ReraGenieLog inGet a buyer report

Home / Browse projects / Thane, Maharashtra / Gami Terra

Completed No litigation declared Others project

Gami Terra

By LAL GEBI INFRA PRIVATE LIMITED

RG-MH-52384 · RERA P51700047776 · Last updated on MahaRERA portal: 7 Dec 2024

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 6 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedregistration recorded completed
11 of 11Construction stages doneevery applicable stage filed complete
0Complaints at MahaRERAon this registration
Jump to the 63 documents Report an error

Gami Terra is a Others project by LAL GEBI INFRA PRIVATE LIMITED in Thane, Maharashtra, registered with MahaRERA as P51700047776 on 28 Nov 2022. The registration is recorded completed; possession was promised by 31 Dec 2026.

At a glance

Project

  • NameGami Terra
  • TypeOthers
  • Location
    • SECTOR 06
    • SANPADA NAVI MUMBAI
    • Navi Mumbai (M Corp.)
    • Thane
    • 400705
  • Pincode400705
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700047776
  • ReraGenie IDRG-MH-52384

Builder

  • NameLAL GEBI INFRA PRIVATE LIMITED
  • Entity typeCompany
  • CINU45309MH2020PTC345469
  • GSTIN27AAECL3308B1Z0
  • CIN and GSTIN are from this promoter's other MahaRERA registrations. This project's own filing does not repeat them.
  • DirectorsAMBALA GAMI, AMBALAL GAMI, AMBALAL GAMI
  • Other registrations6 more →
  • Completed2 of 7
  • Declared earlier projects4 →

Key dates

this monthRegisteredNov 2022PromisedDec 2026Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on28 Nov 2022
  • Promised completion31 Dec 2026
  • Revised completionNone
  • Buildings1 building record
  • Documents filed63 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Gami TerraNA280000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 7 Dec 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

11 of 11 construction stages are filed complete.

Gami Terra: 100% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 7 Dec 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes100%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed81

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots81
Closed/Covered81

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,852 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI8953.79
Proposed, not sanctioned8,954 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchVASHI

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectDIMENSION ARCHITECT PRIVATE LIMITED
EngineerA G GOKHALE & ASSOCIATES
Chartered AccountantNEHALI & CO
PartnerRole in project
LAL GEBI INFRA PRIVATE LIMITED-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 16 Mar 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 7 Dec 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 18 Aug 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 7 Dec 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 22 Nov 2024

Documents filed63

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form-5 Terra 23-24.pdf7 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf5 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3.pdf5 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2.pdf5 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: SIGNED Form-5 Terra 23-24.pdf30 Nov 2024
Architect’s Certificate on Completion of Project (Form 4)File: Form 4 .pdf22 Nov 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC GAMI TERRA.pdf22 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2.pdf17 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf15 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3.pdf15 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 Engineer Certificate (2).pdf20 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf15 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3.pdf15 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate-Terra -19-01-24 (1).pdf20 Jan 2024
Layout approvalFile: Plans _1-2.pdf7 Dec 2023
Layout approvalFile: Plans _3-end.pdf7 Dec 2023
Copy of Layout Approval (in case of layout)File: Plans _1-2.pdf7 Dec 2023
Copy of Layout Approval (in case of layout)File: Plans _3-end.pdf7 Dec 2023
Commencement Certificates / NA Order for plotted developmentFile: CC Letter 28-11-2023.pdf7 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 (From Architect) dt30 09 2023.pdf13 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 Engineer Certificate-Terra -09-10-023.pdf13 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 CA Certificate Terra September 23 (1).pdf13 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: form 5 terra 22-23.pdf10 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: GAMI TERRA FORM 1.pdf28 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: GAMI TERRA FORM 2.pdf28 Jul 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: GAMI TERRA FORM 3.pdf28 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: TERRA FORM 1.pdf24 Apr 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: revised signed CA Certificate Terra Mar 23.pdf24 Apr 2023
Layout approvalFile: Plans 1 and 2.pdf16 Mar 2023
Layout approvalFile: Plans 3 and 4.pdf16 Mar 2023
Copy of the legal title reportFile: Annexure D Title Cerificate NEW.pdf16 Mar 2023
Copy of Layout Approval (in case of layout)File: Plans 1 and 2.pdf16 Mar 2023
Copy of Layout Approval (in case of layout)File: Plans 3 and 4.pdf16 Mar 2023
Commencement Certificates / NA Order for plotted developmentFile: C C TERRA.pdf16 Mar 2023
Proforma of Agreement for saleFile: terra agreement updated FLAT.pdf16 Mar 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 From Architect.pdf30 Jan 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate Terra.pdf30 Jan 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Terra Dec 22.pdf30 Jan 2023
Deviation Report with respect to model copy of AgreementFile: deviation 2_merged_compressed (1).pdf18 Nov 2022
Proforma of Allotment letterFile: ALLOTMENT LETTER gami terra final.pdf5 Nov 2022
Proforma of Agreement for saleFile: agreement terra.pdf5 Nov 2022
Deviation Report with respect to Allotment letterFile: TERRA - DEVIATION FORM ALLOTMENT.pdf5 Nov 2022
CERSAI detailsFile: CERSAI DECLARATION FOR LOAN.pdf8 Oct 2022
Details of encumbrances concerned to LegalFile: no encumbrance legal.pdf19 Aug 2022
Layout approvalFile: Scan 01.pdf18 Aug 2022
Building plan approvalFile: Scan 02.pdf18 Aug 2022
Building plan approvalFile: Scan 03.pdf18 Aug 2022
Building plan approvalFile: Scan 04.pdf18 Aug 2022
Building plan approvalFile: Scan 05.pdf18 Aug 2022
Copy of Layout Approval (in case of layout)File: Scan 01.pdf18 Aug 2022
Building Plan Approval / NA Order for plotted developmentFile: Scan 02.pdf18 Aug 2022
Building Plan Approval / NA Order for plotted developmentFile: Scan 03.pdf18 Aug 2022
Building Plan Approval / NA Order for plotted developmentFile: Scan 04.pdf18 Aug 2022
Building Plan Approval / NA Order for plotted developmentFile: Scan 05.pdf18 Aug 2022
Copy of the legal title reportFile: TITLE REPORT.pdf17 Aug 2022
Details of encumbrances concerned to FinanceFile: 2 encumbrance fianancial.pdf17 Aug 2022
Declaration about Commencement CertificateFile: 1 CC COVERING LETTER.pdf17 Aug 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect form 1.pdf17 Aug 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA form 3 CA Certificate Gami Terra.pdf17 Aug 2022
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: 1 Bank details letter rera.pdf17 Aug 2022
PAN CardFile: Company Pan Card Lal Gebi Infra Pvt Ltd.pdf6 Aug 2022
Commencement Certificates / NA Order for plotted developmentFile: CC 30-06-2022.pdf6 Aug 2022
Declaration in FORM BFile: FORM B.pdf6 Aug 2022

Promoter's earlier projects4

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

4 under way, not due yet
ProjectLocationFlatsRegisteredStatusPromisedDelivered
Gami TelonP51700080035Ghansoli, Thane72Apr 2025OngoingDec 2029Not due yet
Gami MiravaPR1270002600408New Panvel, Raigarh327May 2026OngoingDec 2029Not due yet
Gami AvantP51700079740Vashi, Navi Mumbai, Thane232Mar 2025OngoingDec 2029Not due yet
Gami BiancaP52000051188Dronagiri, Navi Mumbai, Raigarh436Jun 2023OngoingDec 2027Not due yet

How this compares with Thane

24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is completed

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Gami Terra on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near SANPADA NAVI MUMBAI7,600+ in Thane

2 kmGami TerraCompleted 14Lapsed / revoked 7Other 35Dot size: filed unitsN

Filed coordinates, straight-line distance. 56 registered projects within 2 km.

Builder: LAL GEBI INFRA PRIVATE LIMITED

LAL GEBI INFRA PRIVATE LIMITED has 7 registrations on MahaRERA, including GAMI JADE and Gami Terra. Its filings disclose 4 earlier MahaRERA projects, none completed yet. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if Gami Terra is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Gami Terra?

The registered promoter entity is LAL GEBI INFRA PRIVATE LIMITED, a company as per the filing. Its CIN U45309MH2020PTC345469 and GSTIN 27AAECL3308B1Z0 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Gami Terra?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Gami Terra?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Gami Terra?

The professionals named in the filing: Architect: DIMENSION ARCHITECT PRIVATE LIMITED; Engineer: A G GOKHALE & ASSOCIATES; Chartered Accountant: NEHALI & CO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Gami Terra?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Gami Terra. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Gami Terra to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.