Registered No litigation declared Residential / Group Housing project

Gandharv Marigold Building A

By Yogesh Properties throu Prop Vijaya Vinayak Bhongale

RG-MH-68814 · RERA P52100055514 · Last updated on MahaRERA portal: 13 May 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 3 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Jan 2027Possession promisedno revision filed
4 of 11Construction stages donefurthest along: Slabs of Super Structure, 90%
17 of 28Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 82 documents Report an error

Gandharv Marigold Building A is a Residential / Group Housing project by Yogesh Properties throu Prop Vijaya Vinayak Bhongale in Pune, Maharashtra, registered with MahaRERA as P52100055514 on 2 Apr 2024. Possession is promised by 30 Jan 2027. 11 of the 28 units on this registration are recorded sold or booked, and 4 of 11 construction stages are filed complete.

At a glance

Project

  • NameGandharv Marigold Building A
  • TypeResidential / Group Housing
  • Location
    • Bhosari
    • Haveli
    • Pune
    • 411039
  • Pincode411039
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100055514
  • ReraGenie IDRG-MH-68814

Builder

  • NameYogesh Properties throu Prop Vijaya Vinayak Bhongale
  • Entity typeIndividual
  • Other registrations3 more →

Key dates

this monthRegisteredApr 2024PromisedJan 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on2 Apr 2024
  • Promised completion30 Jan 2027
  • Revised completionNone
  • Buildings1 building record
  • Documents filed82 files

Current status

39%11 of 28 units booked
53.0%Work done, per cost certificate

Figures as on 13 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Gandharv Marigold Building ANA8728028

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 13 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 90%.

Gandharv Marigold Building A: 54% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure90%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises50%
Sanitary Fittings within the flats / premises20%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks30%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 13 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingNoNot applicable
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed89

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots89
Closed/Covered15
Open Space74

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area3,902 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on19 Jul 2025

Approvals and building plan

Sanctioning authorityPimpri Chinchwad Muncipal Corporation
Permissible FSI2306.6
Proposed, not sanctioned2,307 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchS No 46 Somshank Chembers Pune Satara Road Pune
Estimated costRs 6.61 cr
Cost incurredRs 3.51 cr
Work done53.01%
BuildingWingEstimatedIncurred
Gandharv Marigold Building ANARs 5.35 crRs 2.52 cr
-NARs 1.27 crRs 98.63 lakh

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectBhagat Patil Associates
ArchitectA SQUARE ARCHITECT
EngineerVijay Kothalkar
EngineerGanesh Junawane
Chartered AccountantP B Phapale
Chartered AccountantVINOD S TOSHNIWAL & ASSOCIATES
PartnerRole in project
Yogesh Properties throu Prop Vijaya Vinayak Bhongale-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 27 Jan 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 18 Dec 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 18 Dec 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 18 Dec 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Jan 2027

Documents filed82

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 82 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Architect Certificate -Building A- Q4.pdf13 May 2026
Withdrawal Update Form 2File: Engineer Certificate - Building A Q4.pdf13 May 2026
Withdrawal Update Form 3File: CA Certificate Building A Jan-March.pdf13 May 2026
Withdrawal Update Form 1File: Architect Certifcate Building A.pdf30 Jan 2026
Withdrawal Update Form 2File: Engineer Certificate Building A.pdf30 Jan 2026
Withdrawal Update Form 3File: CA Certificate Building A.pdf30 Jan 2026
Layout approvalFile: Sheet 1 - 26-2025 dt 01-10-2025.pdf18 Dec 2025
Building plan approvalFile: Sheet 2 Building A Floor Plan.pdf18 Dec 2025
Building plan approvalFile: Sheet 3 Building A Elevation.pdf18 Dec 2025
Building plan approvalFile: Revised Commencement Certificate 26-2025.pdf18 Dec 2025
Form 5 (FY 2024-2025)File: Form 5 GMG A Building.pdf28 Nov 2025
Withdrawal Update Form 1File: Architect Certificate Building A.pdf1 Nov 2025
Withdrawal Update Form 2File: Engineer Certificate Building A.pdf1 Nov 2025
Withdrawal Update Form 3File: CA Certificate Marigold Building A.pdf1 Nov 2025
Withdrawal Update Form 1File: Architect Certficate Buidling A.pdf22 Aug 2025
Withdrawal Update Form 2File: Engineer Certificate Building A.pdf22 Aug 2025
Withdrawal Update Form 3File: CA Certificate Building A.pdf22 Aug 2025
Form 1File: Architect Certificate- Buidling-A.pdf4 Aug 2025
Form 2File: Engineer Certificate Building A.pdf4 Aug 2025
Form 3File: CA Certificate Building A.pdf4 Aug 2025
Disclosure of Sold and Booked InventoryFile: Sold Book Building A.pdf4 Aug 2025
OthersFile: Quality Assurance Bulding A.pdf4 Aug 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Building A.pdf28 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate - Building A.pdf28 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate Building A.pdf28 Apr 2025
Disclosure of sold/ booked inventoryFile: Sold Book Building A.pdf28 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Quality Assurance Bulding A.pdf28 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Building A.pdf25 Jan 2025
Disclosure of sold/ booked inventoryFile: Sold Book Building A.pdf25 Jan 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Quality Assurance Building A.pdf25 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Building A.pdf26 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Building A.pdf26 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate Building A.pdf26 Oct 2024
Disclosure of sold/ booked inventoryFile: Sold Book Building A.pdf26 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Quality A Certificate Building A.pdf26 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect's Certificate.pdf19 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Egnineer's Certificate.pdf19 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Quality Assurance.pdf19 Jul 2024
Disclosure of sold/ booked inventoryFile: Sold_Booked.pdf19 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate.pdf19 Jul 2024
Commencement Certificates / NA Order for plotted developmentFile: Declaration Regarding No Plinth Certificate.pdf22 Mar 2024
Layout approvalFile: Declaration regarding Plot Area New.pdf21 Mar 2024
Copy of Layout Approval (in case of layout)File: Declaration regarding Plot Area New.pdf21 Mar 2024
Layout approvalFile: Highligted Layout GMarigold Bld A.pdf12 Mar 2024
Copy of Layout Approval (in case of layout)File: Highligted Layout GMarigold Bld A.pdf12 Mar 2024
Deviation Report with respect to model copy of AgreementFile: FINAL Deviation Report.pdf7 Mar 2024
Proforma of Agreement for saleFile: Agreement Draft Gandharv Marigold Building A Highligted Deviation Points.pdf6 Mar 2024
Other - LegalFile: Sale Deed_3626_2008.pdf1 Mar 2024
Other - LegalFile: Court Order 561_14.pdf1 Mar 2024
Other - LegalFile: SamatiPatra 8592_2021-1-30.pdf1 Mar 2024
Other - LegalFile: SamatiPatra 8592_2021-31-60.pdf1 Mar 2024
Other - LegalFile: SamatiPatra 8592_2021-61-90.pdf1 Mar 2024
Other - LegalFile: SamatiPatra 8592_2021-91-120.pdf1 Mar 2024
Other - LegalFile: SamatiPatra 8592_2021-121-150.pdf1 Mar 2024
Other - LegalFile: SamatiPatra 8592_2021-151-176.pdf1 Mar 2024
Other - TechnicalFile: Declaration cum-undertaking Bld A.pdf1 Mar 2024
Other - TechnicalFile: Plinth Cheking Appendix F from PCMC.pdf1 Mar 2024
CERSAI detailsFile: Undertaking for No Cersai Report New.pdf9 Feb 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Interest in other Real Estate Organization New.pdf9 Feb 2024
Declaration about Commencement CertificateFile: Plinth Cheking Appendix F from PCMC.pdf2 Feb 2024
Declaration about Commencement CertificateFile: Declaration About Commencement Certificate FINAL.pdf29 Jan 2024
Proforma of Allotment letterFile: Annexure '1'- Model Form of Allotment Letter Highlited area.pdf28 Jan 2024
Copy of the legal title reportFile: Search Report FINAL1.pdf27 Jan 2024
Details of encumbrances concerned to FinanceFile: Details Concern to Finance and concern to Legal.pdf27 Jan 2024
Details of encumbrances concerned to LegalFile: Details Concern to Finance and concern to Legal.pdf27 Jan 2024
Building plan approvalFile: Building A Elevation - Sheet 5.pdf25 Jan 2024
Building plan approvalFile: Parking Layout - Sheet 2.pdf25 Jan 2024
Building plan approvalFile: Building A Floor Plan Sheet 3 (1).pdf25 Jan 2024
Building plan approvalFile: Building A Typical Floor Sheet 4 (1).pdf25 Jan 2024
Building Plan Approval / NA Order for plotted developmentFile: Parking Layout - Sheet 2.pdf25 Jan 2024
Building Plan Approval / NA Order for plotted developmentFile: Building A Floor Plan Sheet 3 (1).pdf25 Jan 2024
Building Plan Approval / NA Order for plotted developmentFile: Building A Typical Floor Sheet 4 (1).pdf25 Jan 2024
Building Plan Approval / NA Order for plotted developmentFile: Building A Elevation - Sheet 5.pdf25 Jan 2024
Commencement Certificates / NA Order for plotted developmentFile: Commecement Certificate.pdf23 Jan 2024
Commencement Certificates / NA Order for plotted developmentFile: NA Order.pdf23 Jan 2024
Declaration in FORM BFile: Affidavit Cum Declaration (2).pdf23 Jan 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Declaration About Separate Bank Account.pdf23 Jan 2024
Deviation Report with respect to Allotment letterFile: Deviation Report for Allotment Letter.pdf23 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Marigold Buidling A.pdf22 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate Marigold Building A.pdf22 Jan 2024

How this compares with Pune

39%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Gandharv Marigold Building A on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Bhosari13,700+ in Pune

2 kmGandharv Marigold BuildiCompleted 11Lapsed / revoked 5Other 13Dot size: filed unitsN

Filed coordinates, straight-line distance. 29 registered projects within 2 km.

Builder: Yogesh Properties throu Prop Vijaya Vinayak Bhongale

Yogesh Properties throu Prop Vijaya Vinayak Bhongale has 4 registrations on MahaRERA, including Gandharv Marigold RH 13 to 18 and Gandharv Marigold Building A. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Gandharv Marigold Building A is delayed beyond 30 Jan 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Gandharv Marigold Building A?

The registered promoter entity is Yogesh Properties throu Prop Vijaya Vinayak Bhongale, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Gandharv Marigold Building A?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Gandharv Marigold Building A?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Gandharv Marigold Building A?

The professionals named in the filing: Architect: Bhagat Patil Associates; Architect: A SQUARE ARCHITECT; Engineer: Vijay Kothalkar; Engineer: Ganesh Junawane; Chartered Accountant: P B Phapale; Chartered Accountant: VINOD S TOSHNIWAL & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Gandharv Marigold Building A?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Gandharv Marigold Building A. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Gandharv Marigold Building A to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.