Home / Browse projects / Mumbai Suburban, Maharashtra / Gaurav Discovery
Gaurav Discovery
RG-MH-08735 · RERA P51800007949 · Last updated on MahaRERA portal: 16 May 2024
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- 107 complaints at MahaRERA
Clear
- No litigation declared
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Gaurav Discovery is a Residential / Group Housing project by Vidhi Relators in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800007949 on 18 Aug 2017. Possession is promised by 30 Dec 2028. 107 complaints are on record with the regulator.
At a glance
Project
- NameGaurav Discovery
- TypeResidential / Group Housing
- Location
- Borivali
- Mumbai Suburban
- 400097
- Pincode400097
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51800007949
- ReraGenie IDRG-MH-08735
Builder
- NameVidhi Relators
- Entity typePartnership
- PartnerVijayKamal Properties Pvt Ltd VijayKamal Properties Pvt Ltd
- Declared earlier projects1 →
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on18 Aug 2017
- Promised completion30 Dec 2028
- Revised completionNone
- Buildings8 building records
- Documents filed47 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| A WING | NA | 24 | 0 | 0 | 0 | 0 |
| B WING | NA | 24 | 0 | 0 | 0 | 0 |
| C WING | NA | 24 | 0 | 0 | 0 | 0 |
| D WING | NA | 24 | 0 | 0 | 0 | 0 |
| E WING | NA | 24 | 0 | 0 | 0 | 0 |
| F WING | NA | 24 | 0 | 0 | 0 | 0 |
| G WING | NA | 24 | 0 | 0 | 0 | 0 |
| H WING | NA | 24 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building8
As on 16 May 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
25 of 88 construction stages are filed complete across 8 buildings. The stage furthest along is Slabs of Super Structure, at 77%.
A WING62%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 77% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 22% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 48% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 31% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
B WING63%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 77% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 30% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 48% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 39% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
C WING45%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
D WING51%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 32% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 4% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 23% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
E WING0%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
F WING47%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 14% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
G WING0%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
H WING0%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 16 May 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 20% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | No | Not applicable |
| Street Lighting | Yes | 0% |
| Community Buildings | Yes | 0% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed476
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Total |
|---|---|---|
| A WING | 82 | 82 |
| B WING | 81 | 81 |
| C WING | 61 | 61 |
| D WING | 82 | 82 |
| E WING | 82 | 82 |
| F WING | 86 | 86 |
| G WING | 1 | 1 |
| H WING | 1 | 1 |
Land and ownership1
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| Manish K Ajmera, Jiten K Ajmera | Mumbai City | Mumbai City |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners1
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | ELLORA PROJECT CONSULTANTS PVT LTD |
| Partner | Role in project |
|---|---|
| Vidhi Relators | - |
Complaints filed with MahaRERA107
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC006000000000240 | Nikhil | Jayesh Shah | 13/09/2017 |
| CC006000000054650 | Mr. Sainath Rajkumar Sarode and Mrs. Danielle Renwick Sousa | Vidhi Realtors | 26/05/2018 |
| CC006000000000398 | Gaurang Gheewala | Vidhi Realtors (Gaurav Discovery) | 11/09/2017 |
| CC006000000001064 | Gaurang Gheewala | Vidhi Realtors (Gaurav Discovery) | 05/10/2017 |
| CC006000000000522 | Anshumaan SainyaBhosle | Vidhi Realtors | 18/09/2017 |
| CC006000000000947 | Suresh Warier | Vidhi Relators | 07/10/2017 |
| CC006000000001397 | Rohan Sitaram Manohar | Vidhi Realtors | 05/11/2017 |
| CC006000000001861 | SHASHKANT ABNAVE/AARTI ABNAVE | VIDHI REALTORS | 15/11/2017 |
| CC006000000001707 | Haripal Nakai | M/s Vidhi Realtors | 06/11/2017 |
| CC006000000012797 | K K BHASKARAN NAIR | VIDHI REALTORS | 11/01/2018 |
| CC006000000022838 | K.ASHRAFUDDIN | VIDHI REALTORS | 11/01/2018 |
| CC006000000079323 | K ASHRAFUDDIN | VIDHI REALTORS | 17/05/2019 |
| CC006000000023886 | VASANT ROHIDAS LOTLIKAR | M/S VIDHI REALTORS / RAVI GROUP | 11/04/2018 |
| CC006000000262060 | Vasant Rohidas Lotlikar | M/S VIDHI REALTORS /RAVI GROUP | 24/07/2022 |
| CC006000000023566 | Asad Anwar Khatau | M/S Vidhi Realtors | 08/04/2018 |
| CC006000000023577 | Rahul Nadkarni | Vidhi Realtors | 03/03/2018 |
| CC006000000023909 | Veera Cardoza | M/s. Vidhi Realtors | 03/04/2018 |
| CC006000000044024 | ROGER DSILVA | VIDHI REALTORS | 08/04/2018 |
| CC006000000044123 | SUSHMA AGARWAL & RASHI AGARWAL | VIDHI REALTORS | 14/04/2018 |
| CC006000000044237 | Ratneshwar Jha | Vidhi Realtors | 25/04/2018 |
| CC006000000044333 | Sanjiv Srivastava and Poonam Srivastava | Vidhi Realtors | 29/04/2018 |
| CC006000000044393 | MR, Kaval Sethi and Mrs. Madhu Sethi | M/S Vidhi Realtors | 03/05/2018 |
| CC006000000055169 | Anjali Sanjay Panjwani and Sanjay Thakur Panjwani | Vidhi Realtors | 30/06/2018 |
| CC006000000055146 | SANJAY NARAIN TEKWANI | VIDHI REALTORS | 28/06/2018 |
| CC006000000055354 | ASHOK GOKAL GURNANI | VIDHI REALTORS | 12/07/2018 |
| CC006000000089682 | PRAJAKTA PARAG DABIR | M/S VIDHI REALTORS | 10/06/2019 |
| CC006000000055649 | Mrs. Sujata P Pujare & Mr. Prashant B. Pujare | Vidhi Realtors | 04/08/2018 |
| CC006000000055968 | Mrs. Chitra Seth | M/s. Vidhi Realtors | 30/08/2018 |
| CC006000000056826 | SHEKHAR K. MAHALAXMIKAR | VIDHI REALTORS | 12/11/2018 |
| CC006000000056711 | GAZALA ASIF DARVESH & ANAM ASIF DARVESH | Vidhi Realtors | 31/10/2018 |
| CC006000000056781 | MRS ANUJA GUPTA & MRS SEJAL A. PODAR | M/S VIDHI REALTORS | 01/11/2018 |
| CC006000000056795 | Mrs. Vibhuti Sanjaykumar Gupta & Mr. Sanjaykumar Pawan Gupta | M/s Vidhi Realtors | 01/11/2018 |
| CC006000000056836 | Manisha Manoj Savale And Manoj Ramdas Savale | Vidhi Realtors | 03/11/2018 |
| CC006000000056885 | Sahebrao S Jadhav and Malan S Jadhav | Vidhi Realtors | 11/11/2018 |
| CC006000000056886 | Sagar A Bhosle and Jayshree S Bhosle | Vidhi Realtors | 11/11/2018 |
| CC006000000057016 | HARIPAL NAKAI | M/S. VIDHI REALTORS | 22/11/2018 |
| CC006000000057025 | ARUNA SUBRATO BANERJEE | VIDHI REALTORS | 23/11/2018 |
| CC006000000057048 | RAJAN KUMAR | Vidhi Realtors | 26/11/2018 |
| CC006000000057177 | Lancelot Francis DSouza and Maria Rosy Celia DSouza | Vidhi Realtors | 10/12/2018 |
| CC006000000057459 | VALID MUSA BAGDADI | VIDHI REALTORS | 26/12/2018 |
| CC006000000058090 | Mukesh Gupta | Vidhi Realtors | 14/02/2019 |
| CC006000000058035 | Catherine Raphael | Vidhi Realtors | 14/02/2019 |
| CC006000000058109 | Savio Rodrigues/Fiona Rodrigues | Ketan T Shah | 16/02/2019 |
| CC006000000078256 | Irfan Ahmed Shaikh and Shaheen Begum Irfan Ahmed Shaikh | Vidhi Realtors | 25/02/2019 |
| CC006000000078439 | Mr Vilas S Chawan and Mrs Yasmin V Chawan | Vidhi Realtors | 12/03/2019 |
| CC006000000078565 | savio rodrigues | vidhi realtors | 24/03/2019 |
| CC006000000078612 | RIZWAN A R PATNI AND FAUZIYA PATNI | VIDHI REALTORS | 22/03/2019 |
| CC006000000078982 | ANSARI MOHAMMED ZAKI | VIDHI RELATORS | 20/04/2019 |
| CC006000000090156 | nisar ahmed malik | ravi group | 16/07/2019 |
| CC006000000100272 | MARY HARISH MHADALEKAR | VIDHI REALTORS OF RAVI GROUP | 24/07/2019 |
| CC006000000100453 | Diana Esperance Pinheiro | Vidhi Realtors | 09/08/2019 |
| CC006000000100488 | Meghana L Tolani and Laxman Tulsidas Tolani | Vidhi Realtors | 11/08/2019 |
| CC006000000100512 | Althea Hiren Shah | VIDHI REALTORS | 26/08/2019 |
| CC006000000100526 | Santosh Kisan Churmure and Tanvi Santosh Churmure | Vidhi Realtors | 14/08/2019 |
| CC006000000100576 | Bhavna Avinash Bodhare | Vidhi Realtors | 18/08/2019 |
| CC006000000110647 | Mr Arindam Bose & Mrs Rituparna Bose | Vidhi Realtors | 22/08/2019 |
| CC006000000110669 | Lyle Pereira and Lena Pereira | Vidhi Realtors | 23/08/2019 |
| CC006000000110726 | Sheetal Bedi and Ritu Bedi | Vidhi Realtors | 28/08/2019 |
| CC006000000110748 | Gilbert Bothelo and Larissa Misquitta | Vidhi Realtors | 29/08/2019 |
| CC006000000141114 | Mrs Vaishali D Redkar and mr damodar Redkar | Vidhi Realtors | 01/10/2019 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 29 Jun 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 29 Jun 2017 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 26 Jun 2017 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 26 Jun 2017Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 30 Dec 2028
Documents filed47
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)File: Gaurav Discovery Form 5 2017-18.pdf | 16 May 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Gaurav Discovery Form 5 2018-19.pdf | 16 May 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Gaurav Discovery Form 5 2019-20.pdf | 16 May 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Gaurav Discovery Form 5 2020-21.pdf | 16 May 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Gaurav Discovery Form 5 2021-22.pdf | 16 May 2024 |
| Certificates of CA (Form 3)File: Form 3 Gaurav Discovery 17-18.pdf | 9 May 2024 |
| Certificates of CA (Form 3)File: Form 3 Gaurav Discovery 18-19.pdf | 9 May 2024 |
| Certificates of CA (Form 3)File: Form 3 Gaurav Discovery 19-20.pdf | 9 May 2024 |
| Certificates of CA (Form 3)File: Form 3 Gaurav Discovery 20-21.pdf | 9 May 2024 |
| Certificates of CA (Form 3)File: Form 3 Gaurav Discovery 21-22.pdf | 9 May 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Gaurav Discovery wing A.pdf | 3 Mar 2018 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Gaurav Discovery wing A.pdf | 3 Mar 2018 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Gaurav Discovery wing B.pdf | 3 Mar 2018 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Gaurav Discovery wing C.pdf | 3 Mar 2018 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Gaurav Discovery wing D.pdf | 3 Mar 2018 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Gaurav Discovery wing F.pdf | 3 Mar 2018 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Gaurav discovery A wing.pdf | 3 Mar 2018 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Gaurav discovery B wing.pdf | 3 Mar 2018 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Gaurav discovery C wing.pdf | 3 Mar 2018 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Gaurav discovery F wing.pdf | 3 Mar 2018 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Gaurav discovery D wing.pdf | 3 Mar 2018 |
| OtherFile: Consent Term.pdf | 29 Sep 2017 |
| Certificates of CA (Form 3)File: CA Certificate for Discovery-min.pdf | 29 Jul 2017 |
| Proforma of Allotment letterFile: Gaurav Discovery Agreement.pdf | 29 Jul 2017 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Gaurav Discovery A.pdf | 28 Jul 2017 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Gaurav Discovery b.pdf | 28 Jul 2017 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Gaurav Discovery c.pdf | 28 Jul 2017 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Gaurav Discovery d.pdf | 28 Jul 2017 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Gaurav Discovery f.pdf | 28 Jul 2017 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: discovery a.pdf | 28 Jul 2017 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: discovery b.pdf | 28 Jul 2017 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: discovery c.pdf | 28 Jul 2017 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: discovery d.pdf | 28 Jul 2017 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: discovery f.pdf | 28 Jul 2017 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: rehab1.pdf | 28 Jul 2017 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: rehab2.pdf | 28 Jul 2017 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: rehab3.pdf | 28 Jul 2017 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: school.pdf | 28 Jul 2017 |
| Details of encumbrancesFile: Encumberance Discovery.pdf | 27 Jul 2017 |
| Declaration in FORM BFile: Form B- Discovery.pdf | 27 Jul 2017 |
| Layout approvalFile: Layout 2.pdf | 29 Jun 2017 |
| Copy of the legal title reportFile: Valuation Report-min new.pdf | 29 Jun 2017 |
| Copy of Layout Approval (in case of layout)File: Layout 2.pdf | 29 Jun 2017 |
| Building plan approvalFile: IOA for Building number 3.pdf | 26 Jun 2017 |
| PAN CardFile: Vidhi Pan.pdf | 26 Jun 2017 |
| Building Plan Approval (IOD)File: IOA for Building number 3.pdf | 26 Jun 2017 |
| Commencement Certificates / NA Order for plotted developmentFile: CC.pdf | 26 Jun 2017 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Mumbai Suburban
Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.
Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 1 condition on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 47 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
- A watch tells you the moment that changes, including if the registration lapses or a complaint is filed
- But on this project's record so far, expect it to be quiet. You can also save this project free and keep it on your shortlist
Keep Gaurav Discovery on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Borivali6,700+ in Mumbai Suburban
Filed coordinates, straight-line distance. 346 registered projects within 2 km.
Alta Monte and Signet
ERA REALTORS PRIVATE LIMITED
MAULI OMKAR
MAULI SAI DEVELOPERS PVT LTD
HIVE 97
AMITY CONSTRUCTIONS
MAULI PRIDE
MAULI SAI DEVELOPERS PVT LTD
Aarambh Phase III by group Satellite
Satellite Developers Private Limited
Sethia Imperial Avenue
Sai Enterprises
See every Mumbai Suburban project, with the district possession charts
Builder: Vidhi Relators
Vidhi Relators has 1 registration on MahaRERA, including Gaurav Discovery. Its filings disclose 1 earlier MahaRERA project, none completed yet. Read the full track record. See more projects on the Mumbai Suburban district page.
Frequently asked questions
What are my rights if Gaurav Discovery is delayed beyond 30 Dec 2028?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Gaurav Discovery?
The registered promoter entity is Vidhi Relators, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Gaurav Discovery?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against Gaurav Discovery?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for Gaurav Discovery?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Gaurav Discovery?
The professionals named in the filing: Architect: ELLORA PROJECT CONSULTANTS PVT LTD. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Gaurav Discovery?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback