Registered No litigation declared Residential / Group Housing project

Gandharv Marigold RH 7 to 12

By Yogesh Properties throu Prop Vijaya Vinayak Bhongale

RG-MH-58432 · RERA P52100055657 · Last updated on MahaRERA portal: 23 Jul 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Jun 2027Possession promisedmoved 12 months from the original
34 of 66Construction stages doneacross 6 buildings; furthest along: Internal walls, 80%
3 of 6Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 68 documents Report an error

Gandharv Marigold RH 7 to 12 is a Residential / Group Housing project by Yogesh Properties throu Prop Vijaya Vinayak Bhongale in Pune, Maharashtra, registered with MahaRERA as P52100055657 on 5 Apr 2024. Possession is promised by 30 Jun 2027. The completion date has moved by 12 months from the original filing. 3 of the 6 units on this registration are recorded sold or booked, and 34 of 66 construction stages are filed complete.

At a glance

Project

  • NameGandharv Marigold RH 7 to 12
  • TypeResidential / Group Housing
  • Location
    • Bhosari Alandi Road
    • Bhosari
    • Haveli
    • Pune
    • 411039
  • Pincode411039
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100055657
  • ReraGenie IDRG-MH-58432

Builder

  • NameYogesh Properties throu Prop Vijaya Vinayak Bhongale
  • Entity typeIndividual
  • Other registrations3 more →

Key dates

this monthRegisteredApr 2024First promiseJun 2026Revised toJun 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on5 Apr 2024
  • Promised completion30 Jun 2027
  • Revised completionRevised to 30 Jun 2027 (originally 30 Jun 2026)
  • Buildings6 building records
  • Documents filed68 files

Current status

50%3 of 6 units booked
58.0%Work done, per cost certificate

Figures as on 23 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
RH 7NA33101
RH 8NA33101
RH 9NA33101
RH 10NA33101
RH 11NA22101
RH 12NA22101

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building6

As on 23 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

34 of 66 construction stages are filed complete across 6 buildings. The stage furthest along is Internal walls, at 80%.

RH 765%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises80%
Sanitary Fittings within the flats / premises60%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.80%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
RH 865%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises80%
Sanitary Fittings within the flats / premises60%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.80%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
RH 965%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises80%
Sanitary Fittings within the flats / premises60%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.80%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
RH 1067%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises80%
Sanitary Fittings within the flats / premises60%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
RH 1169%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises60%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
RH 1267%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises60%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.80%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 23 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingNoNot applicable
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed17

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots17
Open Space17
BuildingOpen SpaceTotal
RH 722
RH 833
RH 933
RH 1033
RH 1133
RH 1233

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area3,902 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on15 Jul 2025

Approvals and building plan

Sanctioning authorityPimpri Chinchwad Muncipal Corporation
Permissible FSI776.3
Proposed, not sanctioned776 sq m
Buildings approved6
Buildings sanctioned6

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchS No 46 Somshank Chembers Pune Satara Road Pune 411009
Estimated costRs 3.40 cr
Cost incurredRs 1.97 cr
Work done57.99%
BuildingWingEstimatedIncurred
-NARs 65.08 lakhRs 50.97 lakh
RH 7NARs 49.90 lakhRs 26.54 lakh
RH 8NARs 49.90 lakhRs 26.54 lakh
RH 9NARs 49.90 lakhRs 26.54 lakh
RH 10NARs 49.90 lakhRs 26.54 lakh
RH 11NARs 37.65 lakhRs 20.02 lakh
RH 12NARs 37.65 lakhRs 20.02 lakh

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectBhagat Patil Associates
ArchitectA SQUARE ARCHITECTS
EngineerVijay Kothalkar
EngineerGanesh Junawane
Chartered AccountantP B Phapale & Associates
Chartered AccountantVINOD S. TOSHNIWAL & ASSOCIATES
PartnerRole in project
Yogesh Properties throu Prop Vijaya Vinayak Bhongale-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA25052621087Jun 2026 → Jun 2027

Reason as filed by the promoterThe project completion has been delayed due to circumstances beyond the control of the promoter. The project was adversely affected by delays in statutory approvals, disruption in availability of labor and construction materials, and interruptions caused by external factors. In addition, unforeseen administrative and operational challenges impacted the planned construction schedule. Despite these difficulties, the promoter has continued construction activities and remains fully committed to completing the project at the earliest. The extension is sought to ensure timely completion with require

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 6 Feb 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 6 Feb 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 6 Feb 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 27 Feb 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Jun 2027

Documents filed68

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Architect Certificate - RH 7 to 12 Q1.pdf23 Jul 2026
Withdrawal Update Form 2File: Engineer Certificate RH 7 to 12 Q1.pdf23 Jul 2026
Withdrawal Update Form 3File: CA Certificate RH 7 to 12 Q1.pdf23 Jul 2026
Withdrawal Update Form 1File: Architect Certificate RH 7 to 12 Q4.pdf22 May 2026
Withdrawal Update Form 2File: Engineer Certificate - RH 7 to 12 Q4.pdf22 May 2026
Withdrawal Update Form 3File: CA Certificate RH 7 to 12 Jan-March.pdf22 May 2026
Form 2A (FY 2025-2026)File: Quality Assurance Certificate - RH 7 to 12 - 31-03-2026.pdf11 May 2026
Form 2A (FY 2024-2025)File: Quality Assurance Certificate - RH 7 to 12 - 31-03-2025.pdf13 Mar 2026
Withdrawal Update Form 1File: Architects Certificate RH 7 To 12.pdf29 Jan 2026
Withdrawal Update Form 2File: Engineer Certificate RH 7 To 12.pdf29 Jan 2026
Withdrawal Update Form 3File: CA Certificate RH 7 to 12.pdf29 Jan 2026
Form 5 (FY 2024-2025)File: Form 5 GMG RH 7-12.pdf28 Nov 2025
Withdrawal Update Form 1File: Architect Certificate RH 7 to 12.pdf1 Nov 2025
Withdrawal Update Form 2File: Engineer Certificate RH 7 to 12.pdf1 Nov 2025
Withdrawal Update Form 3File: CA Certificate Marigold RH 7 to 12.pdf1 Nov 2025
Withdrawal Update Form 1File: Architect Certificate RH 7 to 12.pdf22 Aug 2025
Withdrawal Update Form 2File: Engineer Certificate RH 7 to 12.pdf22 Aug 2025
Withdrawal Update Form 3File: CA Certificate RH 7 to 12.pdf22 Aug 2025
Form 1File: Architecht's Certificate_Gandharva Marigold_RH 7 to 12.pdf1 Aug 2025
Form 2File: Engineer Certificate RH 7 to 12.pdf1 Aug 2025
Form 3File: CA Certificate RH 7 to 12.pdf1 Aug 2025
Disclosure of Sold and Booked InventoryFile: Sold Book RH 7 to 12.pdf1 Aug 2025
OthersFile: Quality Assurance RH 7 to 12.pdf1 Aug 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate RH 7 to 12.pdf28 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate RH 7 to 12.pdf28 Apr 2025
Disclosure of sold/ booked inventoryFile: Sold Book RH 7 to 12.pdf28 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Quality Assurance RH 7 to 12.pdf28 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate RH 7 to 12.pdf25 Jan 2025
Disclosure of sold/ booked inventoryFile: Sold Book RH 7 to 12.pdf25 Jan 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Quality Assurance RH 7 to 12.pdf25 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate RH 7 to 12.pdf25 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate RH 7 to12.pdf25 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate RH 7 to 12.pdf25 Oct 2024
Disclosure of sold/ booked inventoryFile: Sold Book RH 7 to 12.pdf25 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Quality A Certificate RH 7 to 12.pdf25 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect's Certificate.pdf19 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer's Certificate.pdf19 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Quality Assurance.pdf19 Jul 2024
Disclosure of sold/ booked inventoryFile: Sold_Booked.pdf19 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate.pdf19 Jul 2024
Proforma of Agreement for saleFile: DRAFT OF AGREEMENT TO SALE RH 7 to 12.pdf29 Feb 2024
Deviation Report with respect to model copy of AgreementFile: Declaration Model Copy of Aggrement.pdf29 Feb 2024
Other - TechnicalFile: Plinth Cheking Appendix F from PCMC.pdf29 Feb 2024
Commencement Certificates / NA Order for plotted developmentFile: Plinth Cheking Appendix F from PCMC.pdf27 Feb 2024
Other - TechnicalFile: Declaration cum - undertaking RH 7 to 12.pdf27 Feb 2024
Other - LegalFile: Sale Deed_3626_2008.pdf22 Feb 2024
Layout approvalFile: Highlighted Sanction Layout RH 7-12.pdf6 Feb 2024
Building plan approvalFile: 2 BHK RH Sheet 8 (1).pdf6 Feb 2024
Building plan approvalFile: 3 BHK RH Sheet 7 (1).pdf6 Feb 2024
PAN CardFile: Vijaya Bhongale (PAN).pdf6 Feb 2024
Copy of the legal title reportFile: Search Report FINAL1.pdf6 Feb 2024
Details of encumbrances concerned to FinanceFile: Concern to Finance and Legal.pdf6 Feb 2024
Details of encumbrances concerned to LegalFile: Concern to Finance and Legal.pdf6 Feb 2024
Copy of Layout Approval (in case of layout)File: Highlighted Sanction Layout RH 7-12.pdf6 Feb 2024
Building Plan Approval / NA Order for plotted developmentFile: 2 BHK RH Sheet 8 (1).pdf6 Feb 2024
Building Plan Approval / NA Order for plotted developmentFile: 3 BHK RH Sheet 7 (1).pdf6 Feb 2024
Commencement Certificates / NA Order for plotted developmentFile: Commecement Certificate.pdf6 Feb 2024
Commencement Certificates / NA Order for plotted developmentFile: NA Order_compressed.pdf6 Feb 2024
Declaration about Commencement CertificateFile: Declaration About Commencement Certificate (2).pdf6 Feb 2024
Declaration in FORM BFile: Affidavit cum Declaration (3).pdf6 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf6 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate New.pdf6 Feb 2024
CERSAI detailsFile: Undertaking For No Cersai Report (2).pdf6 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate RH 7 to 12.pdf6 Feb 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest in order Real Estate Organization NEW.pdf6 Feb 2024
Proforma of Allotment letterFile: Model Form of Allotement Letter.pdf6 Feb 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Declaration Bank Account for Real Estate Projects.pdf6 Feb 2024
Deviation Report with respect to Allotment letterFile: Declaration Report With Respect to Allotement Letter.pdf6 Feb 2024

How this compares with Pune

50%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one moved by 12 months
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Gandharv Marigold RH 7 to 12 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Bhosari13,700+ in Pune

2 kmGandharv Marigold RH 7 tCompleted 11Lapsed / revoked 5Other 13Dot size: filed unitsN

Filed coordinates, straight-line distance. 29 registered projects within 2 km.

Builder: Yogesh Properties throu Prop Vijaya Vinayak Bhongale

Yogesh Properties throu Prop Vijaya Vinayak Bhongale has 4 registrations on MahaRERA, including Gandharv Marigold RH 13 to 18 and Gandharv Marigold Building A. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Gandharv Marigold RH 7 to 12 is delayed beyond 30 Jun 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Gandharv Marigold RH 7 to 12?

The registered promoter entity is Yogesh Properties throu Prop Vijaya Vinayak Bhongale, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Gandharv Marigold RH 7 to 12?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Gandharv Marigold RH 7 to 12?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Gandharv Marigold RH 7 to 12?

The professionals named in the filing: Architect: Bhagat Patil Associates; Architect: A SQUARE ARCHITECTS; Engineer: Vijay Kothalkar; Engineer: Ganesh Junawane; Chartered Accountant: P B Phapale & Associates; Chartered Accountant: VINOD S. TOSHNIWAL & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Gandharv Marigold RH 7 to 12?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Gandharv Marigold RH 7 to 12. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Gandharv Marigold RH 7 to 12 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.