ReraGenieLog inGet a buyer report

Home / Browse projects / Raigarh, Maharashtra / GLOBE FANTASIAA- CELESTIA

Registered No litigation declared Residential / Group Housing project

GLOBE FANTASIAA- CELESTIA

By GLOBE INDIA INFRA

RG-MH-06204 · RERA P52000052366 · Last updated on MahaRERA portal: 27 Mar 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 2 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedno revision filed
5 of 11Construction stages donefurthest along: Internal walls, 95%
15 of 46Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 78 documents Report an error

GLOBE FANTASIAA- CELESTIA is a Residential / Group Housing project by GLOBE INDIA INFRA in Raigarh, Maharashtra, registered with MahaRERA as P52000052366 on 21 Aug 2023. Possession is promised by 31 Dec 2026. 31 of the 46 units on this registration are recorded sold or booked, and 5 of 11 construction stages are filed complete.

At a glance

Project

  • NameGLOBE FANTASIAA- CELESTIA
  • TypeResidential / Group Housing
  • Location
    • KASHELI ROAD
    • NERAL
    • Borle
    • Karjat
    • Raigarh
    • 410101
  • Pincode410101
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52000052366
  • ReraGenie IDRG-MH-06204

Builder

  • NameGLOBE INDIA INFRA
  • Entity typePartnership
  • Partnersrajesh anantrao thakare, MADHAV JAGMOHAN SINGH, ASHOKE RAMESHLAL MANKANI, SHAKTI BALKISHAN SINGH, GAUTAM GOVIND SINGH, AMAN MADHAV SINGH, AMEETT ASHOKE MANKANI, JIYA SATISH MANKANI, KALPANA DILIP BHAMARE, KISHANBIHARI SATYANARAYAN KAGZI, SHWETA RAJA MANKANI
  • Other registrations2 more →
  • Declared earlier projects2 →

Key dates

this monthRegisteredAug 2023PromisedDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on21 Aug 2023
  • Promised completion31 Dec 2026
  • Revised completionNone
  • Buildings1 building record
  • Documents filed78 files

Current status

67%31 of 46 units booked
89.2%Work done, per cost certificate

Figures as on 27 Mar 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
globe fantasiaa - celestiaNA8046046

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 27 Mar 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

5 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 95%.

globe fantasiaa - celestia: 63% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises95%
Sanitary Fittings within the flats / premises95%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 27 Mar 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes75%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes75%
Street LightingYes40%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed66

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots66
Open Space66

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,188 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on22 Nov 2025

Approvals and building plan

Sanctioning authorityCollector Raigad, Alibaug
Permissible FSI3291.53
Proposed, not sanctioned3,292 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSONAL BUSINESS PARK, SHOP NO 15,16,17 PLOT NO RI 137, NEAR GHARDA CIRCLE MIDC DOMBIVALI EAST 421203
Estimated costRs 6.00 cr
Cost incurredRs 5.35 cr
Work done89.17%
BuildingWingEstimatedIncurred
globe fantasiaa - celestiaNARs 5.00 crRs 4.75 cr
-NARs 1.00 crRs 60.00 lakh

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectKASHELKAR DESIGNS PRIVATE LIMITED
ArchitectKASHELKAR DESIGNS PRIVATE LTD
EngineerRAJESH THAKARE & ASSOCIATES
Chartered AccountantANKUR SANGOI & ASSOCIATES
Chartered AccountantNIKITA VISHAL LAPSHIA
PartnerRole in project
GLOBE INDIA INFRA-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 4 Jul 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 28 Jun 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 28 Jun 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 28 Jun 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed78

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: (Form 1)_Globe India Infra_Architects Certificate_Dec 2025.pdf27 Mar 2026
Withdrawal Update Form 2File: (Form 2)_Engineers Certificate - Globe India Infra - Celestia -Dec 2025.pdf27 Mar 2026
Withdrawal Update Form 3File: Form 3_Globe Fanstasia Celestia Dec 2025_Final.pdf27 Mar 2026
Form 5 (FY 2024-2025)File: Glone India Infra Form 5_FY 2024-25_Celestia_Sign Stamp.pdf5 Mar 2026
Withdrawal Update Form 1File: Form 1.pdf23 Feb 2026
Withdrawal Update Form 1File: (Form 1)_Globe Fantasiaa_Celestia_Sep 2025.pdf23 Feb 2026
Withdrawal Update Form 2File: Form 2.pdf23 Feb 2026
Withdrawal Update Form 2File: (Form 2)_Globe Fantasiaa_Celestia_Sep 2025.pdf23 Feb 2026
Withdrawal Update Form 3File: Form 3.pdf23 Feb 2026
Withdrawal Update Form 3File: Form 3.pdf23 Feb 2026
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 11 Architect’s Certificate of Percentage of Completion of Work (Form 1).pdf1 May 2025
Disclosure of sold/ booked inventoryFile: 6 Disclosure of sold booked inventory.pdf1 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 31-03-2025 Engineers certificate CELESTIA globe india infra.pdf23 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Signed Form 3 Celestia.pdf17 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 30 SEPT 24celestia.pdf22 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 CELESTIA SEPT 2024.pdf22 Oct 2024
Disclosure of sold/ booked inventoryFile: Globe Fantasiaa Celestiaa Inventory 30-09-2024.pdf22 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 celestia 16jUNE 2023 FOR REGN.pdf9 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Celestia 30 Sept 2023.pdf9 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Celestia For Dec 2023.pdf9 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Celestia March 2024.pdf9 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Celestia 15 july 2024.pdf9 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Globe Celestia Form 3 Signed and Scaned.pdf9 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Celestia 30 sept 2023.pdf9 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Celestia 31 dec 2023.pdf9 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2A Celestia March 2024.pdf9 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Celestia 30 june 2024.pdf9 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A Celestia March 2024.pdf9 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 Globe Fantasica Celestia FY 2023-24 (1).pdf9 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Globe Fantasiaa Celestia Form 2A 31MARCH 2024.pdf9 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Celestia Arch certificate 25 JAN 2024.pdf6 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Celestia Arch certificate 15 JULY 2024.pdf6 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Globe India Infra cELESTIA fORM 2 30 JUNE2024.pdf6 Aug 2024
Disclosure of sold/ booked inventoryFile: globe Fantasiaa celestia Inventory 30 9 2023.pdf6 Aug 2024
Disclosure of sold/ booked inventoryFile: Globe Fantasiaa Celestia inventory 31 12 2023.pdf6 Aug 2024
Disclosure of sold/ booked inventoryFile: CELESTIA 31ST MARCH 2024.pdf24 Jul 2024
Disclosure of sold/ booked inventoryFile: Globe Fantasiaa CELESTIA INVENTORY 30JUNE2024.pdf24 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Signed.pdf5 Jun 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A.pdf5 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: CELESTIA fORM 1 MARCH 2024.pdf24 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: globe India infra cELESTIA FORM 2 MARCH 2024.pdf24 May 2024
Declaration about Commencement CertificateFile: Declaration about Commencement Certificate.pdf21 Jul 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Aman Singh_Annexure A.pdf21 Jul 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Ameett Mankani_Annexure A.pdf21 Jul 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Jiya Mankani_Annexure A.pdf21 Jul 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Kalpana Bhamare_Annexure A.pdf21 Jul 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Shweta Mankani_Annexure A.pdf21 Jul 2023
Proforma of Allotment letterFile: ALLOTMENT LETTER GLOBE FANTASIAA- CELESTIA 47-5.pdf21 Jul 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Final Signed Form 3.pdf5 Jul 2023
Copy of the legal title reportFile: GLOBE INDIA INFRA GLOBE FANTASIAA - CELESTIA 47-5 SEARCH REPORT_compressed (2).pdf4 Jul 2023
CERSAI detailsFile: cersai report.pdf4 Jul 2023
CERSAI detailsFile: Globe Fantasiaa - Celestia Undertaking cum Declaration letter.pdf4 Jul 2023
Deviation Report with respect to Allotment letterFile: Celestia -No Deviation respect to allotment letter (1).pdf4 Jul 2023
Deviation Report with respect to model copy of AgreementFile: -Celestia Declaration Celestia -No Deviation with respect to sale agreement (1).pdf4 Jul 2023
Copy of the legal title reportFile: Title Certificate Borle 47-5.pdf1 Jul 2023
Proforma of Agreement for saleFile: agreement for sale- GLOBE FANTASIAA - CELESTIA.pdf1 Jul 2023
Layout approvalFile: Plan Approval Plot no 47-5 Globe Fantacia-Celestia.pdf28 Jun 2023
Building plan approvalFile: Plan Approval Plot no 47-5 Globe Fantacia-Celestia.pdf28 Jun 2023
PAN CardFile: Globe India Infra pan card.pdf28 Jun 2023
Details of encumbrances concerned to FinanceFile: GLOBE FANTASIAA CELESTIA Encumbrance regarding Finance .pdf28 Jun 2023
Details of encumbrances concerned to FinanceFile: Globe Fantasiaa- Celestia encumbrance to legal.pdf28 Jun 2023
Details of encumbrances concerned to LegalFile: GLOBE FANTASIAA CELESTIA Encumbrance regarding Finance .pdf28 Jun 2023
Details of encumbrances concerned to LegalFile: Globe Fantasiaa- Celestia encumbrance to legal.pdf28 Jun 2023
Copy of Layout Approval (in case of layout)File: Plan Approval Plot no 47-5 Globe Fantacia-Celestia.pdf28 Jun 2023
Building Plan Approval / NA Order for plotted developmentFile: Plan Approval Plot no 47-5 Globe Fantacia-Celestia.pdf28 Jun 2023
Commencement Certificates / NA Order for plotted developmentFile: FANTACIA - CELESTIA 47-5 CC CERTIFICATE.pdf28 Jun 2023
Declaration in FORM BFile: Globe India Infra Form B CELESTIA 47-5 .pdf28 Jun 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: GLOBE FANTASIAA - CELESTIA ARCHITECT CERTIFICATE.pdf28 Jun 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Celestia 47-5 Engineer certificate final.pdf28 Jun 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A_Ashoke Mankani.pdf28 Jun 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A_Gautam Singh.pdf28 Jun 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A_K B Kagzi.pdf28 Jun 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A_Karan Singh.pdf28 Jun 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A_Madhav Singh.pdf28 Jun 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A_Neha Barmecha.pdf28 Jun 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A_Rajesh Thakare.pdf28 Jun 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A_Shakti Singh.pdf28 Jun 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Globe Fantasiaa - Celestia - FORMAT A BANK.pdf28 Jun 2023

How this compares with Raigarh

67%of this project is bookeddistrict median 29%
20%of Raigarh projects moved their completion datethis one has not
26%of Raigarh registrations have lapsed or been cancelledthis one is on the register

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep GLOBE FANTASIAA- CELESTIA on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near NERAL5,900+ in Raigarh

2 kmGLOBE FANTASIAA- CELESTICompleted 59Lapsed / revoked 30Other 39Dot size: filed unitsN

Filed coordinates, straight-line distance. 128 registered projects within 2 km.

Builder: GLOBE INDIA INFRA

GLOBE INDIA INFRA has 3 registrations on MahaRERA, including GLOBE FANTASIAA- CELESTIA and GLOBE FANTASIAA - MOONSTONE. Its filings disclose 2 earlier MahaRERA projects, none completed yet. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What are my rights if GLOBE FANTASIAA- CELESTIA is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of GLOBE FANTASIAA- CELESTIA?

The registered promoter entity is GLOBE INDIA INFRA, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in GLOBE FANTASIAA- CELESTIA?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for GLOBE FANTASIAA- CELESTIA?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at GLOBE FANTASIAA- CELESTIA?

The professionals named in the filing: Architect: KASHELKAR DESIGNS PRIVATE LIMITED; Architect: KASHELKAR DESIGNS PRIVATE LTD; Engineer: RAJESH THAKARE & ASSOCIATES; Chartered Accountant: ANKUR SANGOI & ASSOCIATES; Chartered Accountant: NIKITA VISHAL LAPSHIA. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in GLOBE FANTASIAA- CELESTIA?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About GLOBE FANTASIAA- CELESTIA. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save GLOBE FANTASIAA- CELESTIA to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.