Home / Browse projects / Pune, Maharashtra / GANGA BHAGYODAY D BLDG.

Registration lapsed No litigation declared Residential / Group Housing project

GANGA BHAGYODAY D BLDG.

By GOEL GANGA INDIA PVT LTD

RG-MH-02341 · RERA P52100000344 · Last updated on MahaRERA portal: 24 Apr 2025

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 64 months past the filed date

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • All 6 earlier projects delivered on promise

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Jun 2021Possession promised64 months past this date
10 of 11Construction stages donefurthest along: Sanitary Fittings within the flats /..., 99%
0Complaints at MahaRERAon this registration
Jump to the 77 documents Report an error

GANGA BHAGYODAY D BLDG. is a Residential / Group Housing project by GOEL GANGA INDIA PVT LTD in Pune, Maharashtra, registered with MahaRERA as P52100000344 on 15 Jul 2017. Possession was promised by 30 Jun 2021 and is now 64 months past that date.

At a glance

Project

  • NameGANGA BHAGYODAY D BLDG.
  • TypeResidential / Group Housing
  • Location
    • SINHAGAD ROAD
    • VADGAON BK
    • Pune (M Corp.)
    • Pune City
    • Pune
    • 411001
  • Pincode411001
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100000344
  • ReraGenie IDRG-MH-02341

Builder

  • NameGOEL GANGA INDIA PVT LTD
  • Entity typeCompany
  • DirectorsJAIPRAKASH SITARAM GOEL, Amit Jaiprakash Goel
  • Other registrations23 more →
  • Completed6 of 24
  • No longer live10 lapsed, de-registered or revoked
  • Declared earlier projects8 →

Key dates

64 months past promisethis monthRegisteredJul 2017PromisedJun 2021

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on15 Jul 2017
  • Promised completion30 Jun 2021
  • Revised completionNone
  • Buildings1 building record
  • Documents filed77 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
D1 BUILDING 1-10 FLOORSNA130000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 24 Apr 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

10 of 11 construction stages are filed complete. The stage furthest along is Sanitary Fittings within the flats / premises, at 99%.

D1 BUILDING 1-10 FLOORS: 100% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises99%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 24 Apr 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsYes100%
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes100%
Open ParkingNoNot applicable

Parking filed80

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots80
Closed/Covered80

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,987 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI5397.95
Proposed, not sanctioned5,198 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchLAUKIK APARTMENTS GROUND FLOOR PLOT NO 3 CTS NO 870 BHANDARKAR ROAD PUNE 411004

Certifying professionals and partners2

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSpace Designer Syndicate
EngineerNILESH POTE
PartnerRole in project
Legends County Landmark Pvt Ltd-

Litigation declared6

CaseCourtStatus
35/2016NGTDISPOSED OFF
10854/2016SUPREME COURTPENDING
890/2008CIVIL COURT PUNEPENDING
162/2014CIVIL COURT PUNEPENDING
62/2015CIVIL COURT PUNEDISPOSED OFF
110/2017NGTPENDING

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 7 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 25 Jun 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 5 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 7 Jul 2017Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed77

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 D1.pdf24 Apr 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 D1.pdf24 Apr 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1_GBT D_ARCH_December 2024.pdf30 Jan 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1_GBT D_ARCH_December 2024.pdf30 Jan 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2_GBT D_ENGG_December 2024.pdf30 Jan 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: GBT D-Arch-Sept 2024.pdf8 Oct 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: GBT D-Engg-Sept 2024.pdf8 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: GBT D-Quality-Sept 2024.pdf8 Oct 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: GBT D-Arch-Sept 2024.pdf8 Oct 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: GBT D-Engg-Sept 2024.pdf8 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: GBT D-Quality-Sept 2024.pdf8 Oct 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: GBT D_ARCH_march 2024.pdf2 Jul 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: GBT D_ARCH_June 2024.pdf2 Jul 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: GBT D_ENGG_march 2024.pdf2 Jul 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: GBT D_ENGG_June 2024.pdf2 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: GBT D_QUALITY_march 2024.pdf2 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: GBT D_QUALITY_June 2024.pdf2 Jul 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: GBT D_ARCH_June 2024.pdf1 Jul 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: GBT D_ENGG_June 2024.pdf1 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: GBT D_QUALITY_June 2024.pdf1 Jul 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: GBT D_ARCH_30-12-23.pdf30 Dec 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: GBT D_ENGG_30-12-23.pdf30 Dec 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: GBT D_QUALITY_30-12-23.pdf30 Dec 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: GBT D_ARCH_30-9-23.pdf18 Sep 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: GBT D_ENGG_30-9-23.pdf18 Sep 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: GBT D_QUALITY_30-9-23.pdf18 Sep 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: GBT D_QUALITY_30-6-23.pdf19 Jul 2023
OtherFile: 10-8-2018 37233_2016_Judgement_10-Aug-2018.pdf18 Apr 2023
OtherFile: 27-1-2020 37233_2016_15_1_19914_Order_27-Jan-2020 GBT ORDER.pdf18 Apr 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: GBT D_FORM 5_2020.pdf6 Apr 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: GBT D_FORM 5_2021.pdf6 Apr 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: GBT D_Architect Certificate_March23.pdf4 Apr 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: GBT D ARCH.pdf4 Apr 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: GBT D_Engineer Certificate_March23.pdf4 Apr 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: GBT D ENGG.pdf4 Apr 2023
Form 2AFile: GBT D QUALITY RCC.pdf4 Apr 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: GBT _Quality Certificate_March23.pdf4 Apr 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: GBT D_Quality Certificate_March23.pdf4 Apr 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: GBT DARCH.pdf5 Feb 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: GBT D ARCH.pdf5 Feb 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: GBT D ARCH.pdf5 Feb 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: GBT D ENGG.pdf5 Feb 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: GBT D ENGG.pdf5 Feb 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: GBT D ENGG.pdf5 Feb 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: GBT D RCC 2A.pdf5 Feb 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: GBT D RFF 2A.pdf5 Feb 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: GBT D 2A RCC.pdf5 Feb 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: GBT D 2A RFF.pdf5 Feb 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: GBT D 2A.pdf5 Feb 2023
OtherFile: GBT D- Sold Inventory.pdf2 Dec 2021
Declaration about Commencement CertificateFile: GBT D - Circular 32- Format D COMMENCEMENT (2).pdf18 Nov 2021
Disclosure of sold/ booked inventoryFile: GB D - Disclosure OF SOLD INVENTORY.pdf16 Nov 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: form 5 gbt d 3132018 BHAGYODAY D.pdf15 Nov 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: FORM 5 RERA AS ON 31 3 2019 BHAGYODAY D.pdf15 Nov 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: FORM 5 RERA AS ON 3132020 GB D.pdf15 Nov 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: GBT D.pdf18 Sep 2021
Status of Formation of Legal Entity (Society/Co Op etc.)File: Ganga Bhagyday D1 Registration.pdf10 Oct 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: GANGA BHAGYODAY D.pdf16 Aug 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: BHAGYODAY D.pdf16 Aug 2019
Form 2AFile: D.pdf5 Aug 2019
PAN CardFile: GOEL GANGA INDIA PVT LTD PAN.pdf28 Feb 2018
OtherFile: GBT EC revised 20-11-2017.pdf27 Feb 2018
Proforma of Allotment letterFile: Ganga Bhagyoday-D1 Agmt-.pdf8 Aug 2017
Copy of the legal title reportFile: Bhagyoday Title.pdf7 Jul 2017
Details of encumbrancesFile: Bhagyoday Encumbrance cert.pdf7 Jul 2017
Commencement Certificates / NA Order for plotted developmentFile: CC BHAGYODAY.pdf7 Jul 2017
Declaration in FORM BFile: BHAGYODAY B FORM - D1.pdf7 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: BHAGYODAY D 1 ARCH CERT.pdf7 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: BHAGYODAY D 1 ENGG CERT.pdf7 Jul 2017
Certificates of CA (Form 3)File: bhagyoday D1 CA Cert.pdf7 Jul 2017
Proforma of Allotment letterFile: Ganga Bhagyoday-D1 Agmt- Final.pdf7 Jul 2017
Building plan approvalFile: GANGA BHAGYODAY D BUILDING IOD UNDERTAKING.pdf5 Jul 2017
Building Plan Approval (IOD)File: GANGA BHAGYODAY D BUILDING IOD UNDERTAKING.pdf5 Jul 2017
Certificates of CA (Form 5)File: FORM 5 IPL.pdf5 Jul 2017
Layout approvalFile: Bhagyoday-II.pdf25 Jun 2017
PAN CardFile: IPL PAN CARD.pdf25 Jun 2017
Copy of Layout Approval (in case of layout)File: Bhagyoday-II.pdf25 Jun 2017

Promoter's earlier projects6

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

6 delivered on promise
ProjectLocationFlatsRegisteredStatusPromisedDelivered
GANGA LEGEND A2 AND B4P52100021020BAVDHAN, Pune272May 2019CompletedDec 2023Dec 2023
GANGA GLITZSurvey No 16 P AND Survey No 17 P Village Undri Taluka Haveli District Pune 411 060192-CompletedApr 2018Apr 2017
GANGA ARCADIASR NO 22 Hissa No 2 Village Kharadi Taluka Haveli District Pune 41101428-CompletedJun 2017Jun 2017
GANGA ARCADIASurvey No. 22 Hissa No 2 situated at Village Kharadi Taluka Haveli District Pune 411 014120-CompletedDec 2015Oct 2015
GANGA SPARSHSurvey No 16Pand 17 P Village Undri Taluka Haveli District Pune154-CompletedApr 2014Nov 2013
AMRUTGANGAVADGAON BK PUNE611-CompletedDec 2013Oct 2013

How this compares with Pune

26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is among them

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep GANGA BHAGYODAY D BLDG. on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near VADGAON BK13,700+ in Pune

2 kmGANGA BHAGYODAY D BLDG.Completed 51Lapsed / revoked 29Other 66Dot size: filed unitsN

Filed coordinates, straight-line distance. 146 registered projects within 2 km.

Builder: GOEL GANGA INDIA PVT LTD

GOEL GANGA INDIA PVT LTD has 24 registrations on MahaRERA, including GANGA GLITZ F. BLDG and GANGA LEGEND A4 AND B1... Its filings disclose 8 earlier MahaRERA projects: declares 6 of 6 past projects completed on time. Litigation is declared on 11 of its registrations. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What does it mean that GANGA BHAGYODAY D BLDG. shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if GANGA BHAGYODAY D BLDG. is delayed beyond 30 Jun 2021?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of GANGA BHAGYODAY D BLDG.?

The registered promoter entity is GOEL GANGA INDIA PVT LTD, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in GANGA BHAGYODAY D BLDG.?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for GANGA BHAGYODAY D BLDG.?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at GANGA BHAGYODAY D BLDG.?

The professionals named in the filing: Architect: Space Designer Syndicate; Engineer: NILESH POTE. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in GANGA BHAGYODAY D BLDG.?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About GANGA BHAGYODAY D BLDG.. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save GANGA BHAGYODAY D BLDG. to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.