: Hillside 1.pdf30 Sep 2024
Certificates of CA (Form 3)File: HillSide 1.pdf19 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 240630 - RERA Certificate (Form 1) - R3.pdf18 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Hill Side 1.pdf18 Jul 2024
Disclosure of sold/ booked inventoryFile: Godrej Hill Side 1.pdf13 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Hillside -1 R3 - Form 2A.pdf18 Apr 2024
Disclosure of sold/ booked inventoryFile: Godrej Hill Side 1.pdf18 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Mahalunge _ Hillside 1.pdf17 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Mahalunge _ HILLSIDE 1.pdf17 Apr 2024
Certificates of CA (Form 3)File: Mahalunge _ Hillside 1_Form 3.pdf17 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 231231 - RERA Certificate - Hillside 1.pdf15 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: HS1 (2).pdf15 Jan 2024
Disclosure of sold/ booked inventoryFile: Inventory Data _ Godej Hill Side 1 _ Q3 FY24_11zon.pdf15 Jan 2024
Certificates of CA (Form 3)File: Godrej HillSide 1.pdf15 Jan 2024
Disclosure of sold/ booked inventoryFile: HILLSIDE 1.pdf25 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 230930 - RERA Certificate R3_Hillside 1.pdf17 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: HS1.pdf17 Oct 2023
Certificates of CA (Form 3)File: MDD_Godrej Hillside 1 SIGNED.pdf17 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Godrej Hillside I.pdf22 Sep 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf20 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer_certificate_Hillside_Mahalunge_June23_11zon.pdf20 Jul 2023
Disclosure of sold/ booked inventoryFile: Godrej Hillside 1_11zon.pdf20 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf17 Apr 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Hillside01_RERA_Engineer_certificate.pdf17 Apr 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Hillside_Quality_certificate_2023_compressed.pdf17 Apr 2023
Disclosure of sold/ booked inventoryFile: Godrej Hillside 1_compressed.pdf17 Apr 2023
Certificates of CA (Form 3)File: CAHillside 1.pdf17 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Hill side 1_compressed.pdf20 Jan 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Godrej Hillside 1_Engineer's certificate_Dec-22.pdf20 Jan 2023
Disclosure of sold/ booked inventoryFile: Godrej Hillside 1.pdf20 Jan 2023
Certificates of CA (Form 3)File: MDD_ Certificate Hillside 1 RERA_Signed.pdf20 Jan 2023
Certificates of CA (Form 3)File: MDD Certificate Hillside 1 RERA CA.pdf18 Oct 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect's Certificate HILLSIDE 1.pdf17 Oct 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Godrej Hillside 1RERA Engineer's certificate300922.pdf17 Oct 2022
Disclosure of sold/ booked inventoryFile: Godrej Hillside 1 Inventory.pdf17 Oct 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Godrej Hillside 1.pdf30 Sep 2022
Disclosure of sold/ booked inventoryFile: Godrej Hillside 1 for uploading.pdf15 Jul 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Hillside-1 Engineer certificate_compressed.pdf11 Jul 2022
CERSAI detailsFile: CERSAI_Search_Report_Manjri1.pdf7 Jul 2022
CERSAI detailsFile: CERSAI_Search_Report_Mahalunge.pdf7 Jul 2022
Certificates of CA (Form 3)File: MDD_ Certificate Hillside 1 RERA_Signed.pdf7 Jul 2022
Certificates of CA (Form 3)File: MDD_ Certificate Hillside 1 RERA Signed.pdf10 May 2022
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: R3.pdf20 Apr 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 220405 RERA Certificate R3.pdf11 Apr 2022
Certificates of CA (Form 3)File: Signed HillSide 1 Mar 22.pdf11 Apr 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Hill side 1 Engineers Certificate.pdf7 Apr 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Hillside 1 Quality certificate2A.pdf7 Apr 2022
Disclosure of sold/ booked inventoryFile: Godrej Hillside 1 for uploading.pdf7 Apr 2022
Certificates of CA (Form 3)File: CA Hillside 1 311221 compressed.pdf7 Mar 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch Cert Hillside 1.pdf15 Feb 2022
Disclosure of sold/ booked inventoryFile: Mahalunge H1.pdf2 Feb 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Hillside 1 Engineers Certificate 311221.pdf31 Jan 2022
Status of Formation of Legal Entity (Society/Co Op etc.)File: Hillside 1 Society Certificate.pdf3 Jan 2022
Certificates of CA (Form 3)File: R3-30 Sep 2021-Rera_MDD_Draft_Signed.pdf15 Nov 2021
Disclosure of sold/ booked inventoryFile: Hillside 1 - All Towers.pdf26 Oct 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: R3 Form 2.pdf8 Oct 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Hillside 1 2A_compressed.pdf8 Oct 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 211001 - RERA Arch Certificate Hillside 1_compressed.pdf7 Oct 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: HILLSIDE 1_FORM 5.pdf30 Sep 2021
Disclosure of sold/ booked inventoryFile: Hillside 1 - All Towers compressed July.pdf19 Aug 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 30 June 2021 Hillside 1 R3 Engr Certificate.pdf27 Jul 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Hillside 1 QAQC Jun21.pdf27 Jul 2021
Certificates of CA (Form 3)File: R3 30 June 2021Rera Form 3 Signed.pdf20 Jul 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 210715 RERA Certificate R3 Signed compressed.pdf16 Jul 2021
Disclosure of sold/ booked inventoryFile: Hillside 1 - All Towers compressed.pdf5 Jun 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate- Godrej Hillside 1.pdf6 Apr 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate- Godrej Hillside 1-compressed- UPLOAD.pdf6 Apr 2021
Certificates of CA (Form 3)File: CA Certificate- Godrej Hillside 1, Q3.pdf6 Apr 2021
Details of encumbrancesFile: Hillside 1- Executed Encumbrance Certificate.pdf28 Jan 2021

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 under way, not due yet
ProjectLocationFlatsRegisteredStatusPromisedDelivered
Godrej River RoyaleP52100052957Mahalunge, Pune370Oct 2023OngoingMar 2029Not due yet

How this compares with Pune

26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Godrej Hillside 1 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Mahalunge13,700+ in Pune

Builder: Mahalunge Township Developers LLP

Mahalunge Township Developers LLP has 2 registrations on MahaRERA, including Godrej Hillside 1 and Godrej Hillside 2. Its filings disclose 1 earlier MahaRERA project, none completed yet. Litigation is declared on 2 of its registrations. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Godrej Hillside 1 is delayed beyond 30 Oct 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Godrej Hillside 1?

The registered promoter entity is Mahalunge Township Developers LLP, an others as per the filing. Its GSTIN 27AAOFG3727E1ZC can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Godrej Hillside 1?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Godrej Hillside 1?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Godrej Hillside 1?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Godrej Hillside 1?

The professionals named in the filing: Architect: V K a Architecture; Architect: VK:a architecture; Engineer: Bricklane; Engineer: Melior Structural Solution Private Limited; Engineer: Samartha Constro Consultants LLP; Chartered Accountant: M D Deshpande & Co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Godrej Hillside 1?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Godrej Hillside 1. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Godrej Hillside 1 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.