Home / Browse projects / Mumbai Suburban, Maharashtra / Ganesh Bhuvan CHS Ltd

Registered No litigation declared Residential / Group Housing project

Ganesh Bhuvan CHS Ltd

By Shree Swami Samarth Developers (Project Ganesh Bhuvan)

RG-MH-94110 · RERA P51800032161 · Last updated on MahaRERA portal: 20 Apr 2026

Source: official MahaRERA filing

Red flags

  • Rs 35.00 crore secured on the land, in favour of AU Small Finance Bank

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedno revision filed
8 of 22Construction stages doneacross 2 buildings; furthest along: Slabs of Super Structure, 90%
258 of 303Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 88 documents Report an error

Ganesh Bhuvan CHS Ltd is a Residential / Group Housing project by Shree Swami Samarth Developers (Project Ganesh Bhuvan) in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800032161 on 14 Dec 2021. Possession is promised by 31 Dec 2027. 45 of the 303 units on this registration are recorded sold or booked, and 8 of 22 construction stages are filed complete.

At a glance

Project

  • NameGanesh Bhuvan CHS Ltd
  • TypeResidential / Group Housing
  • Location
    • Jamil nagar
    • Bhandup west
    • Kurla
    • Mumbai Suburban
    • 400078
  • Pincode400078
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800032161
  • ReraGenie IDRG-MH-94110

Builder

  • NameShree Swami Samarth Developers (Project Ganesh Bhuvan)
  • Entity typePartnership
  • PartnerVaibhav Atmaram Kokate

Key dates

this monthRegisteredDec 2021PromisedDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on14 Dec 2021
  • Promised completion31 Dec 2027
  • Revised completionNone
  • Buildings2 building records
  • Documents filed88 files

Current status

15%45 of 303 units booked

Figures as on 20 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Rehab wing ANA23201105115
Sale wing BNA22191817188

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 20 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

8 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Slabs of Super Structure, at 90%.

Rehab wing A49%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure85%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises20%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks25%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.10%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Sale wing B50%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure90%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises20%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks25%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.10%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities16

As on 20 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%
Common area LightingYes0%

Parking filed2

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots2
Closed/Covered2
BuildingClosed/CoveredTotal
Rehab wing A11
Sale wing B11

Land and ownership

A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area1,634 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared present
Charge in favour ofAU Small Finance Bank
Secured amountRs 35.00 crore
CERSAI search filedYes
Declared on2 Feb 2026

Approvals and building plan

Sanctioning authoritySlum Rehabilitation Authority
Permissible FSI11302.0
Proposed, not sanctioned4,902 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branch5th floor Kanakia Zillion E wing Jn of CST and LBS marg, Kurla west Mumbai 400070

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectDesign Crest
EngineerVinayak chopdekar& Associates
Chartered AccountantN M Kane & Co
Chartered AccountantA N K S & Co.
Chartered AccountantVijay Sawant
PartnerRole in project
Shree Swami Samarth Developers (Project Ganesh Bhuvan)-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 2 Dec 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 24 Nov 2021
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 24 Nov 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 13 Nov 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2027

Documents filed88

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 88 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: Form 1 GB.pdf20 Apr 2026
Form 2File: Form 2 GB.pdf20 Apr 2026
Form 3File: GB Form 3 signed V1_compressed.pdf20 Apr 2026
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold inventory Q4 GB.pdf20 Apr 2026
Form 1File: Form-1 Q3 of FY 25-26.pdf20 Jan 2026
Form 2File: Form 2 Q3 of FY 25-26_compressed.pdf20 Jan 2026
Form 3File: Form 3 GB signed Q3 of FY 25-26_compressed.pdf20 Jan 2026
Disclosure of Sold and Booked InventoryFile: Disclosure GB Q3 of FY 25-26...pdf20 Jan 2026
Form 2A (FY 2024-2025)File: GB - Form 2A - 31.03.2025.pdf25 Dec 2025
Form 1File: Form 1 GB.pdf19 Oct 2025
Form 2File: GB Form 2 Compressed.pdf19 Oct 2025
Form 3File: Ganesh Bhuvan CHS Form 3_Compressed.pdf19 Oct 2025
Disclosure of Sold and Booked InventoryFile: GB Disclosure of Sold Inventory.pdf19 Oct 2025
Form 5 (FY 2024-2025)File: Form 5 Ganesh Bhuvan Signed.pdf29 Sep 2025
Form 1File: Form-1 30-06-2024.pdf29 Jul 2025
Form 2File: Form-2 30-06-2024.pdf29 Jul 2025
Form 3File: FORM 3 30-06-2024.pdf29 Jul 2025
Disclosure of Sold and Booked InventoryFile: Disclosure OF sold Inventory Q1 FY 24-25.pdf29 Jul 2025
Form 1File: Form 1 30-09-2024.pdf29 Jul 2025
Form 2File: Final Form -2 30-09-2024.pdf29 Jul 2025
Form 3File: GB - Form-3 30-09-2024 compressed.pdf29 Jul 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Inventory Q2 Signed.pdf29 Jul 2025
Form 1File: Form-1 31-12-2024 pdf.pdf29 Jul 2025
Form 2File: Ganesh_Bhuvan _Form2_31-12-2024 compressed.pdf29 Jul 2025
Form 3File: GB Form 3 31-12-2024 compressed.pdf29 Jul 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of sold inventory Q3.pdf29 Jul 2025
Form 1File: Form 1 31-03-2025.pdf29 Jul 2025
Form 2File: Ganesh bhuvanForm2 31-03-2025 compressed.pdf29 Jul 2025
Form 3File: GB Form 3 31-03-2025 compressed.pdf29 Jul 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Inventory Q4 FY 24-25.pdf29 Jul 2025
Form 1File: Form-1 30_06_2025 pdf.pdf19 Jul 2025
Form 2File: Ganeshbhuvan Rera-30-06-2025_compressed.pdf19 Jul 2025
Form 3File: Ganesh Bhuvan Form 3_V1_compressed.pdf19 Jul 2025
Disclosure of Sold and Booked InventoryFile: Sold & Unsold Ganesh Bhuvan Q1 FY 25-26.pdf19 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 30_06_2025 pdf.pdf18 Jul 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Ganesh Bhuvan Form 3_V1_compressed.pdf18 Jul 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Ganeshbhuvan Rera-30-06-2025_compressed.pdf18 Jul 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: GB - Form 2A - 31032025.pdf30 Jun 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 31032025.pdf20 Jun 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: GB Form 3 31032025 compressed.pdf20 Jun 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 1 31032025.pdf20 Jun 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Ganesh bhuvanForm2 31032025 compressed.pdf20 Jun 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: GB Form 2A 31032021.pdf20 Jun 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: GB Form 5 31032022.pdf20 Jun 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: GB Form 2A - 31032022.pdf20 Jun 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: GB Form 2A 31032023.pdf20 Jun 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: GB Form 5 31032023.pdf20 Jun 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: GB Form 2A 31032024.pdf20 Jun 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: GB Form 5 31032024.pdf20 Jun 2025
Proforma of Agreement for saleFile: Master Copy Agreement for Sale.pdf17 Feb 2025
Details of encumbrancesFile: Encumberance letter AU bank.pdf14 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf24 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Final Form -3.pdf24 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Final Form -2.pdf24 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1.pdf25 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2.pdf25 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf25 Jul 2024
Copy of the legal title reportFile: Legal Title Report as per circular - 28-2021_compressed.pdf2 Dec 2021
Copy of the legal title reportFile: 7-12 extract.pdf2 Dec 2021
Copy of the legal title reportFile: 208.pdf2 Dec 2021
Copy of the legal title reportFile: Search report.pdf2 Dec 2021
Copy of the legal title reportFile: Developement agreement of Ganesh Bhuvan Index-2.pdf2 Dec 2021
Copy of the legal title reportFile: Ganesh bhavan Land acquisation Gadget.pdf2 Dec 2021
CERSAI detailsFile: CERSAI_Search_Report_200225353338_For_AOR_Based_Search_06_12_2021_12_42_57_066.pdf2 Dec 2021
Proforma of Allotment letterFile: MASTER COPY Sale Agreement -Final.pdf2 Dec 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1-Architect Certificate revised.pdf1 Dec 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Engineer Certificate.pdf1 Dec 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form - 3 CA Certificate - Revised.pdf1 Dec 2021
Proforma of Allotment letterFile: Proforma Allotment Letter.pdf1 Dec 2021
Building plan approvalFile: IOA_compressed.pdf24 Nov 2021
Building plan approvalFile: Amended plan letter.pdf24 Nov 2021
Building plan approvalFile: 1.pdf24 Nov 2021
Building plan approvalFile: 3.pdf24 Nov 2021
Building plan approvalFile: 4.pdf24 Nov 2021
Building plan approvalFile: 5.pdf24 Nov 2021
Layout approvalFile: 1.pdf24 Nov 2021
Details of encumbrancesFile: To WHOMSOEVER IT MAY CONCERN.pdf24 Nov 2021
Copy of Layout Approval (in case of layout)File: 1.pdf24 Nov 2021
Building Plan Approval / NA Order for plotted developmentFile: Amended plan letter.pdf24 Nov 2021
Building Plan Approval / NA Order for plotted developmentFile: 1.pdf24 Nov 2021

How this compares with Mumbai Suburban

15%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Ganesh Bhuvan CHS Ltd on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Bhandup west6,700+ in Mumbai Suburban

2 kmGanesh Bhuvan CHS LtdCompleted 38Lapsed / revoked 22Other 54Dot size: filed unitsN

Filed coordinates, straight-line distance. 114 registered projects within 2 km.

Builder: Shree Swami Samarth Developers (Project Ganesh Bhuvan)

Shree Swami Samarth Developers (Project Ganesh Bhuvan) has 1 registration on MahaRERA, including Ganesh Bhuvan CHS Ltd. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if Ganesh Bhuvan CHS Ltd is delayed beyond 31 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Ganesh Bhuvan CHS Ltd?

The registered promoter entity is Shree Swami Samarth Developers (Project Ganesh Bhuvan), a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Ganesh Bhuvan CHS Ltd?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Ganesh Bhuvan CHS Ltd?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Ganesh Bhuvan CHS Ltd?

The professionals named in the filing: Architect: Design Crest; Engineer: Vinayak chopdekar& Associates; Chartered Accountant: N M Kane & Co; Chartered Accountant: A N K S & Co.; Chartered Accountant: Vijay Sawant. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Ganesh Bhuvan CHS Ltd?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Ganesh Bhuvan CHS Ltd. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Ganesh Bhuvan CHS Ltd to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.