Home / Browse projects / Pune, Maharashtra / VTP Aethereus- Phase1
VTP Aethereus- Phase1
By HOME RISING CONSTRUCTION LLP
RG-MH-16756 · RERA P52100026772 · Last updated on MahaRERA portal: 20 Jul 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 4 months past the filed date
- 25 complaints at MahaRERA
- Completion date moved by 6 months
- 1 extension taken
- Rs 75.00 crore secured on the land, in favour of Aditya Birla Capital Ltd
Clear
- No litigation declared
- Separate project account declared
- Allotment letter follows the model form
6 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
VTP Aethereus- Phase1 is a Residential / Group Housing project by HOME RISING CONSTRUCTION LLP in Pune, Maharashtra, registered with MahaRERA as P52100026772 on 22 Oct 2020. Possession was promised by 30 Jun 2026 and is now 4 months past that date. The completion date has moved by 6 months from the original filing. 715 of the 718 units on this registration are recorded sold or booked, and 33 of 33 construction stages are filed complete. 25 complaints are on record with the regulator.
At a glance
Project
- NameVTP Aethereus- Phase1
- TypeResidential / Group Housing
- Location
- Mhalunge Mann Road
- Mhalunge
- Mahalunge
- Mulshi
- Pune
- 411045
- Pincode411045
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100026772
- ReraGenie IDRG-MH-16756
Builder
- NameHOME RISING CONSTRUCTION LLP
- Entity typePartnership
- PartnerBhushan Vilaskumar Palresha
- Other registrations2 more →
- Completed1 of 3
- No longer live2 lapsed, de-registered or revoked
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on22 Oct 2020
- Promised completion30 Jun 2026
- Revised completionRevised to 30 Jun 2026 (originally 30 Dec 2025)
- Buildings3 building records
- Documents filed120 files
Current status
Figures as on 20 Jul 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Tower-1 | NA | 34 | 31 | 240 | 0 | 240 |
| Tower-5 | NA | 35 | 31 | 240 | 0 | 240 |
| Tower-3 | NA | 35 | 31 | 238 | 0 | 238 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building3
As on 20 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
33 of 33 construction stages are filed complete across 3 buildings.
Tower-1100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Tower-5100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Tower-3100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 20 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | Yes | 100% |
| Community Buildings | Yes | 100% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 100% |
| Solid Waste Management And Disposal | Yes | 100% |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | Yes | 0% |
Parking filed45
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Open Space | Total |
|---|---|---|---|
| Tower-1 | 1 | 15 | 16 |
| Tower-5 | 1 | 12 | 13 |
| Tower-3 | 1 | 15 | 16 |
Land and ownership1
MahaRERA does not publish landowner contact details. A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.
| Landowner | Village | District |
|---|---|---|
| Mhalunge Land Developers LLP | Baner | Pune |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| Tower-3 | NA | Rs 86.16 cr | Rs 86.16 cr |
| Tower-5 | NA | Rs 71.43 cr | Rs 71.43 cr |
| Tower-1 | NA | Rs 61.22 cr | Rs 61.22 cr |
| - | NA | Rs 15.04 cr | Rs 14.96 cr |
Certifying professionals and partners8
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | ANA CONSORTIUM PVT LTD |
| Architect | VK Architects |
| Engineer | Harshal Deshmukh |
| Engineer | Bhupendra Kanade |
| Engineer | SHITAL KADAM |
| Chartered Accountant | SPAK & CO |
| Chartered Accountant | GMKS & CO. |
| Chartered Accountant | Priyanka Chordiya & Associates |
| Partner | Role in project |
|---|---|
| HOME RISING CONSTRUCTION LLP | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterThe project VTP Aethereus - Phase 1 comprises Tower 1, Tower 3, and Tower 5. Tower 1 has been 100% completed, and the Occupancy Certificate issued by PMRDA was received on 31/12/2024; Tower 3 has been 100% completed, and the Occupancy Certificate issued by PMRDA was received on 26/09/2025; and Tower 5 has been 100% completed, with the Occupancy Certificate issued by PMRDA received on 26/09/2025 up to the 26th floor, while the Occupancy Certificate for the remaining five floors is pending. In view of the above, we respectfully request that an extension up to 30/06/2026 be granted for obtaining
Complaints filed with MahaRERA25
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC005000000269690 | HOME RISING CONSTRUCTION LLP | PAVANKUMAR MAHADEV MUNDE | 05/11/2023 |
| CC005000000269691 | HOME RISING CONSTRUCTION LLP | RAFIQUE AHMED JAINUDDIN SAYYED | 03/11/2023 |
| CC005000000269692 | HOME RISING CONSTRUCTION LLP | KAVITA INDORE | 03/11/2023 |
| CC005000000269693 | HOME RISING CONSTRUCTION LLP | MEENA RAMKRISHNA MORE | 03/11/2023 |
| CC005000000279836 | HOME RISING CONSTRUCTION LLP | AKASH MISHRA | 04/01/2024 |
| CC005000000371044 | HOME RISING CONSTRUCTION LLP | AKASH MISHRA | 06/06/2024 |
| CC12400223 | Shantanu Shinde | HOME RISING CONSTRUCTION LLP | 25/09/2024 |
| CC12400863 | HOME RISING CONSTRUCTION LLP | BALKRISHNA MOHAN THOSAR | 23/11/2024 |
| CC12400867 | HOME RISING CONSTRUCTION LLP | SHASHIKANT BABANRAO BADHE | 23/11/2024 |
| CC12400869 | HOME RISING CONSTRUCTION LLP | GAURAV DILIP KHOT | 23/11/2024 |
| CC12401021 | HOME RISING CONSTRUCTION LLP | MANOHAR MAHADEV MAHAJAN | 04/12/2024 |
| CC12401023 | HOME RISING CONSTRUCTION LLP | NEHA NITIN KANDALKAR | 04/12/2024 |
| CC12500327 | Pratik Sunil Kamat | HOME RISING CONSTRUCTION LLP | 30/01/2025 |
| CC12600055 | Amit Piyushbhai Shah | HOME RISING CONSTRUCTION LLP | 04/01/2026 |
| CC12503087 | Rohit Koul | HOME RISING CONSTRUCTION LLP | 02/09/2025 |
| CC12504261 | Abhijit Manu Bhosale | HOME RISING CONSTRUCTION LLP | 03/12/2025 |
| CC12504397 | Geetika Dinesh Sen | HOME RISING CONSTRUCTION LLP | 10/12/2025 |
| CC12600585 | HOME RISING CONSTRUCTION LLP | GAURAV DILIP KHOT | 02/02/2026 |
| CC12600586 | HOME RISING CONSTRUCTION LLP | RAFIQUE AHMED JAINUDDIN SAYYED | 02/02/2026 |
| CC12600588 | HOME RISING CONSTRUCTION LLP | KAVITA INDORE | 02/02/2026 |
| CC12602181 | Mandar Rody | HOME RISING CONSTRUCTION LLP | 13/04/2026 |
| CC12602267 | Shubham Shivaji Nikam | HOME RISING CONSTRUCTION LLP | 17/04/2026 |
| CC12603345 | HOME RISING CONSTRUCTION LLP | MRS PRIYA SINGH | 01/06/2026 |
| CC12603346 | HOME RISING CONSTRUCTION LLP | MRS MRUDULA PATIL | 01/06/2026 |
| CC12604140 | HOME RISING CONSTRUCTION LLP | MRS ANURADHA ABHIJIT BHOSALE | 02/07/2026 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 20 Oct 2020 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 6 Nov 2020 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 20 Oct 2020 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 6 Nov 2020Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 4 Jan 2025
Documents filed120
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 120 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: RERA FORM-1 AETHEREUS PHASE 1.pdf | 20 Jul 2026 |
| Withdrawal Update Form 2File: VTP Aethereus Form 2.pdf | 20 Jul 2026 |
| Withdrawal Update Form 3File: FORM 3- AETHEREUS PHASE 1.pdf | 20 Jul 2026 |
| Form 2A (FY 2025-2026)File: VTP Aethereus RERA FORM 2A 2026 Phase 1.pdf | 18 Jun 2026 |
| Withdrawal Update Form 1File: FORM-1 AETHEREUS PHASE 1.pdf | 20 Apr 2026 |
| Withdrawal Update Form 2File: VTP Aethereus Form 2.pdf | 20 Apr 2026 |
| Withdrawal Update Form 3File: form- 3 aethereus phase 1.pdf | 20 Apr 2026 |
| Withdrawal Update Form 1File: RERA FORM-1 AETHEREUS PHASE 1.pdf | 20 Jan 2026 |
| Withdrawal Update Form 2File: Form 2_ VTP Aetherus Phase 1.pdf | 20 Jan 2026 |
| Withdrawal Update Form 3File: Form 3_VTP Aethereus Phase 1_Dec-25_11zon.pdf | 20 Jan 2026 |
| Withdrawal Update Form 1File: FORM 1 AETHEREUS PHASE 1.pdf | 31 Dec 2025 |
| Withdrawal Update Form 1File: FORM 1 AETHEREUS PHASE 1.pdf | 31 Dec 2025 |
| Withdrawal Update Form 2File: FORM 2 AETHEREUS PHASE 1.pdf | 31 Dec 2025 |
| Withdrawal Update Form 2File: FORM 2 AETHEREUS PHASE 1.pdf | 31 Dec 2025 |
| Withdrawal Update Form 3File: FORM 3- AETHEREUS PHASE 1_11zon.pdf | 31 Dec 2025 |
| Withdrawal Update Form 3File: FORM 3- AETHEREUS PHASE 1_11zon.pdf | 31 Dec 2025 |
| Withdrawal Update Form 1File: FORM 1 AETHEREUS PHASE 1.pdf | 16 Oct 2025 |
| Withdrawal Update Form 1File: FORM 1 AETHEREUS PHASE 1.pdf | 16 Oct 2025 |
| Withdrawal Update Form 1File: FORM 1 AETHEREUS PHASE 1.pdf | 16 Oct 2025 |
| Withdrawal Update Form 2File: FORM 2 AETHEREUS PHASE 1.pdf | 16 Oct 2025 |
| Withdrawal Update Form 2File: FORM 2 AETHEREUS PHASE 1.pdf | 16 Oct 2025 |
| Withdrawal Update Form 2File: FORM 2 AETHEREUS PHASE 1.pdf | 16 Oct 2025 |
| Withdrawal Update Form 3File: FORM 3- AETHEREUS PHASE 1_11zon.pdf | 16 Oct 2025 |
| Withdrawal Update Form 3File: FORM 3- AETHEREUS PHASE 1_11zon.pdf | 16 Oct 2025 |
| Withdrawal Update Form 3File: FORM 3- AETHEREUS PHASE 1_11zon.pdf | 16 Oct 2025 |
| Form 2A (FY 2024-2025)File: FORM 2A AETHEREUS PHASE 1.pdf | 24 Jun 2025 |
| Form 1File: FORM 1 AETHEREUS PHASE 1 31032025.pdf | 22 May 2025 |
| Form 2File: Form 2 Aethereus Phase 1.pdf | 22 May 2025 |
| Form 3File: FORM 3 AETHEREUS PHASE 1 30032025.pdf | 22 May 2025 |
| Disclosure of Sold and Booked InventoryFile: AETHEREUS PH1 31032025.pdf | 22 May 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 AETHEREUS PHASE 1 30032025.pdf | 19 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Aethereus Phase 1.pdf | 19 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 AETHEREUS PHASE 1 31032025.pdf | 12 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: AETHEREUS PH1 31032025.pdf | 4 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 AETHEREUS PHASE 1 31122024.pdf | 20 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 AETHEREUS PHASE 1 31122024.pdf | 20 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 AETHEREUS PHASE 1 31122024.pdf | 20 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: AETHEREUS PHASE 1 31122024.pdf | 8 Jan 2025 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: MMH R-10 Completion Certificate (2).pdf | 4 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 AETHEREUS PH 1 31032023.pdf | 6 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 AEHEREUS PH 1 30092024.pdf | 22 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 AETHEREUS PHASE 1 30092024.pdf | 22 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 AETHEREUS PHASE 1 30092024.pdf | 22 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 AETHEREUS PHASE 1 30092024.pdf | 19 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 AETHEREUS PHASE 1 30092024.pdf | 19 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: ATHEREUS PH1 30092024.pdf | 14 Oct 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5 AETHEREUS PHASE 1.pdf | 9 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 AETHEREUS PHASE 1 JUNE 2024.pdf | 2 Aug 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 AETHEREUS PHASE 1 30062024.pdf | 27 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 02 30062024 VTP Aethereus Phase 01.pdf | 22 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 VTP Aethereus Phase 1 Jun 24.pdf | 20 Jul 2024 |
| Disclosure of sold/ booked inventoryFile: VTP Aethereus P 1 30062024.pdf | 6 Jul 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A AETHEREUS PHASE 1 31032024.pdf | 16 May 2024 |
| Disclosure of sold/ booked inventoryFile: INVENTORY AETHEREUS PHASE 1 31032024.pdf | 6 May 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 AETHEREUS PHASE 1 31032024.pdf | 30 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 AETHEREUS PHASE 1 31032024.pdf | 27 Apr 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 AETHEREUS PHASE 1 31032024.pdf | 27 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 AETHEREUS PHASE 1 30092022.pdf | 4 Apr 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 AETHEREUS PHASE 1 31032022.pdf | 28 Mar 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 AETHEREUS PHASE 1 30062022.pdf | 28 Mar 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 AETHEREUS PHASE 1 31122022.pdf | 28 Mar 2024 |
| Disclosure of sold/ booked inventoryFile: INVENTORY AETHEREUS PHASE 1 31122023.pdf | 8 Mar 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 AETHEREUS PHASE 1 31122023.pdf | 5 Feb 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Aethereus Phase 1 31122023.pdf | 22 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 AETHEREUS PHASE 1 31122023.pdf | 22 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: VTP Aethereus_Form 2_Ph 1_30092023.pdf | 28 Oct 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 AETHEREUS PHASE 1 30092023.pdf | 28 Oct 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 AETHEREUS PHASE 1 30092023.pdf | 19 Oct 2023 |
| Disclosure of sold/ booked inventoryFile: FORM 1 AETHEREUS PHASE 1 30092023.pdf | 19 Oct 2023 |
| Disclosure of sold/ booked inventoryFile: INVENTORY AETHEREUS PHASE 1 30092023.pdf | 19 Oct 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5 AETHEREUS PHASE 1 2022-23.pdf | 29 Sep 2023 |
| Disclosure of sold/ booked inventoryFile: AETHEREUS PHASE 1 30092022.pdf | 30 Aug 2023 |
| Disclosure of sold/ booked inventoryFile: AETHEREUS PHASE 1 31122022.pdf | 30 Aug 2023 |
| Disclosure of sold/ booked inventoryFile: AETHEREUS PHASE 1 30062023.pdf | 30 Aug 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2A AETHEREUS PHASE 1 31032023.pdf | 29 Aug 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: VTP Aethereus Phase 1.pdf | 25 Aug 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 AETHEREUS PH 1 30062023_compressed.pdf | 24 Jul 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 AETH PH 1 30062023.pdf | 24 Jul 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 AETH PH 1_compressed.pdf | 24 Jul 2023 |
| Disclosure of sold/ booked inventoryFile: AETHEREUS PHASE 1.pdf | 12 Jun 2023 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 6 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 2 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 120 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep VTP Aethereus- Phase1 on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Mhalunge13,700+ in Pune
Filed coordinates, straight-line distance. 65 registered projects within 2 km.
EARTH 1 BY VTP LUXE PHASE 1
MAHALUNGE REAL ESTATE DEVELOPERS PVT. LTD.
Godrej Meadows
Mahalunge Township Developers Private Limi
Godrej Green Vistas
Mahalunge Township Developers Private Limi
Godrej Hill Retreat
Mahalunge Township Developers Private Limi
Godrej Green Cove
Mahalunge Township Developers Private Limi
NYATI EMERALD I
NYATI BUILDERS PRIVATE LIMITED
Builder: HOME RISING CONSTRUCTION LLP
HOME RISING CONSTRUCTION LLP has 3 registrations on MahaRERA, including VTP Aethereus- Phase1 and VTP Aethereus phase2. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What does it mean that VTP Aethereus- Phase1 shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if VTP Aethereus- Phase1 is delayed beyond 30 Jun 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of VTP Aethereus- Phase1?
The registered promoter entity is HOME RISING CONSTRUCTION LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in VTP Aethereus- Phase1?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against VTP Aethereus- Phase1?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for VTP Aethereus- Phase1?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at VTP Aethereus- Phase1?
The professionals named in the filing: Architect: ANA CONSORTIUM PVT LTD; Architect: VK Architects; Engineer: Harshal Deshmukh; Engineer: Bhupendra Kanade; Engineer: SHITAL KADAM; Chartered Accountant: SPAK & CO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in VTP Aethereus- Phase1?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback