Registered No litigation declared Residential / Group Housing project

Diamond hills

By A Square Properties

RG-MH-04679 · RERA P52100020110 · Last updated on MahaRERA portal: 27 Feb 2026

Source: official MahaRERA filing

Red flags

  • 1 complaint at MahaRERA
  • Completion date moved by 55 months
  • 1 extension taken

Clear

  • No litigation declared
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedmoved 55 months from the original
2 of 11Construction stages donefurthest along: Slabs of Super Structure, 65%
48 of 56Units unsoldnot recorded sold or booked
1Complaints at MahaRERAon this registration
Jump to the 119 documents Report an error

Diamond hills is a Residential / Group Housing project by A Square Properties in Pune, Maharashtra, registered with MahaRERA as P52100020110 on 28 Mar 2019. Possession is promised by 31 Dec 2026. The completion date has moved by 55 months from the original filing. 8 of the 56 units on this registration are recorded sold or booked, and 2 of 11 construction stages are filed complete. 1 complaint is on record with the regulator.

At a glance

Project

  • NameDiamond hills
  • TypeResidential / Group Housing
  • Location
    • Near Sant Sai School
    • Adinathnagar
    • Bhosari
    • Haveli
    • Pune
    • 411039
  • Pincode411039
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100020110
  • ReraGenie IDRG-MH-04679

Builder

  • NameA Square Properties
  • Entity typePartnership
  • PartnersShivaji Sarjerao Shinde, Krishankumar Birbal Meena, Mangilal Venaramji Mangliya

Key dates

this monthRegisteredMar 2019First promiseMay 2022Revised toDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on28 Mar 2019
  • Promised completion31 Dec 2026
  • Revised completionRevised to 31 Dec 2026 (originally 30 May 2022)
  • Buildings1 building record
  • Documents filed119 files

Current status

14%8 of 56 units booked
31.0%Work done, per cost certificate

Figures as on 27 Feb 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Diamond hills Building ANA5556056

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 27 Feb 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

2 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 65%.

Diamond hills Building A: 26% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure65%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises25%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 27 Feb 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed15

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots15
Closed/Covered13
Open Space2

Land and ownership2

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,340 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on9 Oct 2025
LandownerVillageDistrict
Gurudayal Mohansing Saini and Balkrishna SainiPimpri Chinchawad (M Corp.)Pune
Balvirkaur Prabhudayal Gurjar and Vikram GurjarPimpri Chinchawad (M Corp.)Pune

Approvals and building plan

Sanctioning authorityPimpri Chinchwad Municipal Corporation
Permissible FSI900.29
Proposed, not sanctioned900 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchVishrantwadi Pune 411001
Estimated costRs 6.70 cr
Cost incurredRs 2.08 cr
Work done31.01%
BuildingWingEstimatedIncurred
Diamond hills Building ANARs 6.60 crRs 2.08 cr
-NARs 9.93 lakh-

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAppasaheb Gaikwad and Atul Ranpise
EngineerSHRIKANT AMBURE
Chartered AccountantVINIT ACHHA
Chartered AccountantSHUBHAM BORA
Chartered AccountantVINOD N NIKAM
PartnerRole in project
A Square Properties-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100024714May 2022 → Dec 2026

Reason as filed by the promoter1. Demise of Landowner and Property Dispute - Following the unfortunate passing of the landowner, there have been some legal disputes concerning the ownership and management of the premises. These matters are currently being resolved, but they have caused delays in our ability to proceed as planned. 2. Financial Difficulties and Retirement of Partner - One of our partners has faced financial difficulties and has decided to retire from the partnership. We are in the process of restructuring the partnership and addressing the financial impact this has caused. 3. Revision of Sanctioned Plan and C

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC12600022Balvir Kaur Prabhudayal GujarA Square Properties02/01/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 7 Mar 2019
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 7 Mar 2019
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 7 Mar 2019
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 7 Mar 2019Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed119

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 119 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: FORM 1.pdf27 Feb 2026
Withdrawal Update Form 2File: FORM 2.pdf27 Feb 2026
Withdrawal Update Form 3File: FORM 3.pdf27 Feb 2026
Form 1File: FORM 1.pdf18 Oct 2025
Form 2File: FORM 2.pdf18 Oct 2025
Form 3File: form 3.pdf18 Oct 2025
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD.pdf18 Oct 2025
Form 1File: FORM 1.pdf18 Oct 2025
Form 2File: FORM 2.pdf18 Oct 2025
Form 3File: FORM 3.pdf18 Oct 2025
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD.pdf18 Oct 2025
Form 1File: FORM 1.pdf10 Sep 2025
Form 2File: FORM 2.pdf10 Sep 2025
Form 3File: FORM 3.pdf10 Sep 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory.pdf10 Sep 2025
Declaration about Commencement CertificateFile: bhosari format D.pdf29 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: march 2019.pdf29 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: june 2019.pdf29 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: sept 2019.pdf29 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: dec 2019.pdf29 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: march 2020.pdf29 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: June 2020.pdf29 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Sep 2020.pdf29 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Dec 2020.pdf29 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: march 2021.pdf29 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: june 2021.pdf29 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: dec 2021.pdf29 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: march 2022.pdf29 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: june 2022.pdf29 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: sept 2022.pdf29 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Dec 2022.pdf29 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: march 2023.pdf29 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: June 2023.pdf29 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: sept 2023.pdf29 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 03 03 2019 Diamond Hills.pdf29 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 03 06 2019 Diamond HILLS.pdf29 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 03 09 2019 Diamond Hills.pdf29 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 03 12 2019 Diamond hills.pdf29 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 03 12 2019 Diamond hills.pdf29 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 03 03 2020 Diamond Hills.pdf29 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 03 06 2020 Diamond Hills.pdf29 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 03 09 2020 Diamond Hills.pdf29 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 03 12 2020 Diamond Hills.pdf29 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 03 03 2021 Diamond Hills.pdf29 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 03 06 2021 Diamond Hills.pdf29 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 03 09 2021 Diamond Hills.pdf29 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 03 12 2021 Diamond Hills.pdf29 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 03 03 2022 Diamond Hills.pdf29 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 03 06 2022 Diamond Hills.pdf29 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 03 09 2022 Diamond Hills.pdf29 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 03 12 2022 Diamond Hills.pdf29 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 03 03 2023 Diamond Hills.pdf29 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 03 06 2023 Diamond Hills.pdf29 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 03 09 2023 Diamond Hills.pdf29 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 03 12 2023 Diamond Hills.pdf29 Feb 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: ANNUAL REPORT - 2019 TO 2020.pdf29 Feb 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: ANNUAL REPORT 2021 TO 2022.pdf29 Feb 2024
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD Sep 2019.pdf29 Feb 2024
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD Dec 2019.pdf29 Feb 2024
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD Mar 2020.pdf29 Feb 2024
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD June 2020.pdf29 Feb 2024
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD Sep 2020.pdf29 Feb 2024
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD Dec 2020.pdf29 Feb 2024
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD Dec 2020.pdf29 Feb 2024
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD Mar 2021.pdf29 Feb 2024
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD June 2021.pdf29 Feb 2024
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD Sep 2021.pdf29 Feb 2024
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD Dec 2021.pdf29 Feb 2024
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD Mar 2022.pdf29 Feb 2024
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD June 2022.pdf29 Feb 2024
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD Sep 2022.pdf29 Feb 2024
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD Sep 2023.pdf29 Feb 2024
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD Dec 2023.pdf29 Feb 2024
Certificates of CA (Form 3)File: CA CERTIFICATE FORM- 3 DEC 2019.pdf29 Feb 2024
Certificates of CA (Form 3)File: CA CERTIFICATE FORM -3 MARCH 19-20.pdf29 Feb 2024
Certificates of CA (Form 3)File: CA CERTIFICATE FORM -3 JUNE 19-20_4_11zon.pdf29 Feb 2024
Certificates of CA (Form 3)File: CA CERTIFICATE FORM-3 SEP 2020.pdf29 Feb 2024
Certificates of CA (Form 3)File: CA CERTIFICATE FORM -3 DEC 2020.pdf29 Feb 2024
Certificates of CA (Form 3)File: CA CERTIFICATE FORM - 3 JAN 20-21.pdf29 Feb 2024
Certificates of CA (Form 3)File: CA CERTIFICATE FORM-3 JUN 2021.pdf29 Feb 2024

How this compares with Pune

14%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one moved by 55 months
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Diamond hills on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Adinathnagar13,700+ in Pune

2 kmDiamond hillsCompleted 15Lapsed / revoked 7Other 11Dot size: filed unitsN

Filed coordinates, straight-line distance. 33 registered projects within 2 km.

Builder: A Square Properties

A Square Properties has 1 registration on MahaRERA, including Diamond hills. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Diamond hills is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Diamond hills?

The registered promoter entity is A Square Properties, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Diamond hills?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Diamond hills?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Diamond hills?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Diamond hills?

The professionals named in the filing: Architect: Appasaheb Gaikwad and Atul Ranpise; Engineer: SHRIKANT AMBURE; Chartered Accountant: VINIT ACHHA; Chartered Accountant: SHUBHAM BORA; Chartered Accountant: VINOD N NIKAM. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Diamond hills?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Diamond hills. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Diamond hills to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.