Registration lapsed No litigation declared Residential / Group Housing project

Godrej Anandam

By Godrej Properties Limited

RG-MH-01160 · RERA P50500004427 · Last updated on MahaRERA portal: 27 Jan 2022

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 26 months past the filed date

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Nagpur registration emailed to you, free during the pilot beta.
Aug 2024Possession promised26 months past this date
10 of 11Construction stages donefurthest along: Podiums (if any), 0%
0Complaints at MahaRERAon this registration
Jump to the 68 documents Report an error

Godrej Anandam is a Residential / Group Housing project by Godrej Properties Limited in Nagpur, Maharashtra, registered with MahaRERA as P50500004427 on 9 Aug 2017. Possession was promised by 29 Aug 2024 and is now 26 months past that date.

At a glance

Project

  • NameGodrej Anandam
  • TypeResidential / Group Housing
  • Location
    • Nagpur (M Corp.)
    • Nagpur (Urban)
    • Nagpur
    • 440018
  • Pincode440018
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P50500004427
  • ReraGenie IDRG-MH-01160

Builder

  • NameGodrej Properties Limited
  • Entity typeCompany
  • Other registrations27 more →
  • Completed5 of 28
  • No longer live1 lapsed, de-registered or revoked
  • Declared earlier projects35 →

Key dates

26 months past promisethis monthRegisteredAug 2017PromisedAug 2024

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on9 Aug 2017
  • Promised completion29 Aug 2024
  • Revised completionNone
  • Buildings1 building record
  • Documents filed68 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Tower F 18 19NA210000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 27 Jan 2022, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

10 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.

Tower F 18 19: 91% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 27 Jan 2022, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed1

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots1
Closed/Covered1

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area781 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
Goldbricks Infrastructure Private LimitedNagpur (M Corp.)Nagpur

Approvals and building plan

Permissible FSI1125.15
Proposed, not sanctioned963 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchNanik Wadia Building, Motwani Marg, Fort, Mumbai 400023

Certifying professionals and partners2

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectRajinder Kumar Associates
EngineerGVG Consulting Engineers
PartnerRole in project
Godrej Properties Limited-

Litigation declared2

CaseCourtStatus
6841/2016High Court NagpurStay Granted
25/2016City Survey Office Nagpurfinal order passed appeal allowed matter closed

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 28 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 28 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 28 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 28 Jul 2017Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 27 Jan 2022

Documents filed68

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Occupancy Certificate Tower F 18th 19th Floor.pdf27 Jan 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Q2 Arch FY 2022.pdf19 Oct 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Q2 Engg FY 2022.pdf19 Oct 2021
Certificates of CA (Form 3)File: Q1 CA FY 2022.pdf11 Aug 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate Q1 FY 2021-22 (1).pdf29 Jul 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Q1 Architect Certificate FY 2021-22.pdf21 Jul 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Q1 Arch FY 2019.pdf21 Jul 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Q2 Arch FY 2019.pdf21 Jul 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Q3 Arch FY 2019.pdf21 Jul 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Q4 Arch FY 2019.pdf21 Jul 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Q1 Arch FY 2020.pdf21 Jul 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Q2 Arch FY 2020.pdf21 Jul 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Q3 Arch FY 2020.pdf21 Jul 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Q1 Engg FY 2019.pdf21 Jul 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Q2 Engg FY 2019.pdf21 Jul 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Q3 Engg FY 2019.pdf21 Jul 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Q4 Engg FY 2019.pdf21 Jul 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Q1 Engg FY 2020.pdf21 Jul 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Q2 Engg FY 2020.pdf21 Jul 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Q3 Engg FY 2020.pdf21 Jul 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Q4 Engg FY 2020.pdf21 Jul 2021
Certificates of CA (Form 3)File: Q1 CA FY 2019.pdf21 Jul 2021
Certificates of CA (Form 3)File: Q2 CA FY 2019.pdf21 Jul 2021
Certificates of CA (Form 3)File: Q3 CA FY 2019.pdf21 Jul 2021
Certificates of CA (Form 3)File: Q4 CA FY 2019.pdf21 Jul 2021
Certificates of CA (Form 3)File: Q1 CA FY 2020.pdf21 Jul 2021
Certificates of CA (Form 3)File: Q2 CA FY 2020.pdf21 Jul 2021
Certificates of CA (Form 3)File: Q3 CA FY 2020.pdf21 Jul 2021
Certificates of CA (Form 3)File: Q4 CA FY 2020.pdf21 Jul 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Q1 Architect Certificate FY 2021-22.pdf19 Jul 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate Q1 FY 2021-22.pdf16 Jul 2021
Disclosure of sold/ booked inventoryFile: Sold-Unsold Inventory.pdf1 Jul 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: RERA Architect Q4 FY 2020-21.pdf30 Jun 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect RERA Q3 FY 21.pdf30 Jun 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Q1 Architect Certificate FY 2020.pdf30 Jun 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Q2 Architect Certificate FY 2020.pdf30 Jun 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate Q4 FY 2020-21.pdf30 Jun 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Q1 Engineer Certificate FY 2020.pdf30 Jun 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Q2 Engineer Certificate FY 2020.pdf30 Jun 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Q3 Engineer Certificate FY 2020.pdf30 Jun 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Q4 Engineer Certificate FY 2020.pdf30 Jun 2021
Certificates of CA (Form 3)File: CA Certificate Q4 FY 2020-21.pdf30 Jun 2021
Certificates of CA (Form 3)File: RERA CA Certificate Q1 FY 2020.pdf30 Jun 2021
Certificates of CA (Form 3)File: RERA CA Certificate Q2 FY 2020.pdf30 Jun 2021
Certificates of CA (Form 3)File: RERA CA Certificate Q3 FY 2020.pdf30 Jun 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Engineer Certificate Q4 FY 2020-21.pdf28 Jun 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 - 2019-20.pdf30 Sep 2020
Certificates of CA (Form 5)File: Godrej Anandam Form 5.pdf1 Oct 2019
Status of Formation of Legal Entity (Society/Co Op etc.)File: Tower F.pdf23 Oct 2018
Certificates of CA (Form 5)File: Godrej Anandam - Form 5.pdf30 Sep 2018
Proforma of Allotment letterFile: AFS - Anandam.pdf9 Feb 2018
Layout approvalFile: Sanctioned Layout.pdf28 Jul 2017
Building plan approvalFile: 18th Floor Plan.pdf28 Jul 2017
Building plan approvalFile: 19th Floor Plan.pdf28 Jul 2017
PAN CardFile: GPL PAN CARD.PDF28 Jul 2017
Copy of the legal title reportFile: Title Search Report (1).pdf28 Jul 2017
Details of encumbrancesFile: Encumbrance Certificate.PDF28 Jul 2017
Copy of Layout Approval (in case of layout)File: Sanctioned Layout.pdf28 Jul 2017
Building Plan Approval (IOD)File: 18th Floor Plan.pdf28 Jul 2017
Building Plan Approval (IOD)File: 19th Floor Plan.pdf28 Jul 2017
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate 2 FSI.PDF28 Jul 2017
Declaration in FORM BFile: Form B GIPL Co-Promoter F.PDF28 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate.pdf28 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer's Certificate (1).pdf28 Jul 2017
Certificates of CA (Form 3)File: CA Cetificate.pdf28 Jul 2017
Proforma of Allotment letterFile: AFS - Anandam TowerF- RERA (GPL).pdf28 Jul 2017
Proforma of Allotment letterFile: Allotment Letter Anandam RERA (GPL) 23 07 17.pdf28 Jul 2017
Proforma of Allotment letterFile: Application Form Anandam RERA (GPL) 23 07 17.pdf28 Jul 2017

How this compares with Nagpur

13%of Nagpur projects moved their completion datethis one has not
22%of Nagpur registrations have lapsed or been cancelledthis one is among them

Computed across the 2,800+ Nagpur projects on ReraGenie, from their own filings.

Free monthly report: Nagpur on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Godrej Anandam on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Nagpur (M Corp.)2,800+ in Nagpur

2 kmGodrej AnandamCompleted 37Lapsed / revoked 15Other 46Dot size: filed unitsN

Filed coordinates, straight-line distance. 98 registered projects within 2 km.

Builder: Godrej Properties Limited

Godrej Properties Limited has 28 registrations on MahaRERA, including The Trees, Residential Phase 1 and Godrej Anandam. Its filings disclose 35 earlier MahaRERA projects: declares 28 of 30 past projects completed on time. Litigation is declared on 7 of its registrations. Read the full track record. See more projects on the Nagpur district page.

Frequently asked questions

What does it mean that Godrej Anandam shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if Godrej Anandam is delayed beyond 29 Aug 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Godrej Anandam?

The registered promoter entity is Godrej Properties Limited, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Godrej Anandam?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Godrej Anandam?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Godrej Anandam?

The professionals named in the filing: Architect: Rajinder Kumar Associates; Engineer: GVG Consulting Engineers. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Godrej Anandam?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Godrej Anandam. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Godrej Anandam to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.