Birla Punya Phase 1

By Birla Estates Private Limited

RG-MH-31199 · RERA P52100079533 · Last updated on MahaRERA portal: 11 Jun 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 3 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Sep 2031Possession promisedno revision filed
2 of 22Construction stages doneacross 2 buildings; furthest along: Basement (if any), 0%
100 of 285Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 116 documents Report an error

Birla Punya Phase 1 is a Others project by Birla Estates Private Limited in Pune, Maharashtra, registered with MahaRERA as P52100079533 on 10 Mar 2025. Possession is promised by 30 Sep 2031. 185 of the 285 units on this registration are recorded sold or booked, and 2 of 22 construction stages are filed complete.

At a glance

Project

  • NameBirla Punya Phase 1
  • TypeOthers
  • Location
    • Near RTO Office on Station Road
    • Sangamwadi
    • Pune
    • Pune (M Corp.)
    • Pune City
    • Pune
    • 411001
  • Pincode411001
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100079533
  • ReraGenie IDRG-MH-31199

Builder

  • NameBirla Estates Private Limited
  • Entity typeCompany
  • CINU70100MH2017PTC303291
  • GSTIN27AAHCB5831G1ZP
  • CIN and GSTIN are from this promoter's other MahaRERA registrations. This project's own filing does not repeat them.
  • Other registrations3 more →
  • Declared earlier projects3 →

Key dates

this monthRegisteredMar 2025PromisedSep 2031

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on10 Mar 2025
  • Promised completion30 Sep 2031
  • Revised completionNone
  • Buildings2 building records
  • Documents filed116 files

Current status

65%185 of 285 units booked
7.8%Work done, per cost certificate

Figures as on 11 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Tower- ANA32281886194
Tower- CNA312791091

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 11 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

2 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Basement (if any), at 0%.

Tower- A9%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Tower- C9%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 11 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed455

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots455
Closed/Covered455
BuildingClosed/CoveredTotal
Tower- A347347
Tower- C108108

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area16,940 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authorityPune Municipal Corporation
Permissible FSI65370.7
Proposed, not sanctioned36,981 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchICICI Bank Ltd., 1194/8, Ramchandra Sabhamandap, Ghole Road , Shivaji Nagar, Pune.411005
Estimated costRs 330.23 cr
Cost incurredRs 25.74 cr
Work done7.8%
BuildingWingEstimatedIncurred
Tower- ANARs 156.82 crRs 12.22 cr
Tower- CNARs 156.82 crRs 12.22 cr
-NARs 16.59 crRs 1.31 cr

Certifying professionals and partners8

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectVenkataramanan Associates
ArchitectPinnac Consulting Pvt Ltd
EngineerJW Consultant LLP
EngineerAnil T Powar
EngineerAmit R Ichake
EngineerNilesh Sudam Ghadge
Chartered AccountantAnil R Gupta & Co
Chartered AccountantS R B C & CO LLP
PartnerRole in project
Birla Estates Private Limited-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 13 Feb 2025
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 26 Sep 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 26 Sep 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 13 Feb 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Sep 2031

Documents filed116

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 116 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2025-2026)File: Form 2A - Birla Punya Phase 1 for FY 2025-26.pdf11 Jun 2026
Withdrawal Update Form 1File: Form 1 - Birla Punya Phase as on March 2026.pdf20 Apr 2026
Withdrawal Update Form 2File: Form 3 - Birla Punya Phase as on March 2026.pdf20 Apr 2026
Withdrawal Update Form 3File: Form 3_of Sangamwadi_Punya Phase I -310326 - Signed.pdf20 Apr 2026
Withdrawal Update Form 1File: Form 1 - Birla Punya Phase 1 as on Dec 2025.pdf20 Jan 2026
Withdrawal Update Form 2File: Form 2 - Birla Punya Phase 1 as on Dec 2025.pdf20 Jan 2026
Withdrawal Update Form 3File: Form 3 - Birla Punya Phase I as on Dec 2025.pdf20 Jan 2026
Withdrawal Update Form 1File: Form 1 - Birla Punya Phase 1 as on Sep 2025.pdf20 Oct 2025
Withdrawal Update Form 2File: Form 2 - Birla Punya Phase 1 as on Sep 2025.pdf20 Oct 2025
Withdrawal Update Form 3File: Form 3 - Birla Punya Phase 1 as on Sep 2025 (2).pdf20 Oct 2025
Layout approvalFile: 01 - 39 - Marked.pdf26 Sep 2025
Layout approvalFile: 02 - 39.pdf26 Sep 2025
Layout approvalFile: 03 - 39.pdf26 Sep 2025
Layout approvalFile: 04 - 39 - Tower C and Tower D.pdf26 Sep 2025
Layout approvalFile: 05 -39 - Tower A and Tower C.pdf26 Sep 2025
Layout approvalFile: 06 -39.pdf26 Sep 2025
Layout approvalFile: 07 - 39.pdf26 Sep 2025
Layout approvalFile: 08 - 39.pdf26 Sep 2025
Building plan approvalFile: 09 - 39.pdf26 Sep 2025
Layout approvalFile: 10 - 39.pdf26 Sep 2025
Building plan approvalFile: 11 - 39 - Tower A.pdf26 Sep 2025
Building plan approvalFile: 12 - 39 - Tower A.pdf26 Sep 2025
Building plan approvalFile: 13 - 39 - Tower A.pdf26 Sep 2025
Building plan approvalFile: 14 - 39 - Tower A.pdf26 Sep 2025
Building plan approvalFile: 15 - 39 - Tower A.pdf26 Sep 2025
Building plan approvalFile: 16 - 39 - Tower A.pdf26 Sep 2025
Building plan approvalFile: 17 - 39 - Tower A.pdf26 Sep 2025
Building plan approvalFile: 18 - 39 - Tower A.pdf26 Sep 2025
Building plan approvalFile: 19 - 39 - Tower A.pdf26 Sep 2025
Building plan approvalFile: 25 - 39 - Tower C.pdf26 Sep 2025
Building plan approvalFile: 26 - 39 - Tower C.pdf26 Sep 2025
Building plan approvalFile: 27 - 39 - Tower C.pdf26 Sep 2025
Building plan approvalFile: 28 - 39- Tower C.pdf26 Sep 2025
Building plan approvalFile: 29 - 39 - Tower C.pdf26 Sep 2025
Building plan approvalFile: 30 - 39 - Tower C.pdf26 Sep 2025
Building plan approvalFile: 37 - 39.pdf26 Sep 2025
Building plan approvalFile: 38 - 39.pdf26 Sep 2025
Form 5 (FY 2024-2025)File: Birla Punya Phase 1 - Form 5 # Signed copy.pdf26 Sep 2025
Form 2A (FY 2024-2025)File: Form 2A - Birla Punya Phase 1 for FY 2024-25.pdf19 Sep 2025
Form 1File: Form 1 - Birla Punya Phase 1 as on June 2025.pdf18 Jul 2025
Form 2File: Form 2 - Birla Punya Phase 1 as on June 2025.pdf18 Jul 2025
Form 3File: Form 3 - Birla Punya Phase 1 as on June 2025.pdf18 Jul 2025
Disclosure of Sold and Booked InventoryFile: Circular 29 - Birla Punya Phase 1 as on June 2025.pdf18 Jul 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Birla Punya Phase 1 as on March 2025.pdf18 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Birla Punya Phase 1 as on March 2025.pdf18 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Birla Punya Phase 1 as on March 2025.pdf4 Apr 2025
Building plan approvalFile: Plan 1 to 2.pdf21 Mar 2025
Building plan approvalFile: Plan 3 to 6.pdf21 Mar 2025
Building plan approvalFile: Plan 7 to 10.pdf21 Mar 2025
Building plan approvalFile: Plan 11 to 14.pdf21 Mar 2025
Building plan approvalFile: Plan 15 to 17.pdf21 Mar 2025
Building plan approvalFile: Plan 18 to 20.pdf21 Mar 2025
Building Plan Approval / NA Order for plotted developmentFile: Plan 1 to 2.pdf21 Mar 2025
Building Plan Approval / NA Order for plotted developmentFile: Plan 3 to 6.pdf21 Mar 2025
Building Plan Approval / NA Order for plotted developmentFile: Plan 7 to 10.pdf21 Mar 2025
Building Plan Approval / NA Order for plotted developmentFile: Plan 11 to 14.pdf21 Mar 2025
Building Plan Approval / NA Order for plotted developmentFile: Plan 15 to 17.pdf21 Mar 2025
Building Plan Approval / NA Order for plotted developmentFile: Plan 18 to 20.pdf21 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 07032025 - Birla Punya Phase-I.pdf7 Mar 2025
Other - FinanceFile: Declaration Error in Unit Count- Birla Punya Phase 1.pdf26 Feb 2025
Other - TechnicalFile: Declaration Error in Unit Count- Birla Punya Phase 1.pdf26 Feb 2025
Building plan approvalFile: Page 5 Birla.pdf14 Feb 2025
Building plan approvalFile: Page 6 Birla.pdf14 Feb 2025
Building plan approvalFile: Page 7 Birla.pdf14 Feb 2025
Building plan approvalFile: Page 8 Birla.pdf14 Feb 2025
Building plan approvalFile: Page 9 Birla.pdf14 Feb 2025
Building plan approvalFile: Sheet- (10)-compressed.pdf14 Feb 2025
Building plan approvalFile: Page 11 Birla.pdf14 Feb 2025
Building plan approvalFile: Page 12 Birla.pdf14 Feb 2025
Building plan approvalFile: Page 13 Birla.pdf14 Feb 2025
Building plan approvalFile: Sheet- (14)-compressed.pdf14 Feb 2025
Building plan approvalFile: Page 15 Birla.pdf14 Feb 2025
Building plan approvalFile: Sheet- (16)-compressed.pdf14 Feb 2025
Building Plan Approval / NA Order for plotted developmentFile: Sheet- (16)-compressed.pdf14 Feb 2025
Building Plan Approval / NA Order for plotted developmentFile: Page 15 Birla.pdf14 Feb 2025
Building Plan Approval / NA Order for plotted developmentFile: Sheet- (14)-compressed.pdf14 Feb 2025
Building Plan Approval / NA Order for plotted developmentFile: Page 13 Birla.pdf14 Feb 2025
Building Plan Approval / NA Order for plotted developmentFile: Page 12 Birla.pdf14 Feb 2025
Building Plan Approval / NA Order for plotted developmentFile: Page 11 Birla.pdf14 Feb 2025
Building Plan Approval / NA Order for plotted developmentFile: Page 9 Birla.pdf14 Feb 2025

How this compares with Pune

65%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Birla Punya Phase 1 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Sangamwadi, Pune13,700+ in Pune

2 kmBirla Punya Phase 1Completed 135Lapsed / revoked 110Other 117Dot size: filed unitsN

Filed coordinates, straight-line distance. 362 registered projects within 2 km.

Builder: Birla Estates Private Limited

Birla Estates Private Limited has 4 registrations on MahaRERA, including Birla Anayu and Birla Punya Phase 1. Its filings disclose 3 earlier MahaRERA projects, none completed yet. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Birla Punya Phase 1 is delayed beyond 30 Sep 2031?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Birla Punya Phase 1?

The registered promoter entity is Birla Estates Private Limited, a company as per the filing. Its CIN U70100MH2017PTC303291 and GSTIN 27AAHCB5831G1ZP can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Birla Punya Phase 1?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Birla Punya Phase 1?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Birla Punya Phase 1?

The professionals named in the filing: Architect: Venkataramanan Associates; Architect: Pinnac Consulting Pvt Ltd; Engineer: JW Consultant LLP; Engineer: Anil T Powar; Engineer: Amit R Ichake; Engineer: Nilesh Sudam Ghadge. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Birla Punya Phase 1?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Birla Punya Phase 1. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Birla Punya Phase 1 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.