Red flags

  • Litigation declared, 1 case
  • 20 complaints at MahaRERA

Clear

  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedno revision filed
6 of 33Construction stages doneacross 3 buildings; furthest along: Basement (if any), 80%
0 of 263Units unsoldnot recorded sold or booked
20Complaints at MahaRERAon this registration
Jump to the 158 documents Report an error

Geras Planet of Joy Project IV is a Residential / Group Housing project by Gera Developments Private Limited in Pune, Maharashtra, registered with MahaRERA as P52100031876 on 22 Nov 2021. Possession is promised by 31 Dec 2026. 263 of the 263 units on this registration are recorded sold or booked, and 6 of 33 construction stages are filed complete. 20 complaints are on record with the regulator.

At a glance

Project

  • NameGeras Planet of Joy Project IV
  • TypeResidential / Group Housing
  • Location
    • Wagholi
    • Haveli
    • Pune
    • 412207
  • Pincode412207
  • RERA no.P52100031876
  • ReraGenie IDRG-MH-22618

Builder

  • NameGera Developments Private Limited
  • Entity typeCompany
  • Managing DirectorRohit Gera
  • Other registrations24 more →
  • Completed11 of 25
  • No longer live4 lapsed, de-registered or revoked
  • Declared earlier projects10 →

Key dates

this monthRegisteredNov 2021PromisedDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on22 Nov 2021
  • Promised completion31 Dec 2026
  • Revised completionNone
  • Buildings3 building records
  • Documents filed158 files

Current status

100%263 of 263 units booked
98.1%Work done, per cost certificate

Figures as on 22 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Building GNA23181050105
Building F1NA211663063
Building F2NA211695095

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 22 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

6 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Basement (if any), at 80%.

Building G59%
ActivityProgress
Excavation100%
Basement (if any)80%
Podiums (if any)0%
Plinth80%
Stilt Floor80%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises65%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks42%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.48%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.59%
Building F160%
ActivityProgress
Excavation100%
Basement (if any)80%
Podiums (if any)0%
Plinth80%
Stilt Floor80%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises64%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks46%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.48%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.59%
Building F259%
ActivityProgress
Excavation100%
Basement (if any)80%
Podiums (if any)0%
Plinth80%
Stilt Floor80%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises64%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks46%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.48%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.46%

Progress on shared amenities15

As on 22 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes20%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes90%
Storm Water DrainsYes30%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes70%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes25%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes30%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed265

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots265
Closed/Covered265
BuildingClosed/CoveredTotal
Building G107107
Building F16363
Building F29595

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area2,993 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on20 Apr 2026

Approvals and building plan

Sanctioning authorityPune Metropolitan Region Development Authority (PMRDA)
Permissible FSI26183.1
Proposed, not sanctioned24,348 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchBund Gardem road
Estimated costRs 93.55 cr
Cost incurredRs 91.80 cr
Work done98.13%
BuildingWingEstimatedIncurred
Building GNARs 27.73 crRs 27.38 cr
Building F1NARs 25.11 crRs 24.80 cr
Building F2NARs 25.11 crRs 24.80 cr
-NARs 15.59 crRs 14.81 cr

Certifying professionals and partners7

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectPrajakta Pujari
ArchitectDeepesh Bhurat
EngineerSantosh Tiwatne
EngineerAshish Rajigare
Chartered AccountantDeepak K Shah
Chartered AccountantShah Khandelwal Jain & Associates
Chartered AccountantJain Doshi and Associates
PartnerRole in project
Gera Developments Private Limited-

Litigation declared1

CaseCourtStatus
1282/2022CivilOngoing

Complaints filed with MahaRERA20

Case no.ComplainantRespondentFiled
CC005000000269618Gera Developments Private LimitedMr. Prem Prakash Singh25/10/2023
CC005000000279748Gera Developments Private LimitedMr. Ganesh Uttamrao Dhamdhere22/11/2023
CC005000000290065Grandwell Properties And Leasing Private LimitedMr. Vijaykumar Somnath Padanure09/01/2024
CC12501326Gera Developments Private LimitedPrabhajan Sahoo22/04/2025
CC12501327Gera Developments Private LimitedUmesh Kewal Krishan Sahani22/04/2025
CC12603145Shubham Rajkumar KhandelwalGera Developments Private Limited27/05/2026
CC12602683Koushlendra Singh PARIHARGera Developments Private Limited08/05/2026
CC12602871Ravindra Sambhaji ShendgeGera Developments Private Limited16/05/2026
CC12602906Syeed Shadab AhmadGera Developments Private Limited17/05/2026
CC12602927Karishma Harshal SarodeGera Developments Private Limited18/05/2026
CC12603102Nitin JainGera Developments Private Limited25/05/2026
CC12603148Anand GauravGera Developments Private Limited27/05/2026
CC12603258Himanshu KumarGera Developments Private Limited30/05/2026
CC12603268Rohit Atmaram ParalikarGera Developments Private Limited31/05/2026
CC12603274Mary peter jayapaulGera Developments Private Limited31/05/2026
CC12603351Niraj Rajendrakumar GangwalGera Developments Private Limited01/06/2026
CC12603424Bharti ChichaniGera Developments Private Limited04/06/2026
CC12603453Ashu GuptaGera Developments Private Limited05/06/2026
CC12603579Pranit KenjaleGera Developments Private Limited10/06/2026
CC12603580Pranit KenjaleGera Developments Private Limited10/06/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 17 Nov 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 4 Jul 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 4 Jul 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 4 Jul 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed158

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 158 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: POJ Q1 FORM 1.pdf22 Jun 2026
Withdrawal Update Form 1File: POJ IV Q2 FORM 1.pdf22 Jun 2026
Withdrawal Update Form 1File: POJ_RERA CERTIFICATE_IV.pdf22 Jun 2026
Withdrawal Update Form 1File: POJ-IV-RERA CERTIFICATE.pdf22 Jun 2026
Withdrawal Update Form 2File: POJ IV 30062025 FORM 2.pdf22 Jun 2026
Withdrawal Update Form 2File: Engineers Certificate POJ IV.pdf22 Jun 2026
Withdrawal Update Form 2File: Engineer Certificate- POJ IV.pdf22 Jun 2026
Withdrawal Update Form 2File: Engineer Certificate POJ IV 31032026.pdf22 Jun 2026
Withdrawal Update Form 3File: CA Certificate POJ IV 30062025_compressed.pdf22 Jun 2026
Withdrawal Update Form 3File: POJ IV_compressed.pdf22 Jun 2026
Withdrawal Update Form 3File: CA Certificate- POJ IV 31122025_compressed.pdf22 Jun 2026
Withdrawal Update Form 3File: CA Certificate POJ IV 31032026.pdf22 Jun 2026
Form 5 (FY 2024-2025)File: POJ IV FY24-25.pdf24 Sep 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: POJ IV March 2025.pdf19 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate POJ IV 31032025_11zon.pdf19 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: POJ IV ENGINEER CERTIFICATE 31032025.pdf19 Apr 2025
Disclosure of sold/ booked inventoryFile: POJ IV.pdf20 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: POJ IV 1.pdf19 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: POJ IV 3.pdf19 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate- POJ IV 31122024.pdf19 Jan 2025
Home Buyer /Allottee Grievance Redressal CellFile: GRC.pdf7 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: POJ IV.pdf20 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Gera POJ 4 30092024.pdf20 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate POJ 4 30092024.pdf20 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: POJ IV_compressed.pdf9 Oct 2024
Disclosure of sold/ booked inventoryFile: POJ IV.pdf20 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: POJ IV.pdf19 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer certificate POJ IV 30062024.pdf19 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: POJ IV (2).pdf19 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: POJ IV_11zon.pdf29 Jun 2024
Proforma of Agreement for saleFile: POJ 4 Production (V5) 040424.pdf26 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: POJ IV.pdf20 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: POJ IV.pdf20 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: POJ IV (2).pdf20 Apr 2024
Proforma of Agreement for saleFile: POJ-IV Agreement -V3-10-Aug-22.pdf4 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: POJ IV.pdf20 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: POJ IV Engineer Certificate 31122023.pdf20 Jan 2024
Disclosure of sold/ booked inventoryFile: DIsc of Sold Unsold POJ IV.pdf20 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: POJ IV 31122023_compressed.pdf20 Jan 2024
Disclosure of sold/ booked inventoryFile: POJ IV Q2.pdf20 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form-5 Notes_POJ-IV.pdf11 Sep 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate POJ 4 15072023.pdf9 Aug 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA POJ 4 Certificate 15072023_compressed.pdf9 Aug 2023
Disclosure of sold/ booked inventoryFile: Disc Sold Booked POJ IV.pdf11 Jul 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA POJ 4 Certificate 10022023.pdf10 Jul 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: FORMAT A POJ IV.pdf10 Jul 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA POJ 4 Certificate 10022023.pdf6 Jul 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: IV.pdf30 Jun 2023
Disclosure of sold/ booked inventoryFile: POJ IV Disc Sold Booked Q4.pdf14 Apr 2023
Disclosure of sold/ booked inventoryFile: POJ IV Disc SoldUnsold Q3 FY 2022-23.pdf16 Jan 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: POJ 4 Architect certificate 20122022.pdf3 Jan 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate POJ 4 20122022.pdf3 Jan 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA POJ 4 Certificate 20122022.pdf3 Jan 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: GetUserDocumentFileContent.pdf23 Dec 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: POJ 4 Architect certificate 16112022.pdf5 Dec 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate POJ 4 16112022.pdf5 Dec 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA POJ 4 Certificate 16112022.pdf5 Dec 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: POJ 4 Architect certificate 15102022.pdf31 Oct 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate POJ 4 15102022.pdf31 Oct 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA POJ 4 Certificate 15102022_compressed.pdf31 Oct 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: POJ 4 Architect certificate 07092022.pdf17 Oct 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate POJ 4 07092022.pdf17 Oct 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA POJ 4 Certificate 07092022_compressed.pdf17 Oct 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FORM 5 Notes_POJ-IV_Signed.pdf17 Oct 2022
Disclosure of sold/ booked inventoryFile: Inv-POJ IV_compressed.pdf11 Oct 2022
Disclosure of sold/ booked inventoryFile: Inv-POJ IV_compressed.pdf11 Oct 2022
CERSAI detailsFile: CERSAI_Search_Report_POJ IV- F1, F2 G_compressed.pdf8 Oct 2022
CERSAI detailsFile: CERSAI_Search_Report_POJ IV- F1, F2 G_compressed.pdf7 Oct 2022
Other - FinanceFile: FORM 5 Notes_POJ-IV_Signed.pdf27 Sep 2022
Declaration about Commencement CertificateFile: CC Dec-poj IV.pdf7 Jul 2022
Building plan approvalFile: 20-47 Building F1 F2 Floor Plans Elevation and Sections .pdf4 Jul 2022
Building plan approvalFile: 21-47 Building G Floor Plans Area Calculations.pdf4 Jul 2022
Building plan approvalFile: 22-47 Building G Floor Plans Area Calculations.pdf4 Jul 2022
Building plan approvalFile: 23-47 Building G Floor Plans Area Calculations.pdf4 Jul 2022
Building plan approvalFile: 24-47 Building G Floor Plans Area Calculations.pdf4 Jul 2022
Building plan approvalFile: 25-47 Building G Floor Plans Area Calculations.pdf4 Jul 2022
Building plan approvalFile: 25-47 Building G Floor Plans Area Calculations.pdf4 Jul 2022
Layout approvalFile: 1-POJ-Layout.pdf4 Jul 2022
Building plan approvalFile: 17-47 Building F1 F2 Floor Plans Floor Plans Area Calculations .pdf4 Jul 2022
Building plan approvalFile: 18-F-floor plan.pdf4 Jul 2022

Promoter's earlier projects6

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

5 delivered on promise1 delivered late
ProjectLocationFlatsStatusPromisedDelivered
Geras Imperium GreenChalta No 13 Part of PT Sheet No 73 Plot No A X Neogi nagar Rua de Ourem Road Panji Goa61CompletedApr 2019May 2015
Geras Greenville Song of Joy A1 A2Survey No 64 Hissa No 1 to 6120CompletedApr 2017Oct 2016
A1 A2 Song of Joy Geras GreenvilleS No 64 Hissa No 1to 6 Kharadi Pune 14120CompletedApr 2017Oct 2016
Geras Greensville Trinity TowersSurvey No 64 Hissa No 1 to 6 Kharadi Pune 411 014248CompletedNov 2015Oct 2015
Geras Regent TowerSurvey No 33 Hissa No 2 2 Village Baner Pune9CompletedNov 2014Sep 2014
Geras Parkview ISurvey No 73 Hissa No 1 Kharadi Pune 411014227CompletedApr 2014Late, Mar 2015

How this compares with Pune

100%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Geras Planet of Joy Project IV on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Wagholi13,700+ in Pune

Builder: Gera Developments Private Limited

Gera Developments Private Limited has 25 registrations on MahaRERA, including A3, Song of Joy, Geras Greensville2 and Geras Misty Waters. Its filings disclose 10 earlier MahaRERA projects: declares 8 of 10 past projects completed on time. Litigation is declared on 5 of its registrations. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Geras Planet of Joy Project IV is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Geras Planet of Joy Project IV?

The registered promoter entity is Gera Developments Private Limited, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Geras Planet of Joy Project IV?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Geras Planet of Joy Project IV?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Geras Planet of Joy Project IV?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Geras Planet of Joy Project IV?

The professionals named in the filing: Architect: Prajakta Pujari; Architect: Deepesh Bhurat; Engineer: Santosh Tiwatne; Engineer: Ashish Rajigare; Chartered Accountant: Deepak K Shah; Chartered Accountant: Shah Khandelwal Jain & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Geras Planet of Joy Project IV?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Geras Planet of Joy Project IV. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Geras Planet of Joy Project IV to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.