ReraGenieLog inGet a buyer report

Home / Browse projects / Gandharv Pearl Project I

Completed No litigation declared Others project

Gandharv Pearl Project I

By Vinayak Pandharinath Bhongale

RG-MH-38874 · RERA P52100046690 · Last updated on MahaRERA portal: 19 Nov 2024

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA
  • All 1 earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 12 other registrations and every project registered within 2 km.

See what the report covers Free either way: .
Jul 2024Possession promisedregistration recorded completed
8 of 11Construction stages donefurthest along: Sanitary Fittings within the flats /..., 75%
0Complaints at MahaRERAon this registration
Jump to the 86 documents Report an error

Gandharv Pearl Project I is a Others project by Vinayak Pandharinath Bhongale in Dighi, 411015, registered with MahaRERA as P52100046690 on 29 Aug 2022. The registration is recorded completed; possession was promised by 30 Jul 2024.

At a glance

Project

  • NameGandharv Pearl Project I
  • TypeOthers
  • Location
    • Manjuribai Vidyalaya Dighi Road
    • Dighi
    • 411015
  • Pincode411015
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100046690
  • ReraGenie IDRG-MH-38874

Builder

  • NameVinayak Pandharinath Bhongale
  • Entity typeIndividual
  • Other registrations12 more →
  • Completed7 of 13
  • No longer live1 lapsed, de-registered or revoked
  • Past their filed date1
  • Declared earlier projects6 →

Key dates

this monthRegisteredAug 2022PromisedJul 2024Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on29 Aug 2022
  • Promised completion30 Jul 2024
  • Revised completionNone
  • Buildings1 building record
  • Documents filed86 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Gandharv Pearl Project INA80000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 19 Nov 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

8 of 11 construction stages are filed complete. The stage furthest along is Sanitary Fittings within the flats / premises, at 75%.

Gandharv Pearl Project I: 80% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises75%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 19 Nov 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed112

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots112
Closed/Covered31
Open Space81

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area835 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI3084.41
Proposed, not sanctioned3,084 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchMumbai Pune Road Pimpri Pune 411018

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectA Square Architects Through Atul Ranpise
EngineerAbhijit Panchal
Chartered AccountantP B Phapale
PartnerRole in project
Vinayak Pandharinath Bhongale-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 25 Aug 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 25 Aug 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 7 Oct 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 7 Oct 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 13 Aug 2024

Documents filed86

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 86 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Gandharv Pearl Form 5.pdf19 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Gandharv Pearl Form 5.pdf19 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Gandharv Pearl.pdf12 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate Gandharv Pearl.pdf12 Nov 2024
Disclosure of sold/ booked inventoryFile: Sold Book Inventory G Pearl.pdf12 Nov 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Quality_Gandharv Pearl Project I.pdf12 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Pearl.pdf20 Oct 2024
Architect’s Certificate on Completion of Project (Form 4)File: Architect's Completion certificate Form 4.pdf15 Oct 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Completion Certificate.pdf13 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architects Certificate.pdf8 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate.pdf8 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Quality Assurance.pdf8 Jul 2024
Disclosure of sold/ booked inventoryFile: Sold Book.pdf8 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate.pdf8 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect's Certificate_Gandharv Pearl.pdf18 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate_Gandharva Pearl.pdf18 Apr 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Quality Assurance Gandharv Pearl.pdf18 Apr 2024
Disclosure of sold/ booked inventoryFile: Sold Book_Inventory Gandharv Pearl.pdf18 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate_Gandharv Pearl.pdf18 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Gandharv Pearl.pdf18 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate Gandharv Pearl.pdf18 Jan 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Quality Certificate Gandharv Pearl.pdf18 Jan 2024
Disclosure of sold/ booked inventoryFile: Sold Book Gandharv Pearl.pdf18 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Gandharv Pearl.pdf18 Jan 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Audit Report - Gandharv Pearl.pdf1 Nov 2023
Disclosure of sold/ booked inventoryFile: Revised FINAL Sold Booked.pdf31 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect's Certificate Gandharv Pearl.pdf27 Oct 2023
Disclosure of sold/ booked inventoryFile: Sold Booked Inventory Gandharv Pearl.pdf27 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineering Certificate.pdf26 Oct 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Quality Assurance Certificate.pdf26 Oct 2023
Building plan approvalFile: Revised Santion plan 2023 ( CHANGES MARKED).pdf7 Oct 2023
Building Plan Approval / NA Order for plotted developmentFile: Revised Santion plan 2023 ( CHANGES MARKED).pdf7 Oct 2023
Commencement Certificates / NA Order for plotted developmentFile: Revised Commencement Certificate 23.pdf7 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Gandharv pearl project 1 Architect Certificate 25-09-23.pdf7 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERT PEARL I 02-10-2023_compressed.pdf7 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Pearl new_compressed (1).pdf31 Aug 2023
Layout approvalFile: layout 1.pdf25 Aug 2023
Building plan approvalFile: revised layout 2.pdf25 Aug 2023
Building plan approvalFile: layout 3.pdf25 Aug 2023
Building plan approvalFile: layout 4.pdf25 Aug 2023
Copy of the legal title reportFile: 1 Copy of the legal title report.pdf25 Aug 2023
Copy of Layout Approval (in case of layout)File: layout 1.pdf25 Aug 2023
Building Plan Approval / NA Order for plotted developmentFile: revised layout 2.pdf25 Aug 2023
Building Plan Approval / NA Order for plotted developmentFile: layout 3.pdf25 Aug 2023
Building Plan Approval / NA Order for plotted developmentFile: layout 4.pdf25 Aug 2023
Commencement Certificates / NA Order for plotted developmentFile: CC.pdf25 Aug 2023
Proforma of Allotment letterFile: 2 Proforma of Agreement for sale.pdf25 Aug 2023
Proforma of Agreement for saleFile: 2 Proforma of Agreement for sale.pdf25 Aug 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Peral I.pdf21 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engi Pearl.pdf21 Jul 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Peral I.pdf21 Jul 2023
Disclosure of sold/ booked inventoryFile: sold Pearl 1.pdf21 Jul 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Pearl 1_compressed.pdf21 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Peral I.pdf18 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: gandharv pearl project 1.pdf29 May 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate Gandharv Pearl 1.pdf24 May 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Quality Assurance Gandharv pearl 1.pdf24 May 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Quality Assurance Gandharav nagari A6.pdf24 May 2023
Disclosure of sold/ booked inventoryFile: Booked Enventory Gandharv Pearl 1.pdf24 May 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA certificate Pearl_compressed (1).pdf19 May 2023
Copy of the legal title reportFile: Search Title Report.pdf20 Aug 2022
Copy of the legal title reportFile: Format A Legal Title Report.pdf20 Aug 2022
Copy of the legal title reportFile: Format A.pdf20 Aug 2022
Proforma of Allotment letterFile: Allotment Letter.pdf20 Aug 2022
Proforma of Allotment letterFile: DRAFT OF AGREEMENT TO SALE-74 - Final 06-08-22.pdf16 Aug 2022
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Bank.pdf10 Aug 2022
Building plan approvalFile: 7 Plan.pdf9 Aug 2022
Building plan approvalFile: 6 GF Plan.pdf9 Aug 2022
Layout approvalFile: 5 Layout.pdf9 Aug 2022
Copy of Layout Approval (in case of layout)File: 5 Layout.pdf9 Aug 2022
Building Plan Approval / NA Order for plotted developmentFile: 7 Plan.pdf9 Aug 2022
Building Plan Approval / NA Order for plotted developmentFile: 6 GF Plan.pdf9 Aug 2022
Commencement Certificates / NA Order for plotted developmentFile: 8 Commencement Certificates.pdf9 Aug 2022
Declaration about Commencement CertificateFile: 10 Declaration about Commencement Certificate.pdf9 Aug 2022
Declaration in FORM BFile: 17 Affidavit Cum Declaration Form B_compressed.pdf9 Aug 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 18 Architect's Certificate_compressed.pdf9 Aug 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 22 Engineer's Certificate Form - 2_compressed.pdf9 Aug 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: 16 Engineer Certificate for Quality Assurance.pdf9 Aug 2022
Disclosure of sold/ booked inventoryFile: 12 Disclosure of sold Booked Invertory.pdf9 Aug 2022
Details of encumbrances concerned to FinanceFile: 20 Details of Encumbrances concern to Finance.pdf4 Aug 2022

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
Gandharv ExcellenceG No 155 156 3 Borhadewadi Moshi184CompletedJun 2020Jun 2020

Keep Gandharv Pearl Project I on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Dighi

2 kmGandharv Pearl Project ICompleted 23Lapsed / revoked 13Other 9Dot size: filed unitsN

Filed coordinates, straight-line distance. 45 registered projects within 2 km.

Builder: Vinayak Pandharinath Bhongale

Vinayak Pandharinath Bhongale has 13 registrations on MahaRERA, including Gandharva Excellence Project II and Gandharva Nagari Phase II, Project II, G-12. Its filings disclose 6 earlier MahaRERA projects: declares 6 of 6 past projects completed on time. Read the full track record.

Frequently asked questions

What are my rights if Gandharv Pearl Project I is delayed beyond 30 Jul 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Gandharv Pearl Project I?

The registered promoter entity is Vinayak Pandharinath Bhongale, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Gandharv Pearl Project I?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Gandharv Pearl Project I?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Gandharv Pearl Project I?

The professionals named in the filing: Architect: A Square Architects Through Atul Ranpise; Engineer: Abhijit Panchal; Chartered Accountant: P B Phapale. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Gandharv Pearl Project I?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Gandharv Pearl Project I. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Gandharv Pearl Project I to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.