ReraGenieLog inGet a buyer report

Home / Browse projects / Pune, Maharashtra / GANGA ASMI WING 2

Registered Litigation declared Residential / Group Housing project

GANGA ASMI WING 2

By SHANTIMOHANDEVELOPERS LLP

RG-MH-27456 · RERA P52100034068 · Last updated on MahaRERA portal: 29 May 2026

Source: official MahaRERA filing

Red flags

  • Litigation declared, 14 cases

Clear

  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • All 1 earlier projects delivered on promise

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2028Possession promisedno revision filed
3 of 33Construction stages doneacross 3 buildings; furthest along: Slabs of Super Structure, 85%
0Complaints at MahaRERAon this registration
Jump to the 85 documents Report an error

GANGA ASMI WING 2 is a Residential / Group Housing project by SHANTIMOHANDEVELOPERS LLP in Pune, Maharashtra, registered with MahaRERA as P52100034068 on 24 Mar 2022. Possession is promised by 31 Dec 2028.

At a glance

Project

  • NameGANGA ASMI WING 2
  • TypeResidential / Group Housing
  • Location
    • NEAR GANAPATI MANDIR
    • WAKAD
    • Mulshi
    • Pune
    • 411057
  • Pincode411057
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100034068
  • ReraGenie IDRG-MH-27456

Builder

  • NameSHANTIMOHANDEVELOPERS LLP
  • Entity typePartnership
  • PartnerATUL JAIPRAKASH GOEL
  • Declared earlier projects1 →

Key dates

this monthRegisteredMar 2022PromisedDec 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on24 Mar 2022
  • Promised completion31 Dec 2028
  • Revised completionNone
  • Buildings3 building records
  • Documents filed85 files

Current status

31.2%Work done, per cost certificate

Figures as on 29 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
GANGA ASMI WING 2 UPTO PODIUM LEVELNA20000
GANGA ASMI WING 2 1-15 FLOORSNA150000
GANGA ASMI WING 2 16-28 FLOORSNA130000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 29 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

3 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Slabs of Super Structure, at 85%.

GANGA ASMI WING 2 UPTO PODIUM LEVEL42%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)67%
Plinth100%
Stilt Floor0%
Slabs of Super Structure85%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises6%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
GANGA ASMI WING 2 1-15 FLOORS0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
GANGA ASMI WING 2 16-28 FLOORS0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 29 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed284

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots284
Closed/Covered284
BuildingClosed/CoveredTotal
GANGA ASMI WING 2 UPTO PODIUM LEVEL1010
GANGA ASMI WING 2 1-15 FLOORS147147
GANGA ASMI WING 2 16-28 FLOORS127127

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area3,281 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authorityPCMC
Permissible FSI51998.24
Proposed, not sanctioned1,998 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchCAMP PUNE
Estimated costRs 156.86 cr
Cost incurredRs 48.99 cr
Work done31.23%
BuildingWingEstimatedIncurred
-NARs 78.43 crRs 23.29 cr
GANGA ASMI WING 2 1-15 FLOORSNARs 29.08 crRs 11.21 cr
GANGA ASMI WING 2 16-28 FLOORSNARs 28.74 cr-
GANGA ASMI WING 2 UPTO PODIUM LEVELNARs 20.61 crRs 14.48 cr

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSPACE DESIGNERS SYNDICATE
EngineerI M PATEL
EngineerSatish Jagtap
Chartered AccountantA R TATIYA
PartnerRole in project
SHANTIMOHANDEVELOPERS LLP-

Litigation declared14

CaseCourtStatus
395/2001CIVIL COURT PUNEDISPOSED OFF
5055/2012CIVIL COURT PUNEDISPOSED OFF
55/2013CIVIL COURT PUNEDISPOSED OFF
52/2015CIVIL COURT PUNEDISPOSED OFF
755/2016CIVIL COURT PUNEDISPOSED OFF
153/2016CIVIL COURT PUNEDISPOSED OFF
285/2017CIVIL COURT PUNEPENDING
673/2017CIVIL COURT PUNEDISPOSED OFF
438/2017RTS APPEALDISPOSED OFF
58/2020CIVIL JUDGE JUNIOR DEVISION PIMPRI PUNEPENDING
870/2021CIVIL JUDGE JUNIOR DIVISION PUNEPENDING
942/2021CIVIL JUDGE JUNIOR DIVISION PUNEPENDING
737/2022REVENUE COURT PUNEDISPOSED OFF
285/2017/2017Pimpri Court, PuneOngoing

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 8 Mar 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 21 Feb 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 24 Feb 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 20 Feb 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2028

Documents filed85

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 85 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: ASMI 2-Form 1.pdf29 May 2026
Withdrawal Update Form 1File: ASMI 2-Arch.pdf29 May 2026
Withdrawal Update Form 1File: ASMI 2-Arch-Sept 2025.pdf29 May 2026
Withdrawal Update Form 1File: Asmi 2 -Arch-Dec 2025.pdf29 May 2026
Withdrawal Update Form 2File: ASMI 2-Form 2.pdf29 May 2026
Withdrawal Update Form 2File: ASMI 2-Engg.pdf29 May 2026
Withdrawal Update Form 2File: ASMI 2-Engg-Sept 2025.pdf29 May 2026
Withdrawal Update Form 2File: Asmi 2 -Engg-Dec 2025.pdf29 May 2026
Withdrawal Update Form 3File: ASMI 2.pdf29 May 2026
Withdrawal Update Form 3File: ASMI 2 JUNE.pdf29 May 2026
Withdrawal Update Form 3File: ASMI 2 SEPT.pdf29 May 2026
Withdrawal Update Form 3File: ASMI 2 -Form 3.pdf29 May 2026
Form 5 (FY 2025-2026)File: ASMI 2.pdf7 May 2026
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ASMI 2-Arch.pdf18 Jul 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ASMI 2-Engg.pdf18 Jul 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: ASMI 2-Quality.pdf18 Jul 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: ASMI 2-Dec 2022.pdf6 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: ASMI 2-June 2023.pdf6 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: ASMI 2-Dec 2023.pdf22 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: ASMI 2-June 2022.pdf22 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: ASMI 2-March 2022.pdf22 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: ASMI 2-March 2024.pdf22 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: ASMI 2-Sept 2022.pdf22 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: ASMI 2-March 2025.pdf22 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ASMI 2-Arch.pdf3 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ASMI 2 -Engg.pdf3 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: ASMI 2-Quality.pdf3 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ASMI 2-Arch-Dec 2024.pdf3 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ASMI 2-Engg-Dec 2024.pdf3 Jan 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: ASMI 2-Quality-Dec 2024.pdf3 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ASMI 2-Arch-Sept 2024.pdf8 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: ASMI 2-Quality-Sept 2024.pdf8 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ASMI 2_ENGG_June 2024.pdf6 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: ASMI 2_QUALITY_June 2024.pdf6 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ASMI 2_ARCH_march 2024.pdf2 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ASMI 2_ARCH_June 2024.pdf2 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ASMI 2_ENGG_march 2024.pdf2 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: ASMI 2_QUALITY_march 2024.pdf2 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: ASMI 2_form 3 2024.pdf2 Jul 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: ASMI 2_form 5 2024.pdf2 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: ASMI 2 form 3 2022.pdf1 Jun 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Asmi 2_Form5_2023.pdf7 Mar 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5 ASMI WING 2.pdf5 Mar 2024
Building plan approvalFile: 01-13_11zon.pdf24 Feb 2024
Building Plan Approval / NA Order for plotted developmentFile: 01-13_11zon.pdf24 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ASMI 2_ARCH_30-12-23.pdf30 Dec 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ASMI 2_ENGG_30-12-23.pdf30 Dec 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: ASMI 2_QUALITY_30-12-23.pdf30 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ASMI 2_ARCH_30-9-23.pdf18 Sep 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ASMI 2 _ENGG_30-9-23.pdf18 Sep 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: ASMI 2 _QUALITY_30-9-23.pdf18 Sep 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ASMI 1_ARCH_30-6-23.pdf19 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ASMI 2_ARCH_30-6-23.pdf19 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ASMI 2_ENGG_30-6-23.pdf19 Jul 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Asmi 2_Quality_June 2023.pdf19 Jul 2023
Details of encumbrancesFile: Encumbrance wing A Ganga Asmi wing 2 compressed.pdf3 May 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: ASMI 1 FORM 3 2022 SEP.pdf3 May 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format - A WING 2.pdf28 Apr 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Request letter Wing - 2.pdf28 Apr 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Declaration Wing - 2.pdf28 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ASMI 2 ARCH.pdf5 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ASMI 2 ENGG.pdf5 Feb 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: ASMI 2 2A.pdf5 Feb 2023
Declaration about Commencement CertificateFile: Ganga Asmi Declaration - Format D 1.pdf16 Mar 2022
Declaration in FORM BFile: FROM B - Affidavit- Cum-Declaration - Wakad (1).pdf16 Mar 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Ganga Asmi Wing 2 (2) (1).pdf16 Mar 2022
Details of encumbrancesFile: Encumbrance Certificate Shanti Mohan DevLLPdated732022.pdf9 Mar 2022
Declaration in FORM BFile: ASMI WING 2 FORM Bcompressed.pdf9 Mar 2022
Copy of the legal title reportFile: Wakad Land Title Report-Format A070322_compressed (1).pdf8 Mar 2022
Copy of the legal title reportFile: ASMI WING 2 Wakad Land Title ReportFormat A.pdf8 Mar 2022
Proforma of Allotment letterFile: ASMI WING 2 ALLOTMENT LETTER 2 BHK.pdf5 Mar 2022
Proforma of Allotment letterFile: ASMI WING 2 3 BHK ALLOTMENT LETTER.pdf5 Mar 2022
CERSAI detailsFile: ASMI CERSAI WING 2.pdf4 Mar 2022
Copy of the legal title reportFile: Title Certificate Wakad lands dt 04022022.pdf1 Mar 2022
Declaration in FORM BFile: ASMI WING 2 FORM B_compressed.pdf1 Mar 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: GANGA ASMI WING 2 RERA FORM 3 2122022.pdf25 Feb 2022
Proforma of Allotment letterFile: ASMI WING 2 AGREEMENT DRAFT RERA R0.pdf25 Feb 2022
Building plan approvalFile: ASMI BUILDING PLAN 1 MB1.pdf21 Feb 2022
Layout approvalFile: Wakad IOD Plan (1) NEW TDR 15000.pdf21 Feb 2022
Copy of Layout Approval (in case of layout)File: Wakad IOD Plan (1) NEW TDR 15000.pdf21 Feb 2022

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationRegisteredStatusPromisedDelivered
GANGA DHAM TOWER A..P52100000393BIBVEWADI, PuneJul 2017Certificate SignedApr 2026Feb 2025

How this compares with Pune

26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep GANGA ASMI WING 2 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near WAKAD13,700+ in Pune

2 kmGANGA ASMI WING 2Completed 143Lapsed / revoked 47Other 85Dot size: filed unitsN

Filed coordinates, straight-line distance. 275 registered projects within 2 km.

Builder: SHANTIMOHANDEVELOPERS LLP

SHANTIMOHANDEVELOPERS LLP has 1 registration on MahaRERA, including GANGA ASMI WING 2. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if GANGA ASMI WING 2 is delayed beyond 31 Dec 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of GANGA ASMI WING 2?

The registered promoter entity is SHANTIMOHANDEVELOPERS LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in GANGA ASMI WING 2?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for GANGA ASMI WING 2?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at GANGA ASMI WING 2?

The professionals named in the filing: Architect: SPACE DESIGNERS SYNDICATE; Engineer: I M PATEL; Engineer: Satish Jagtap; Chartered Accountant: A R TATIYA. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in GANGA ASMI WING 2?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About GANGA ASMI WING 2. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save GANGA ASMI WING 2 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.