ReraGenieLog inGet a buyer report

Home / Browse projects / Pune, Maharashtra / Geras Misty Waters

Registration lapsed No litigation declared Residential / Group Housing project

Geras Misty Waters

By Gera Developments Private Limited

RG-MH-08576 · RERA P52100001176 · Last updated on MahaRERA portal: 24 Apr 2025

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 40 months past the filed date
  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Jun 2023Possession promised40 months past this date
8 of 11Construction stages donefurthest along: Basement (if any), 0%
0Complaints at MahaRERAon this registration
Jump to the 121 documents Report an error

Geras Misty Waters is a Residential / Group Housing project by Gera Developments Private Limited in Pune, Maharashtra, registered with MahaRERA as P52100001176 on 27 Jul 2017. Possession was promised by 14 Jun 2023 and is now 40 months past that date. The completion date has moved by 12 months from the original filing.

At a glance

Project

  • NameGeras Misty Waters
  • TypeResidential / Group Housing
  • Location
    • Mundwa
    • Keshavnagar-Mundwa
    • Pune City
    • Pune
    • 411036
  • Pincode411036
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100001176
  • ReraGenie IDRG-MH-08576

Builder

  • NameGera Developments Private Limited
  • Entity typeCompany
  • Managing DirectorRohit Gera
  • Other registrations24 more →
  • Completed11 of 25
  • No longer live4 lapsed, de-registered or revoked
  • Declared earlier projects10 →

Key dates

40 months past promisethis monthRegisteredJul 2017First promiseJun 2022Revised toJun 2023

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on27 Jul 2017
  • Promised completion14 Jun 2023
  • Revised completionRevised to 14 Jun 2023 (originally 14 Jun 2022)
  • Buildings1 building record
  • Documents filed121 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Geras Misty WatersNA120000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 24 Apr 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

8 of 11 construction stages are filed complete. The stage furthest along is Basement (if any), at 0%.

Geras Misty Waters: 73% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 24 Apr 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsYes100%
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes100%
Open ParkingYes100%

Parking filed118

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots118
Closed/Covered39
Open Space79

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area5,994 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
Shivlal Ambaji JadhavKeshavnagar-MundwaPune

Approvals and building plan

Permissible FSI7552.22
Proposed, not sanctioned7,552 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchBund Garden Road, Pune 411 001

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectGera Developments
EngineerSantosh Tiwatne
Chartered AccountantK Ray & Co
Chartered AccountantKhandelwal Jain & Associates
PartnerRole in project
Gera Developments Private Limited-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100011827Jun 2022 → Jun 2023

Reason as filed by the promoterWe would like you to please grant us extension for one year as the delay in grant of final occupancy certificate is beyond our control. The Project is completed in all respect and comprises of 118 number of units. Out of 118 units, occupancy certificate for 116 units have already been received. The balance two units are not sold, and the issuance of occupancy certificate has been kept in abeyance by PMC for the want of amenity space handover. The initial requirement of handing over the amenity space is the bifurcation of society, which was applied on 22nd July 2021 and the final order of socie

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 14 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 5 Oct 2021
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 5 Oct 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 5 Oct 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 17 May 2020

Documents filed121

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 121 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Disclosure of sold/ booked inventoryFile: MW Sold Unsold.pdf24 Apr 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Misty Waters.pdf19 Apr 2025
Certificates of CA (Form 3)File: CA Certificate Misty Water 31032025_11zon.pdf19 Apr 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: MISTY WATER ENGINEER CERTIFICATE 31032025.pdf19 Apr 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Misty Waters- RERA Certi- AOR .pdf20 Jan 2025
Certificates of CA (Form 3)File: MW.pdf20 Jan 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate Misty Water 31122024.pdf20 Jan 2025
Disclosure of sold/ booked inventoryFile: MW.pdf20 Jan 2025
Certificates of CA (Form 3)File: Gera Misty Waters 30092024.pdf20 Oct 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate Misty Water 30092024.pdf20 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Misty Water_compressed.pdf9 Oct 2024
Disclosure of sold/ booked inventoryFile: MW.pdf20 Jul 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: MW.pdf19 Jul 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer certificate Misty Water 30062024.pdf19 Jul 2024
Certificates of CA (Form 3)File: Mistry W.pdf19 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: MW19-20.pdf29 Jun 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: MW 20-21.pdf29 Jun 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: mw 21-22.pdf29 Jun 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: MW 22-23.pdf29 Jun 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Mw 23-24.pdf29 Jun 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Misty Water's.pdf20 Apr 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Misty Waters.pdf20 Apr 2024
Disclosure of sold/ booked inventoryFile: Misty Waters.pdf20 Apr 2024
Certificates of CA (Form 3)File: Misty Waters.pdf20 Apr 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Misty Water's -310122023.pdf20 Jan 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Misty Water Engineer Certificate 31122023.pdf20 Jan 2024
Disclosure of sold/ booked inventoryFile: DIsc of Sold Unsold Misty.pdf20 Jan 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 Misty Waters.pdf11 Sep 2023
Status of Formation of Legal Entity (Society/Co Op etc.)File: Gera's Misty Waters Registration Certificate[1].pdf7 Apr 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 Notes Misty Water_Signed.pdf17 Oct 2022
Disclosure of sold/ booked inventoryFile: Inv-Misty Waters_compressed.pdf11 Oct 2022
OtherFile: Form 5 Notes Misty Water_Signed.pdf28 Sep 2022
Certificates of CA (Form 5)File: Form 5 Notes Misty Water_Signed.pdf27 Sep 2022
Details of encumbrances concerned to LegalFile: Self Declaration Encumbrance Letter_Misty Water.pdf8 Jul 2022
Disclosure of sold/ booked inventoryFile: Inv-Misty_compressed.pdf8 Jul 2022
Details of encumbrancesFile: Self Declaration Encumbrance Letter_Misty Water.pdf12 May 2022
Declaration about Commencement CertificateFile: Mistywater-declaration.pdf12 May 2022
Disclosure of sold/ booked inventoryFile: Inventory-may-22.pdf12 May 2022
CERSAI detailsFile: CERSAI Report_GDPL Project Geras Misty Water.pdf12 May 2022
Disclosure of sold/ booked inventoryFile: Misty Waters_compressed.pdf17 Jan 2022
Disclosure of sold/ booked inventoryFile: Inventory- Misty Waters.pdf16 Nov 2021
Layout approvalFile: Binder1_Page_1 (1)_compressed.pdf5 Oct 2021
Building plan approvalFile: Binder1_Page_3_compressed.pdf5 Oct 2021
Building plan approvalFile: Binder1_Page_4_compressed.pdf5 Oct 2021
Building plan approvalFile: Binder1_Page_5_compressed.pdf5 Oct 2021
Building plan approvalFile: Binder1_Page_6_compressed.pdf5 Oct 2021
Building plan approvalFile: Binder1_Page_7_compressed.pdf5 Oct 2021
Building plan approvalFile: Binder1_Page_8_compressed.pdf5 Oct 2021
Building plan approvalFile: Binder1_Page_2_compressed (1).pdf5 Oct 2021
Copy of Layout Approval (in case of layout)File: Binder1_Page_1 (1)_compressed.pdf5 Oct 2021
Building Plan Approval (IOD)File: Binder1_Page_3_compressed.pdf5 Oct 2021
Building Plan Approval (IOD)File: Binder1_Page_4_compressed.pdf5 Oct 2021
Building Plan Approval (IOD)File: Binder1_Page_5_compressed.pdf5 Oct 2021
Building Plan Approval (IOD)File: Binder1_Page_6_compressed.pdf5 Oct 2021
Building Plan Approval (IOD)File: Binder1_Page_7_compressed.pdf5 Oct 2021
Building Plan Approval (IOD)File: Binder1_Page_8_compressed.pdf5 Oct 2021
Building Plan Approval (IOD)File: Binder1_Page_2_compressed (1).pdf5 Oct 2021
Commencement Certificates / NA Order for plotted developmentFile: SKMBT_C45421092908380_compressed.pdf5 Oct 2021
OtherFile: 1633407854136.pdf5 Oct 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5_GDPL_Misty Waters.pdf29 Sep 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Notes to Form 5_GDPL_Misty Waters.pdf29 Sep 2021
Disclosure of sold/ booked inventoryFile: Misty Inventory.pdf18 Aug 2021
Disclosure of sold/ booked inventoryFile: Misty Waters-Inventory.pdf1 Jun 2021
Declaration in FORM BFile: Form B- Misty Waters_compressed.pdf23 Nov 2020
Proforma of Allotment letterFile: MISTY WATERS Agreement- Post OC-Final 5B.pdf23 Nov 2020
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Misty waters-2019.pdf30 Sep 2020
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Misty-Audit-19-20.pdf30 Sep 2020
Details of Restarting of Construction work post lockdownFile: Misty.pdf20 Jun 2020
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: MW part OC 2.PDF17 May 2020
Status of Formation of Legal Entity (Society/Co Op etc.)File: Misty Society.pdf14 May 2020
Proforma of Allotment letterFile: MISTY WATERS Agreement- Ver5.pdf26 Nov 2019
Proforma of Allotment letterFile: MISTY WATERS Agreement- Post OC-17-Oct-19 (1).pdf26 Nov 2019
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Part OC- June-19.pdf26 Nov 2019
Certificates of CA (Form 5)File: Misty waters-2019.pdf30 Sep 2019
Details of encumbrancesFile: Encumbrance Misty Waters.pdf12 Jun 2019
Declaration in FORM BFile: Form B Misty_Compressed.pdf12 Jun 2019
Certificates of CA (Form 3)File: CA Gera's Misty Waters.pdf13 Feb 2019
Proforma of Allotment letterFile: MISTY WATERS Agreement- Ver4.pdf31 Oct 2018
Certificates of CA (Form 5)File: GDPL Misty waters.pdf30 Sep 2018
Commencement Certificates / NA Order for plotted developmentFile: GMW CC No 0428-Misty.PDF7 Jul 2018

Promoter's earlier projects6

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

5 delivered on promise1 delivered late
ProjectLocationFlatsStatusPromisedDelivered
Geras Imperium GreenChalta No 13 Part of PT Sheet No 73 Plot No A X Neogi nagar Rua de Ourem Road Panji Goa61CompletedApr 2019May 2015
Geras Greenville Song of Joy A1 A2Survey No 64 Hissa No 1 to 6120CompletedApr 2017Oct 2016
A1 A2 Song of Joy Geras GreenvilleS No 64 Hissa No 1to 6 Kharadi Pune 14120CompletedApr 2017Oct 2016
Geras Greensville Trinity TowersSurvey No 64 Hissa No 1 to 6 Kharadi Pune 411 014248CompletedNov 2015Oct 2015
Geras Regent TowerSurvey No 33 Hissa No 2 2 Village Baner Pune9CompletedNov 2014Sep 2014
Geras Parkview ISurvey No 73 Hissa No 1 Kharadi Pune 411014227CompletedApr 2014Late, Mar 2015

How this compares with Pune

26%of Pune projects moved their completion datethis one moved by 12 months
26%of Pune registrations have lapsed or been cancelledthis one is among them

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Geras Misty Waters on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Mundwa13,700+ in Pune

2 kmGeras Misty WatersCompleted 57Lapsed / revoked 13Other 46Dot size: filed unitsN

Filed coordinates, straight-line distance. 116 registered projects within 2 km.

Builder: Gera Developments Private Limited

Gera Developments Private Limited has 25 registrations on MahaRERA, including A3, Song of Joy, Geras Greensville2 and Geras Misty Waters. Its filings disclose 10 earlier MahaRERA projects: declares 8 of 10 past projects completed on time. Litigation is declared on 5 of its registrations. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What does it mean that Geras Misty Waters shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if Geras Misty Waters is delayed beyond 14 Jun 2023?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Geras Misty Waters?

The registered promoter entity is Gera Developments Private Limited, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Geras Misty Waters?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Geras Misty Waters?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Geras Misty Waters?

The professionals named in the filing: Architect: Gera Developments; Engineer: Santosh Tiwatne; Chartered Accountant: K Ray & Co; Chartered Accountant: Khandelwal Jain & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Geras Misty Waters?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Geras Misty Waters. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Geras Misty Waters to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.