Home / Browse projects / Mumbai Suburban, Maharashtra / GHANWAT ACCORD

Registered Litigation declared Others project

GHANWAT ACCORD

By GHANWAT DEVELOPERS PVT. LTD

RG-MH-17994 · RERA P51800066476 · Last updated on MahaRERA portal: 14 May 2026

Source: official MahaRERA filing

Red flags

  • Litigation declared, 1 case
  • Rs 18.00 crore secured on the land, in favour of State Bank of India

Clear

  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedno revision filed
3 of 11Construction stages donefurthest along: Slabs of Super Structure, 80%
49 of 68Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 67 documents Report an error

GHANWAT ACCORD is a Others project by GHANWAT DEVELOPERS PVT. LTD in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800066476 on 11 Jun 2024. Possession is promised by 31 Dec 2027. 19 of the 68 units on this registration are recorded sold or booked, and 3 of 11 construction stages are filed complete.

At a glance

Project

  • NameGHANWAT ACCORD
  • TypeOthers
  • Location
    • KOKANi WADA VAISHAT PADA KURAR OF VILLAGE MALAD EAST
    • MALAD EAST
    • Malad
    • Borivali
    • Mumbai Suburban
    • 400097
  • Pincode400097
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800066476
  • ReraGenie IDRG-MH-17994

Builder

  • NameGHANWAT DEVELOPERS PVT. LTD
  • Entity typeCompany
  • DirectorNEELKANTH POPAT GHANWAT
  • DirectorMANISH VASANTLAL PATEL

Key dates

this monthRegisteredJun 2024PromisedDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on11 Jun 2024
  • Promised completion31 Dec 2027
  • Revised completionNone
  • Buildings1 building record
  • Documents filed67 files

Current status

28%19 of 68 units booked
66.2%Work done, per cost certificate

Figures as on 14 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
redevlopment buildingNA222061768

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 14 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

3 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 80%.

redevlopment building: 59% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure80%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises60%
Sanitary Fittings within the flats / premises50%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks50%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.50%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.55%

Progress on shared amenities15

As on 14 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes80%
Water conservation /Rain water harvestingYes40%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes60%
Electrical meter room, sub-station, receiving stationYes50%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed60

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots60
Closed/Covered60

Land and ownership1

MahaRERA does not publish landowner contact details. A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area900 sq m
Land owned byNot the promoter
Named landowners1
Encumbrance on the landDeclared present
Charge in favour ofState Bank of India
Secured amountRs 18.00 crore
Declared on14 Mar 2026
LandownerVillageDistrict
GHANWAT DEVELOPERS PVT LTDMaladMumbai Suburban

Approvals and building plan

Sanctioning authorityMCGM
Permissible FSI3883.22
Proposed, not sanctioned3,883 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSION TROMBAY ROAD,HOTEL BAHRI RESIDENCY,DIAMOND GARDEN,CHEMBUR,DISTMUMBAI
Estimated costRs 25.59 cr
Cost incurredRs 16.93 cr
Work done66.16%
BuildingWingEstimatedIncurred
redevlopment buildingNARs 24.62 crRs 16.93 cr
-NARs 96.79 lakh-

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSHRI JIGAR K NAGDA K NAGDA
EngineerKAMLESH S SHINDE S SHINDE
Engineersagar Bandu Bugade
Chartered AccountantJAIPRAKAASH N LAHOTI N LAHOTI
Chartered AccountantRUCHI VIVEK KABRA
Chartered AccountantASHISH V KEDIA
PartnerRole in project
GHANWAT DEVELOPERS PVT. LTD-

Litigation declared1

CaseCourtStatus
1099/2023IN THE BOMBAY CITY CIVIL COURTOngoing

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 24 May 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 20 Oct 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 20 Oct 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 19 Apr 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2027

Documents filed67

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: form 1.pdf14 May 2026
Withdrawal Update Form 2File: form 2.pdf14 May 2026
Withdrawal Update Form 3File: form 3.pdf14 May 2026
Withdrawal Update Form 1File: FORM 1 - Architect certificate.pdf24 Feb 2026
Withdrawal Update Form 2File: Form 2 Engineer Certificate.pdf24 Feb 2026
Withdrawal Update Form 3File: FORM 3 CA certificate as on.pdf24 Feb 2026
Layout approvalFile: PLANS (1).pdf20 Oct 2025
Building plan approvalFile: IOD.pdf20 Oct 2025
Building plan approvalFile: Concession Drawing_compressed.pdf18 Oct 2025
Building plan approvalFile: plan_compressed (1).pdf18 Oct 2025
Withdrawal Update Form 1File: FORM 1 - Architect certificate.pdf18 Oct 2025
Withdrawal Update Form 2File: Form 2 Engineer Certificate.pdf18 Oct 2025
Withdrawal Update Form 3File: Form 3_Q2 FY 25.pdf18 Oct 2025
Withdrawal Update Form 1File: FORM 1 ghnawat june 25.pdf16 Oct 2025
Withdrawal Update Form 2File: form 2 ghanwat acccord june 25.pdf16 Oct 2025
Withdrawal Update Form 3File: Form 3 CA certificate june 25.pdf16 Oct 2025
Form 5 (FY 2024-2025)File: Rera Form 5.pdf22 Sep 2025
Building plan approvalFile: 2025 amended IODcom.pdf23 Jul 2025
Building plan approvalFile: 2454797Amendletter_signed_Ghanwat.pdf23 Jul 2025
Form 1File: FORM 1 Architect certificate Q 4_210525.Pdf21 May 2025
Form 1File: FORM 1 Architect certificate Q 4_210525.Pdf21 May 2025
Form 2File: FORM 1 Architect certificate Q 4_210525.Pdf21 May 2025
Form 3File: Form 2 Engineer Certificate Q4_210525.pdf21 May 2025
Commencement Certificates / NA Order for plotted developmentFile: Ghanwat.pdf19 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 10062024.pdf6 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2 RERA Certificate050225.pdf6 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 3rd RERA Certificate050225.pdf6 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 4th RERA Certificate050225.pdf6 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 Architect certificate 30092024.pdf4 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 Architect certificate 3122024.pdf4 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM3Q1GDPLJUNE.pdf4 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM3Q2GDPLSEPTEMBER.pdf4 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM3Q3GDPLDECMBER.pdf4 Feb 2025
Building plan approvalFile: 30042024 IOD.pdf12 Aug 2024
Building Plan Approval / NA Order for plotted developmentFile: 30042024 IOD.pdf12 Aug 2024
Commencement Certificates / NA Order for plotted developmentFile: 2502024FurtherCCsigned.pdf12 Aug 2024
Deviation Report with respect to model copy of AgreementFile: Final devition Report of AFS 030624.pdf4 Jun 2024
Proforma of Agreement for saleFile: Agreement 2024_merged.pdf31 May 2024
Copy of the legal title reportFile: title ghanwat.pdf24 May 2024
Details of encumbrances concerned to FinanceFile: legal Encumbrances (1).pdf9 May 2024
Details of encumbrances concerned to LegalFile: legal Encumbrances (1).pdf9 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Self Declaration FSI ghanwat.pdf15 Apr 2024
Other - FinanceFile: Self Declaration FSI ghanwat.pdf15 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RERA revised Form3 signed.pdf12 Apr 2024
Other - TechnicalFile: Undertaking cum Declaration 110424.pdf12 Apr 2024
Building plan approvalFile: Change of Developers COD.pdf6 Apr 2024
Building Plan Approval / NA Order for plotted developmentFile: Change of Developers COD.pdf6 Apr 2024
Commencement Certificates / NA Order for plotted developmentFile: Change of Developers COD.pdf6 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 MALAD.pdf6 Apr 2024
CERSAI detailsFile: CERSAI_Search_Report_200303353541_For_Asset_Based_Search_06_04_2024_15_44_48_939.pdf6 Apr 2024
CERSAI detailsFile: Self declaration no debt on us Related to the said land.pdf6 Apr 2024
Proforma of Allotment letterFile: ALLOTMENT LETTER- draft.pdf6 Apr 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Declaration Bank Account Form A 300324.pdf6 Apr 2024
Layout approvalFile: Self Declaration No Layout Approval.pdf23 Mar 2024
Building plan approvalFile: IOD Amended Plan.pdf23 Mar 2024
PAN CardFile: GDPL Pan Card.pdf23 Mar 2024
Details of encumbrances concerned to FinanceFile: self Declaration No Financial Encumbrances.pdf23 Mar 2024
Details of encumbrances concerned to LegalFile: self Declaration No Financial Encumbrances.pdf23 Mar 2024
Copy of Layout Approval (in case of layout)File: Self Declaration No Layout Approval.pdf23 Mar 2024
Building Plan Approval / NA Order for plotted developmentFile: IOD Amended Plan.pdf23 Mar 2024
Commencement Certificates / NA Order for plotted developmentFile: _FurtherCC_2024 signed.pdf23 Mar 2024
Declaration about Commencement CertificateFile: Declaration about Commencemnt certificate format D.pdf23 Mar 2024
Declaration in FORM BFile: Form 'B' Affidavit Cum Declaration - NPG.pdf23 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 - Architect Rera Certificate.pdf23 Mar 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of intrest in other Real Estate Organization Annex A.pdf23 Mar 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of intrest in other Real Estate Organization Annex APMG.pdf23 Mar 2024
Deviation Report with respect to Allotment letterFile: Daviation Report with respect to model Copy of Allotment letter.pdf23 Mar 2024

How this compares with Mumbai Suburban

28%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep GHANWAT ACCORD on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near MALAD EAST6,700+ in Mumbai Suburban

2 kmGHANWAT ACCORDCompleted 69Lapsed / revoked 54Other 98Dot size: filed unitsN

Filed coordinates, straight-line distance. 221 registered projects within 2 km.

Builder: GHANWAT DEVELOPERS PVT. LTD

GHANWAT DEVELOPERS PVT. LTD has 1 registration on MahaRERA, including GHANWAT ACCORD. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if GHANWAT ACCORD is delayed beyond 31 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of GHANWAT ACCORD?

The registered promoter entity is GHANWAT DEVELOPERS PVT. LTD, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in GHANWAT ACCORD?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for GHANWAT ACCORD?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at GHANWAT ACCORD?

The professionals named in the filing: Architect: SHRI JIGAR K NAGDA K NAGDA; Engineer: KAMLESH S SHINDE S SHINDE; Engineer: sagar Bandu Bugade; Chartered Accountant: JAIPRAKAASH N LAHOTI N LAHOTI; Chartered Accountant: RUCHI VIVEK KABRA; Chartered Accountant: ASHISH V KEDIA. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in GHANWAT ACCORD?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About GHANWAT ACCORD. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save GHANWAT ACCORD to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.