Registration lapsed Litigation declared Residential / Group Housing project

Geras Planet of Joy Project I

By Gera Developments Private Limited

RG-MH-22512 · RERA P52100031802 · Last updated on MahaRERA portal: 24 Sep 2025

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 10 months past the filed date
  • Litigation declared, 1 case

Clear

  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2025Possession promised10 months past this date
39 of 55Construction stages doneacross 5 buildings; furthest along: Installation of Lifts, 70%
0Complaints at MahaRERAon this registration
Jump to the 104 documents Report an error

Geras Planet of Joy Project I is a Residential / Group Housing project by Gera Developments Private Limited in Pune, Maharashtra, registered with MahaRERA as P52100031802 on 12 Nov 2021. Possession was promised by 31 Dec 2025 and is now 10 months past that date.

At a glance

Project

  • NameGeras Planet of Joy Project I
  • TypeResidential / Group Housing
  • Location
    • 24 mts RP road
    • Wagholi
    • Haveli
    • Pune
    • 412207
  • Pincode412207
  • RERA no.P52100031802
  • ReraGenie IDRG-MH-22512

Builder

  • NameGera Developments Private Limited
  • Entity typeCompany
  • Managing DirectorRohit Gera
  • Other registrations24 more →
  • Completed11 of 25
  • No longer live4 lapsed, de-registered or revoked
  • Declared earlier projects10 →

Key dates

10 months past promisethis monthRegisteredNov 2021PromisedDec 2025

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on12 Nov 2021
  • Promised completion31 Dec 2025
  • Revised completionNone
  • Buildings5 building records
  • Documents filed104 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Cluster ENA20000
Cluster ANA20000
Cluster BNA20000
Cluster CNA20000
Cluster DNA20000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building5

As on 24 Sep 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

39 of 55 construction stages are filed complete across 5 buildings. The stage furthest along is Installation of Lifts, at 70%.

Cluster E70%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.70%
Cluster A73%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Cluster B73%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Cluster C73%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Cluster D73%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 24 Sep 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes80%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes90%
Street LightingYes70%
Community BuildingsYes50%
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes80%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed46

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots46
Open Space46
BuildingOpen SpaceTotal
Cluster E1414
Cluster C1616
Cluster D1616

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area12,260 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authorityPune Metropolitan Region Development Authority (PMRDA)
Permissible FSI7656.05
Proposed, not sanctioned7,656 sq m
Buildings approved5
Buildings sanctioned5

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchBund Garden Road

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectPrajakta Pujari
ArchitectDeepesh Bhurat
EngineerSantosh Tiwatne
Chartered AccountantDeepak A Shah
Chartered AccountantDeepak Shah
Chartered AccountantShah Khandelwal Jain & Associates
PartnerRole in project
Gera Developments Private Limited-

Litigation declared1

CaseCourtStatus
1282/2022CivilOngoing

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 1 Nov 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 4 Jul 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 4 Jul 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 4 Jul 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 10 Feb 2025

Documents filed104

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 104 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 5 (FY 2024-2025)File: POJ I FY24-25.pdf24 Sep 2025
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: POJ OC LR.pdf10 Feb 2025
Disclosure of sold/ booked inventoryFile: POJ I.pdf20 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Poj i 1.pdf19 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: POJ I.pdf19 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Poj i 2.pdf19 Jan 2025
Home Buyer /Allottee Grievance Redressal CellFile: GRC.pdf7 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: POJ I.pdf20 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Gera POJ 1 30092024.pdf20 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate POJ 1 30092024.pdf20 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: POJ I_compressed.pdf9 Oct 2024
Disclosure of sold/ booked inventoryFile: POJ I.pdf20 Jul 2024
Disclosure of sold/ booked inventoryFile: POJ I.pdf20 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: POJ I.pdf19 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer certificate POJ I.pdf19 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: POJ I.pdf19 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: POJ I_11zon.pdf29 Jun 2024
Proforma of Agreement for saleFile: POJ 1 Production (V5) 040424.pdf26 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: POJ I.pdf20 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: POJ I.pdf20 Apr 2024
Disclosure of sold/ booked inventoryFile: POJ I.pdf20 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: POJ I.pdf20 Apr 2024
Proforma of Agreement for saleFile: POJ I AFS V3 Clean.pdf4 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: POJ I FORM 1.pdf20 Jan 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: POJ I Engineer Certificate 31122023.pdf18 Jan 2024
Disclosure of sold/ booked inventoryFile: DIsc of Sold Unsold POJ I.pdf18 Jan 2024
Disclosure of sold/ booked inventoryFile: POJ I Q2.pdf20 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form-5 Notes_POJ-I.pdf11 Sep 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate POJ 1 15072023.pdf9 Aug 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate POJ 1 15072023_compressed.pdf9 Aug 2023
Disclosure of sold/ booked inventoryFile: Disc Sold Booked POJ I.pdf11 Jul 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA POJ I 10022023.pdf10 Jul 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate POJ 1 05062023_compressed.pdf10 Jul 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: FORMAT A POJ I.pdf10 Jul 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate POJ 1 05062023_compressed.pdf6 Jul 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: File-1-2.pdf30 Jun 2023
Disclosure of sold/ booked inventoryFile: POJ I Disc Sold Booked Q4.pdf14 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: POJ 1 Architect certificate 10022023.pdf20 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate POJ 1 10022023.pdf20 Feb 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA POJ I 10022023.pdf20 Feb 2023
Disclosure of sold/ booked inventoryFile: POJ I Disc Soldunsold Q3 FY2022-23.pdf16 Jan 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: POJ 2A 21-22.pdf23 Dec 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: POJ 1 Architect certificate07092022.pdf17 Oct 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate POJ 1 07092022.pdf17 Oct 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA POJ 1 Certificate 07092022.pdf17 Oct 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FORM 5 Notes_POJ-I_Signed.pdf17 Oct 2022
Disclosure of sold/ booked inventoryFile: Inv-POJ I_compressed.pdf11 Oct 2022
CERSAI detailsFile: CERSAI_Search_Report_POJ I Clusters _compressed.pdf8 Oct 2022
CERSAI detailsFile: CERSAI_Search_Report_POJ I Clusters .pdf7 Oct 2022
Other - FinanceFile: FORM 5 Notes_POJ-I_Signed.pdf27 Sep 2022
Declaration about Commencement CertificateFile: CC Dec- POJ I.pdf7 Jul 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate POJ 1 251221.pdf7 Jul 2022
Disclosure of sold/ booked inventoryFile: Inv-POJ I_compressed.pdf7 Jul 2022
Layout approvalFile: 1-POJ-Layout.pdf4 Jul 2022
Building plan approvalFile: 37-47 3BHK Cluster Villa A Floor Plans Area Calculations .pdf4 Jul 2022
Building plan approvalFile: 38-47 3BHK Cluster Villa B Floor PlansElevation Section .pdf4 Jul 2022
Building plan approvalFile: 39-47 2BHK Cluster Villa C Floor Plans Area Calculations .pdf4 Jul 2022
Building plan approvalFile: 40-47 2BHK Cluster Villa D Floor Plans, Area Calculation,Section and Elevation ,.pdf4 Jul 2022
Building plan approvalFile: 41-47 2BHK Cluster Villa E Floor Plans, Area Calculation .pdf4 Jul 2022
Details of encumbrances concerned to LegalFile: Self Declaration Encumbrance Letter_POJ (Wagholi).pdf4 Jul 2022
Copy of Layout Approval (in case of layout)File: 1-POJ-Layout.pdf4 Jul 2022
Building Plan Approval / NA Order for plotted developmentFile: 37-47 3BHK Cluster Villa A Floor Plans Area Calculations .pdf4 Jul 2022
Building Plan Approval / NA Order for plotted developmentFile: 38-47 3BHK Cluster Villa B Floor PlansElevation Section .pdf4 Jul 2022
Building Plan Approval / NA Order for plotted developmentFile: 39-47 2BHK Cluster Villa C Floor Plans Area Calculations .pdf4 Jul 2022
Building Plan Approval / NA Order for plotted developmentFile: 40-47 2BHK Cluster Villa D Floor Plans, Area Calculation,Section and Elevation ,.pdf4 Jul 2022
Building Plan Approval / NA Order for plotted developmentFile: 41-47 2BHK Cluster Villa E Floor Plans, Area Calculation .pdf4 Jul 2022
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate dated 03-June-2022.pdf4 Jul 2022
CERSAI detailsFile: CERSAI Declaration - POJ (Asset Based).pdf4 Jul 2022
Status of Formation of Legal Entity (Society/Co Op etc.)File: POJ Project I Certificate.pdf4 Jul 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: QC-POJ I_merged.pdf15 Apr 2022
CERSAI detailsFile: CERSAI_Search_Report_POJ I Clusters .pdf7 Apr 2022
Disclosure of sold/ booked inventoryFile: Inv- POJ I.pdf7 Apr 2022
CERSAI detailsFile: CERSAI_Search_Report_POJ I Clusters .pdf7 Apr 2022
Disclosure of sold/ booked inventoryFile: Inv- POJ I.pdf7 Apr 2022
Status of Formation of Legal Entity (Society/Co Op etc.)File: Society POJ I_compressed.pdf7 Apr 2022
Proforma of Allotment letterFile: POJ- I Agreement- 28-02-22.pdf16 Mar 2022
CERSAI detailsFile: CERSAI Declaration - POJ.pdf31 Jan 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate POJ 1 25122021_compressed.pdf19 Jan 2022
Disclosure of sold/ booked inventoryFile: POj I_compressed.pdf17 Jan 2022
Proforma of Allotment letterFile: POJ- I Agreement- 04-01-22.pdf13 Jan 2022

Promoter's earlier projects6

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

5 delivered on promise1 delivered late
ProjectLocationFlatsStatusPromisedDelivered
Geras Imperium GreenChalta No 13 Part of PT Sheet No 73 Plot No A X Neogi nagar Rua de Ourem Road Panji Goa61CompletedApr 2019May 2015
Geras Greenville Song of Joy A1 A2Survey No 64 Hissa No 1 to 6120CompletedApr 2017Oct 2016
A1 A2 Song of Joy Geras GreenvilleS No 64 Hissa No 1to 6 Kharadi Pune 14120CompletedApr 2017Oct 2016
Geras Greensville Trinity TowersSurvey No 64 Hissa No 1 to 6 Kharadi Pune 411 014248CompletedNov 2015Oct 2015
Geras Regent TowerSurvey No 33 Hissa No 2 2 Village Baner Pune9CompletedNov 2014Sep 2014
Geras Parkview ISurvey No 73 Hissa No 1 Kharadi Pune 411014227CompletedApr 2014Late, Mar 2015

How this compares with Pune

26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is among them

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Geras Planet of Joy Project I on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Wagholi13,700+ in Pune

Builder: Gera Developments Private Limited

Gera Developments Private Limited has 25 registrations on MahaRERA, including A3, Song of Joy, Geras Greensville2 and Geras Misty Waters. Its filings disclose 10 earlier MahaRERA projects: declares 8 of 10 past projects completed on time. Litigation is declared on 5 of its registrations. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What does it mean that Geras Planet of Joy Project I shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if Geras Planet of Joy Project I is delayed beyond 31 Dec 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Geras Planet of Joy Project I?

The registered promoter entity is Gera Developments Private Limited, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Geras Planet of Joy Project I?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Geras Planet of Joy Project I?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Geras Planet of Joy Project I?

The professionals named in the filing: Architect: Prajakta Pujari; Architect: Deepesh Bhurat; Engineer: Santosh Tiwatne; Chartered Accountant: Deepak A Shah; Chartered Accountant: Deepak Shah; Chartered Accountant: Shah Khandelwal Jain & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Geras Planet of Joy Project I?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Geras Planet of Joy Project I. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Geras Planet of Joy Project I to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.