Home / Browse projects / Mumbai Suburban, Maharashtra / Gaodevi Krupa Darshan SRA CHS Ltd
Gaodevi Krupa Darshan SRA CHS Ltd
RG-MH-09274 · RERA P51800003218 · Last updated on MahaRERA portal: 12 Aug 2026
Source: official MahaRERA filing
Red flags
- 3 complaints at MahaRERA
- Completion date moved by 24 months
- 2 extensions taken
Clear
- No litigation declared
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Gaodevi Krupa Darshan SRA CHS Ltd is a Residential / Group Housing project by Shivshankar Singh & Others in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800003218 on 5 Aug 2017. The registration is recorded completed; possession was promised by 31 Dec 2026. The completion date has moved by 24 months from the original filing. 161 of the 340 units on this registration are recorded sold or booked, and 18 of 22 construction stages are filed complete. 3 complaints are on record with the regulator.
At a glance
Project
- NameGaodevi Krupa Darshan SRA CHS Ltd
- TypeResidential / Group Housing
- Location
- SANMAN SINGH MARG
- BHANDUP (WEST)
- Kurla
- Mumbai Suburban
- 400078
- Pincode400078
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51800003218
- ReraGenie IDRG-MH-09274
Builder
- NameShivshankar Singh & Others
- Entity typeOthers
- GSTIN27AAAAS5080P1ZZ
- GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
- MembersShardadevi Shivram Singh Singh, Randhir Shivram Singh Singh, Sachin Shivram Singh Singh, Shivshankar Shivram Singh Singh
- Other registrations4 more →
- Completed1 of 5
- No longer live3 lapsed, de-registered or revoked
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on5 Aug 2017
- Promised completion31 Dec 2026
- Revised completionRevised to 31 Dec 2026 (originally 30 Dec 2024)
- Buildings2 building records
- Documents filed220 files
Current status
Figures as on 12 Aug 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Palladium | NA | 25 | 21 | 157 | 3 | 160 |
| Gaodevi Krupa Darshan SRA CHS Ltd | NA | 19 | 19 | 164 | 16 | 180 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building2
As on 12 Aug 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
18 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Podiums (if any), at 0%.
Palladium82%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Gaodevi Krupa Darshan SRA CHS Ltd82%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 12 Aug 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 100% |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | Yes | 0% |
Parking filed122
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Open Space | Total |
|---|---|---|---|
| Palladium | 87 | 0 | 87 |
| Gaodevi Krupa Darshan SRA CHS Ltd | 33 | 2 | 35 |
Land and ownership
Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| Palladium | NA | Rs 31.49 cr | Rs 31.49 cr |
| Gaodevi Krupa Darshan SRA CHS Ltd | NA | Rs 26.20 cr | Rs 26.20 cr |
| - | NA | Rs 5.54 cr | Rs 5.54 cr |
Certifying professionals and partners3
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Bhavsar Consultants |
| Engineer | SUDESH THUMBARE |
| Chartered Accountant | NEHAL MITUL FARIA |
| Partner | Role in project |
|---|---|
| Shivshankar Singh & Others | - |
Extensions applied for2
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterWe hereby seek an extension till 31-12-2025 for the completion of the project under Section 7(3) of the RERA Act, 2016, without the consent of the allottees. As per the sanctioned plan under the 1991 Development Control and Promotion Regulations (DCPR), we are required to surrender a road setback area measuring 23.80 meters wide within the proposed S.R. Scheme and hand it over to the Brihanmumbai Municipal Corporation (BMC). However, the department has now mandated compliance with the 2034 DCPR, requiring us to surrender a road area of 27.45 meters wide. This revision is practically unfeasible
Reason as filed by the promoterThe project commenced prior to the outbreak of the COVID-19 pandemic. However, from March 2020 to February 2022, construction activities were severely affected due to nationwide lockdowns, movement restrictions, and mandatory safety protocols. The pandemic caused widespread disruption in the availability of skilled and unskilled labour, as well as in the supply chain for construction materials and equipment. These constraints resulted in prolonged inactivity and slow progress on site. Despite these unprecedented conditions, continuous efforts were made to sustain limited operations and mitigat
Complaints filed with MahaRERA3
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC006000000429442 | ASHWINI ABHISHEK RAUT | SHIVSHANKAR SINGH AND OTHERS | 06/03/2024 |
| CC12500584 | Amrish Shivharsh Pandey | Shivshankar Singh & Others | 20/02/2025 |
| CC12500582 | punima Pandey | Shivshankar Singh & Others | 20/02/2025 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 27 Jul 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 28 Jul 2017 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 16 May 2025 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 14 Sep 2021Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 21 Apr 2025
Documents filed220
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 220 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Occupational CertificateFile: Part OC 09-05-2024.pdf | 12 Aug 2026 |
| Occupational CertificateFile: Full OC 16-06-2026.pdf | 12 Aug 2026 |
| Occupational CertificateFile: Layout Plan.pdf | 12 Aug 2026 |
| Occupational CertificateFile: 2.pdf | 12 Aug 2026 |
| Occupational CertificateFile: 3.pdf | 12 Aug 2026 |
| Occupational CertificateFile: 4.pdf | 12 Aug 2026 |
| Occupational CertificateFile: 5.pdf | 12 Aug 2026 |
| Occupational CertificateFile: 6.pdf | 12 Aug 2026 |
| Occupational CertificateFile: 7.pdf | 12 Aug 2026 |
| Occupational CertificateFile: 8.pdf | 12 Aug 2026 |
| Occupational CertificateFile: 9.pdf | 12 Aug 2026 |
| Occupational CertificateFile: 10.pdf | 12 Aug 2026 |
| Occupational CertificateFile: 11.pdf | 12 Aug 2026 |
| Occupational CertificateFile: 12.pdf | 12 Aug 2026 |
| Occupational CertificateFile: 13.pdf | 12 Aug 2026 |
| Form 2A (FY 2024-2025)File: Form 2A march 2025.pdf | 30 Jul 2026 |
| Form 2A (FY 2025-2026)File: Form 2A march 2026.pdf | 30 Jul 2026 |
| Withdrawal Update Form 1File: Form 1.pdf | 28 Jul 2026 |
| Withdrawal Update Form 2File: Form 2.pdf | 28 Jul 2026 |
| Withdrawal Update Form 3File: Form 3.pdf | 28 Jul 2026 |
| Withdrawal Update Form 1File: Architect Form 1.pdf | 5 May 2026 |
| Withdrawal Update Form 2File: Engineers certificate - Palladiaum.pdf | 5 May 2026 |
| Withdrawal Update Form 3File: PALLADIUM FORM 3.pdf | 5 May 2026 |
| Form 1File: Form 1 30-06-25.pdf | 4 Feb 2026 |
| Form 2File: Form 2 30-06-25.pdf | 4 Feb 2026 |
| Form 3File: Form 3 30-06-2025.pdf | 4 Feb 2026 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold 30-06-25.pdf | 4 Feb 2026 |
| Form 1File: Form 1 30-09-25.pdf | 3 Feb 2026 |
| Form 2File: Form 2 30-09-25.pdf | 3 Feb 2026 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold 30-09-25.pdf | 3 Feb 2026 |
| Form 3File: Form 3 30-09-25.pdf | 3 Feb 2026 |
| Form 1File: Form 1 31-12-25.pdf | 3 Feb 2026 |
| Form 2File: Form 2 31-12-25.pdf | 3 Feb 2026 |
| Form 3File: Form 3 31-12-25.pdf | 3 Feb 2026 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold 31-12-2025.pdf | 3 Feb 2026 |
| Form 1File: Form 1 Mar 24.pdf | 28 Jan 2026 |
| Form 2File: FORM 2 Mar 24.pdf | 28 Jan 2026 |
| Form 3File: Form 3 31-03-2024.pdf | 28 Jan 2026 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold Mar24.pdf | 28 Jan 2026 |
| Form 1File: Form 1 June 24.pdf | 28 Jan 2026 |
| Form 2File: FORM 2 Jun 24.pdf | 28 Jan 2026 |
| Form 3File: Form 3 30-06-2024.pdf | 28 Jan 2026 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold June 24.pdf | 28 Jan 2026 |
| Form 1File: Form 1 Sept 24.pdf | 28 Jan 2026 |
| Form 2File: FORM 2 Sep 24.pdf | 28 Jan 2026 |
| Form 3File: Form 3 30-09-2024.pdf | 28 Jan 2026 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold Sept 24.pdf | 28 Jan 2026 |
| Form 1File: Form 1 Dec 24.pdf | 28 Jan 2026 |
| Form 2File: FORM 2 Dec 24.pdf | 28 Jan 2026 |
| Form 3File: Form 3 31-12-2024.pdf | 28 Jan 2026 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold Dec 24.pdf | 28 Jan 2026 |
| Form 1File: Form 1 Mar 25.pdf | 28 Jan 2026 |
| Form 2File: FORM 2 Mar 25.pdf | 28 Jan 2026 |
| Form 3File: Form 3 31-03-2025.pdf | 28 Jan 2026 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory Mar 25.pdf | 28 Jan 2026 |
| Other - TechnicalFile: FORM 2A Mar 25.pdf | 21 May 2025 |
| Building plan approvalFile: HPSC4336.pdf | 16 May 2025 |
| Building plan approvalFile: HPSC4337.pdf | 16 May 2025 |
| Building plan approvalFile: HPSC4338.pdf | 16 May 2025 |
| Building plan approvalFile: HPSC4339.pdf | 16 May 2025 |
| Building plan approvalFile: HPSC4344.pdf | 16 May 2025 |
| Building plan approvalFile: HPSC4345.pdf | 16 May 2025 |
| Building plan approvalFile: HPSC4346.pdf | 16 May 2025 |
| Building plan approvalFile: HPSC4347.pdf | 16 May 2025 |
| Building plan approvalFile: HPSC4348.pdf | 16 May 2025 |
| Building plan approvalFile: HPSC4349.pdf | 16 May 2025 |
| Building plan approvalFile: HPSC4350.pdf | 16 May 2025 |
| Building plan approvalFile: HPSC4351.pdf | 16 May 2025 |
| Building plan approvalFile: HPSC4352 (2).pdf | 16 May 2025 |
| Building plan approvalFile: HPSC4353.pdf | 16 May 2025 |
| Building plan approvalFile: S0T1020800_2405131534000.pdf | 16 May 2025 |
| Building plan approvalFile: S0T1020800_2405131534001.pdf | 16 May 2025 |
| Certificates of CA (Form 3)File: Form 3 Mar 25.pdf | 16 May 2025 |
| Building Plan Approval (IOD)File: HPSC4336.pdf | 16 May 2025 |
| Building Plan Approval (IOD)File: S0T1020800_2405131534001.pdf | 16 May 2025 |
| Building Plan Approval (IOD)File: S0T1020800_2405131534000.pdf | 16 May 2025 |
| Building Plan Approval (IOD)File: HPSC4353.pdf | 16 May 2025 |
| Building Plan Approval (IOD)File: HPSC4352 (2).pdf | 16 May 2025 |
| Building Plan Approval (IOD)File: HPSC4351.pdf | 16 May 2025 |
| Building Plan Approval (IOD)File: HPSC4350.pdf | 16 May 2025 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Mumbai Suburban
Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.
Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- 3 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 4 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 220 filed documents as one ZIP, foldered, with a manifest
Keep Gaodevi Krupa Darshan SRA CHS Ltd on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near BHANDUP (WEST)6,700+ in Mumbai Suburban
Filed coordinates, straight-line distance. 481 registered projects within 2 km.
Runwal Forests Tower 9 - 11
Wheelabrator Alloy Castings Limited
SHRADDHA VARDAAN
SHRADDHA LANDMARK PRIVATE LIMITED
SHRADDHA EVOQUE
SHRADDHA LANDMARK PRIVATE LIMITED
Sugee Vaayu
Sugee Developers Private Limited
SHRADDHA CLASSIC
SHRADDHA LANDMARK PRIVATE LIMITED
Om Siddhivinayak CHS Ltd
Shree Shiv Samarth Reality
See every Mumbai Suburban project, with the district possession charts
Builder: Shivshankar Singh & Others
Shivshankar Singh & Others has 5 registrations on MahaRERA, including Gaodevi Krupa Darshan SRA CHS Ltd and Vaikunth Dham CHS Ltd. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.
Frequently asked questions
What are my rights if Gaodevi Krupa Darshan SRA CHS Ltd is delayed beyond 31 Dec 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Gaodevi Krupa Darshan SRA CHS Ltd?
The registered promoter entity is Shivshankar Singh & Others, an others as per the filing. Its GSTIN 27AAAAS5080P1ZZ can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Gaodevi Krupa Darshan SRA CHS Ltd?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against Gaodevi Krupa Darshan SRA CHS Ltd?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for Gaodevi Krupa Darshan SRA CHS Ltd?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Gaodevi Krupa Darshan SRA CHS Ltd?
The professionals named in the filing: Architect: Bhavsar Consultants; Engineer: SUDESH THUMBARE; Chartered Accountant: NEHAL MITUL FARIA. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Gaodevi Krupa Darshan SRA CHS Ltd?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback