ReraGenieLog inGet a buyer report

Home / Browse projects / Pune, Maharashtra / Geras World of Joy M

Registered Litigation declared Others project

Geras World of Joy M

By Gera Developments Private Limited

RG-MH-05011 · RERA P52100022744 · Last updated on MahaRERA portal: 20 Apr 2026

Source: official MahaRERA filing

Red flags

  • Litigation declared, 3 cases
  • 1 complaint at MahaRERA
  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedmoved 12 months from the original
39 of 55Construction stages doneacross 5 buildings; furthest along: External plumbing and external plaster, 100%
0 of 320Units unsoldnot recorded sold or booked
1Complaints at MahaRERAon this registration
Jump to the 169 documents Report an error

Geras World of Joy M is a Others project by Gera Developments Private Limited in Pune, Maharashtra, registered with MahaRERA as P52100022744 on 16 Oct 2019. Possession is promised by 30 Dec 2027. The completion date has moved by 12 months from the original filing. 320 of the 320 units on this registration are recorded sold or booked, and 39 of 55 construction stages are filed complete. 1 complaint is on record with the regulator.

At a glance

Project

  • NameGeras World of Joy M
  • TypeOthers
  • Location
    • 24m RP road
    • Upper Kharadi Pune
    • WAGHOLI
    • Haveli
    • Pune
    • 412207
  • Pincode412207
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100022744
  • ReraGenie IDRG-MH-05011

Builder

  • NameGera Developments Private Limited
  • Entity typeCompany
  • CINU70102PN1988PTC049303
  • GSTIN27AAACG6703F1ZW
  • CIN and GSTIN are from this promoter's other MahaRERA registrations. This project's own filing does not repeat them.
  • Managing DirectorRohit Gera
  • ChairpersonKumar Gera
  • Other registrations24 more →
  • Completed11 of 25
  • No longer live4 lapsed, de-registered or revoked
  • Declared earlier projects10 →

Key dates

this monthRegisteredOct 2019First promiseDec 2026Revised toDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on16 Oct 2019
  • Promised completion30 Dec 2027
  • Revised completionRevised to 30 Dec 2027 (originally 30 Dec 2026)
  • Buildings5 building records
  • Documents filed169 files

Current status

100%320 of 320 units booked
100.0%Work done, per cost certificate

Figures as on 20 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Tower HNA1815281442
Tower INA171484084
Tower JNA171456056
Tower KNA171482082
Tower LNA171456056

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building5

As on 20 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

39 of 55 construction stages are filed complete across 5 buildings. The stage furthest along is External plumbing and external plaster, at 100%.

Tower H100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Tower I100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Tower J100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Tower K81%
ActivityProgress
Excavation100%
Basement (if any)99%
Podiums (if any)0%
Plinth99%
Stilt Floor95%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Tower L81%
ActivityProgress
Excavation100%
Basement (if any)99%
Podiums (if any)0%
Plinth99%
Stilt Floor95%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 20 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsYes100%
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes100%
Open ParkingNoNot applicable

Parking filed471

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots471
Closed/Covered458
Open Space13
BuildingClosed/CoveredOpen SpaceTotal
Tower H68472
Tower I1405145
Tower J84488
Tower K1100110
Tower L56056

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area9,449 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on17 Jul 2025

Approvals and building plan

Sanctioning authorityPune Metropolitan Region Development Authority(PMRDA)
Permissible FSI35979.33
Proposed, not sanctioned35,979 sq m
Buildings approved5
Buildings sanctioned5

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchBund Guarden Road Pune
Estimated costRs 158.10 cr
Cost incurredRs 158.10 cr
Work done100.0%
BuildingWingEstimatedIncurred
Tower INARs 33.79 crRs 33.79 cr
Tower KNARs 31.71 crRs 31.71 cr
-NARs 31.62 crRs 31.62 cr
Tower JNARs 23.20 crRs 23.20 cr
Tower LNARs 20.11 crRs 20.11 cr
Tower HNARs 17.67 crRs 17.67 cr

Certifying professionals and partners7

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectGera Developments
ArchitectDeepesh Bhurat
EngineerSantosh Tiwatne
EngineerAshish Rajigare
Chartered AccountantDeepak A Shah
Chartered AccountantShah Khandelwal Jain & Associates
Chartered AccountantJain Doshi and Associates
PartnerRole in project
Gera Developments Private Limited-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100014020Dec 2026 → Dec 2027

Reason as filed by the promoterProject was registered in October 2019, however sales and construction of the project is not yet commenced due to market conditions. Now we are getting the said project launched and initiating the construction at site and will be opening the project for sale. Hence, we request you to grant us the extension from the date 30/12/2026 to 30/12/2027.

Litigation declared3

CaseCourtStatus
1504/2018Civil Court PuneClosed
1848/2019Civil Court PuneOngoing
154/2020DistrictClosed

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC005000000471260Gera Developments Private LimitedMrs. Divya Khandelwal15/07/2024

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 17 Mar 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 2 Dec 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 2 Dec 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 2 Dec 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Dec 2027

Documents filed169

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 169 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: WOJ-M-RERA CERTIFICATE.pdf20 Apr 2026
Withdrawal Update Form 2File: Engineer Certificate WOJ M 31032026.pdf20 Apr 2026
Withdrawal Update Form 3File: CA Certificate WOJ M 31032026.pdf20 Apr 2026
Withdrawal Update Form 1File: WOJ M Withdrawal Application Form1.pdf20 Jan 2026
Withdrawal Update Form 2File: Engineer Certificate- WOJ M.pdf20 Jan 2026
Withdrawal Update Form 3File: WOJ M.pdf20 Jan 2026
Withdrawal Update Form 1File: WOJ_RERA_CERTIFICATE_RERA-70.pdf20 Oct 2025
Withdrawal Update Form 2File: Engineers Certificate WOJ M.pdf20 Oct 2025
Withdrawal Update Form 3File: WOJ M (1)_11zon.pdf20 Oct 2025
Withdrawal Update Form 1File: ARCHITECT CERTIFICATES WOJ M 19082025.pdf15 Oct 2025
Withdrawal Update Form 2File: Engineer certificate WOJ M 30062024.pdf15 Oct 2025
Withdrawal Update Form 3File: CA Certificate WOJ M 19082025_11zon.pdf15 Oct 2025
Withdrawal Update Form 1File: ARCHITECT CERTIFICATES WOJ M 19082025.pdf14 Oct 2025
Withdrawal Update Form 2File: Engineer certificate WOJ M 30062024.pdf14 Oct 2025
Withdrawal Update Form 3File: CA Certificate WOJ M 19082025_11zon.pdf14 Oct 2025
Form 5 (FY 2024-2025)File: WOJ M FY 24 25.pdf25 Sep 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: WOJ M FORM 1.pdf17 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate WOJ M 31032025_11zon.pdf17 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: WOJ M ENGINEER CERTIFICATE 310320254.pdf17 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: WOJ M.pdf20 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: WOJ M.pdf20 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate WOJ M 31122024.pdf20 Jan 2025
Disclosure of sold/ booked inventoryFile: WOJ M.pdf20 Jan 2025
Home Buyer /Allottee Grievance Redressal CellFile: GRC.pdf7 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: WOJ M.pdf20 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Gera WOJ M 30092024.pdf20 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate WOJ M 30092024.pdf20 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: WOJ M_compressed.pdf9 Oct 2024
Disclosure of sold/ booked inventoryFile: WOJ M.pdf20 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: GERA World of Joy M april to June 2024.pdf19 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer certificate WOJ M 30062024.pdf19 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: WOJ M (2).pdf19 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: WOJ M.PDF29 Jun 2024
Proforma of Agreement for saleFile: V1-WOJ- M -29th March 2023 Final Version_.pdf6 May 2024
Proforma of Agreement for saleFile: V7 -WOJ- M -2nd May 2023 Version 7.pdf6 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: WOJ M.pdf20 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: WOJ M.pdf20 Apr 2024
Disclosure of sold/ booked inventoryFile: WOJ M.pdf20 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: WOJ M (2).pdf20 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: WOJ M RERA Certificate 31 01 2024.pdf20 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: WOJ M Engineer Certificate 31122023.pdf20 Jan 2024
Disclosure of sold/ booked inventoryFile: DIsc of Sold Unsold WOJ M Q3.pdf20 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: WOJ M 31122023_compressed.pdf20 Jan 2024
Layout approvalFile: Layout.pdf2 Dec 2023
Building plan approvalFile: H Tower Elevation.pdf2 Dec 2023
Building plan approvalFile: H Tower Floor Plan.pdf2 Dec 2023
Building plan approvalFile: H Tower Section Two.pdf2 Dec 2023
Building plan approvalFile: H Tower Section.pdf2 Dec 2023
Building plan approvalFile: I Tower Elevation.pdf2 Dec 2023
Building plan approvalFile: I Tower Floor Plan Tow.pdf2 Dec 2023
Building plan approvalFile: I Tower Floor Plan.pdf2 Dec 2023
Building plan approvalFile: I Tower Section.pdf2 Dec 2023
Building plan approvalFile: J K L Floor Plan.pdf2 Dec 2023
Building plan approvalFile: JKL Elevation.pdf2 Dec 2023
Building plan approvalFile: JKL FLoor Plan Three.pdf2 Dec 2023
Building plan approvalFile: JKL Floor Plan Two.pdf2 Dec 2023
Building plan approvalFile: JKL Section.pdf2 Dec 2023
Building plan approvalFile: Parking Plan Four.pdf2 Dec 2023
Building plan approvalFile: Parking Plan one.pdf2 Dec 2023
Building plan approvalFile: Parking Plan Three.pdf2 Dec 2023
Building plan approvalFile: Parking Plan Two.pdf2 Dec 2023
Copy of Layout Approval (in case of layout)File: Layout.pdf2 Dec 2023
Building Plan Approval / NA Order for plotted developmentFile: H Tower Elevation.pdf2 Dec 2023
Building Plan Approval / NA Order for plotted developmentFile: H Tower Floor Plan.pdf2 Dec 2023
Building Plan Approval / NA Order for plotted developmentFile: H Tower Section Two.pdf2 Dec 2023
Building Plan Approval / NA Order for plotted developmentFile: H Tower Section.pdf2 Dec 2023
Building Plan Approval / NA Order for plotted developmentFile: I Tower Elevation.pdf2 Dec 2023
Building Plan Approval / NA Order for plotted developmentFile: I Tower Floor Plan Tow.pdf2 Dec 2023
Building Plan Approval / NA Order for plotted developmentFile: I Tower Floor Plan.pdf2 Dec 2023
Building Plan Approval / NA Order for plotted developmentFile: I Tower Section.pdf2 Dec 2023
Building Plan Approval / NA Order for plotted developmentFile: J K L Floor Plan.pdf2 Dec 2023
Building Plan Approval / NA Order for plotted developmentFile: JKL Elevation.pdf2 Dec 2023
Building Plan Approval / NA Order for plotted developmentFile: JKL FLoor Plan Three.pdf2 Dec 2023
Building Plan Approval / NA Order for plotted developmentFile: JKL Floor Plan Two.pdf2 Dec 2023
Building Plan Approval / NA Order for plotted developmentFile: JKL Section.pdf2 Dec 2023
Building Plan Approval / NA Order for plotted developmentFile: Parking Plan Four.pdf2 Dec 2023
Building Plan Approval / NA Order for plotted developmentFile: Parking Plan one.pdf2 Dec 2023
Building Plan Approval / NA Order for plotted developmentFile: Parking Plan Three.pdf2 Dec 2023
Building Plan Approval / NA Order for plotted developmentFile: Parking Plan Two.pdf2 Dec 2023
Commencement Certificates / NA Order for plotted developmentFile: Commencement certificate 21-09-2023_compressed.pdf2 Dec 2023

Promoter's earlier projects5

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

4 delivered on promise1 delivered late
ProjectLocationFlatsStatusPromisedDelivered
Geras Imperium GreenChalta no 13 part of PT Sheet no 73Plot no AX neogi nagar Rua de Ourem road61CompletedApr 2019May 2016
Geras Greenville Song of Joy A1 and A2Survey no 64 Hissa no 1 to 6 Kharadi120CompletedApr 2017Oct 2016
Geras Greenville Trinity TowerSurvey no 64 Hissa no 1 to 6248CompletedNov 2015Oct 2015
Regent TowerSurvey No 33 Hissa No 2 2 Village Baner9CompletedNov 2014Sep 2014
Geras Park View ISurvey no 73 Hissa No 1227CompletedApr 2014Late, Mar 2015

How this compares with Pune

100%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one moved by 12 months
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Geras World of Joy M on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Upper Kharadi Pune13,700+ in Pune

2 kmGeras World of Joy MCompleted 8Lapsed / revoked 13Other 29Dot size: filed unitsN

Filed coordinates, straight-line distance. 50 registered projects within 2 km.

Builder: Gera Developments Private Limited

Gera Developments Private Limited has 25 registrations on MahaRERA, including A3, Song of Joy, Geras Greensville2 and Geras Misty Waters. Its filings disclose 10 earlier MahaRERA projects: declares 8 of 10 past projects completed on time. Litigation is declared on 5 of its registrations. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Geras World of Joy M is delayed beyond 30 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Geras World of Joy M?

The registered promoter entity is Gera Developments Private Limited, a company as per the filing. Its CIN U70102PN1988PTC049303 and GSTIN 27AAACG6703F1ZW can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Geras World of Joy M?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Geras World of Joy M?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Geras World of Joy M?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Geras World of Joy M?

The professionals named in the filing: Architect: Gera Developments; Architect: Deepesh Bhurat; Engineer: Santosh Tiwatne; Engineer: Ashish Rajigare; Chartered Accountant: Deepak A Shah; Chartered Accountant: Shah Khandelwal Jain & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Geras World of Joy M?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Geras World of Joy M. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Geras World of Joy M to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.