ReraGenieLog inGet a buyer report

Home / Browse projects / Thane, Maharashtra / Raheja Lunaris-1 - Callisto

Registered No litigation declared Residential / Group Housing project

Raheja Lunaris-1 - Callisto

By Raheja Universal (Pvt.) Ltd.

RG-MH-18477 · RERA P51700076867 · Last updated on MahaRERA portal: 18 Jun 2026

Source: official MahaRERA filing

Red flags

  • Rs 125.00 crore secured on the land, in favour of Standard Chartered bank

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2030Possession promisedno revision filed
3 of 33Construction stages doneacross 4 buildings; furthest along: Basement (if any), 91%
243 of 598Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 78 documents Report an error

Raheja Lunaris-1 - Callisto is a Residential / Group Housing project by Raheja Universal (Pvt.) Ltd. in Thane, Maharashtra, registered with MahaRERA as P51700076867 on 3 Jul 2024. Possession is promised by 31 Dec 2030. 355 of the 598 units on this registration are recorded sold or booked, and 3 of 33 construction stages are filed complete.

At a glance

Project

  • NameRaheja Lunaris-1 - Callisto
  • TypeResidential / Group Housing
  • Location
    • OFF SION PANVEL HIGHWAY
    • TTC INDUSTRIAL AREA
    • Navi Mumbai (M Corp.)
    • Thane
    • 400705
  • Pincode400705
  • RERA no.P51700076867
  • ReraGenie IDRG-MH-18477

Builder

  • NameRaheja Universal (Pvt.) Ltd.
  • Entity typeCompany
  • DirectorASHISH SURESH RAHEJA
  • Other registrations16 more →
  • Completed2 of 17
  • Declared earlier projects13 →

Key dates

this monthRegisteredJul 2024PromisedDec 2030

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on3 Jul 2024
  • Promised completion31 Dec 2030
  • Revised completionNone
  • Buildings4 building records
  • Documents filed78 files

Current status

59%355 of 598 units booked
16.4%Work done, per cost certificate

Figures as on 18 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Raheja Lunaris -1 - Callisto approved as Raheja Lunaris Wing ANA37321920192
Raheja Lunaris-1 - Callisto approved as Raheja Lunaris Wing BNA37321920192
Raheja Lunaris-1 - Callisto approved as Raheja Lunaris Wing CNA37321920192
Raheja Lunaris-1 Callisto - Shopping WingNA4202222

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building4

As on 18 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

3 of 33 construction stages are filed complete across 4 buildings. The stage furthest along is Basement (if any), at 91%.

Raheja Lunaris -1 - Callisto approved as Raheja Lunaris Wing A20%
ActivityProgress
Excavation100%
Basement (if any)91%
Podiums (if any)29%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Raheja Lunaris-1 - Callisto approved as Raheja Lunaris Wing B16%
ActivityProgress
Excavation100%
Basement (if any)75%
Podiums (if any)4%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Raheja Lunaris-1 - Callisto approved as Raheja Lunaris Wing C14%
ActivityProgress
Excavation100%
Basement (if any)54%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Raheja Lunaris-1 Callisto - Shopping WingNot stated
ActivityProgress
ExcavationNot applicable
Basement (if any)Not applicable
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/PremisesNot applicable
Sanitary Fittings within the flats / premisesNot applicable
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water TanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.Not applicable
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.Not applicable

Progress on shared amenities15

As on 18 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed1361

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots1,361
Closed/Covered1,361
BuildingClosed/CoveredTotal
Raheja Lunaris -1 - Callisto approved as Raheja Lunaris Wing A446446
Raheja Lunaris-1 - Callisto approved as Raheja Lunaris Wing B446446
Raheja Lunaris-1 - Callisto approved as Raheja Lunaris Wing C447447
Raheja Lunaris-1 Callisto - Shopping Wing2222

Land and ownership

A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area32,020 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared present
Charge in favour ofStandard Chartered bank
Secured amountRs 125.00 crore
CERSAI search filedYes
Declared on28 Nov 2025

Approvals and building plan

Sanctioning authorityMaharashtra Industrial Development Corporation
Permissible FSI41148.82
Proposed, not sanctioned41,149 sq m
Buildings approved4
Buildings sanctioned4

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchCRESCENZO BUILDING
Estimated costRs 726.80 cr
Cost incurredRs 119.35 cr
Work done16.42%
BuildingWingEstimatedIncurred
Raheja Lunaris -1 - Callisto approved as Raheja Lunaris Wing ANARs 220.76 crRs 32.55 cr
Raheja Lunaris-1 - Callisto approved as Raheja Lunaris Wing BNARs 220.76 crRs 32.55 cr
Raheja Lunaris-1 - Callisto approved as Raheja Lunaris Wing CNARs 220.76 crRs 32.55 cr
-NARs 64.52 crRs 21.70 cr

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectKAMAL KHEMANI
ArchitectKamal Soni
EngineerMAHESH LALLA
EngineerAvinash Shinde
Chartered AccountantVINIT & ASSOCIATES
Chartered AccountantK. N. Gandhi & Co.
PartnerRole in project
Raheja Universal (Pvt.) Ltd.-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 31 Jan 2025
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 19 Jan 2026
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 31 Jan 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 31 Jan 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2030

Documents filed78

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2025-2026)File: Lunaris 1.pdf18 Jun 2026
Withdrawal Update Form 1File: Form 1 - Lunaris 1 - Callisto.pdf15 May 2026
Withdrawal Update Form 2File: Lunaris - 1.pdf15 May 2026
Withdrawal Update Form 3File: Form 3_Lunaris 1_31 03 2026.pdf15 May 2026
Withdrawal Update Form 1File: Form 1 Luna1Cal 30122025.pdf5 Feb 2026
Withdrawal Update Form 2File: Lunaris 1 31122025.pdf5 Feb 2026
Withdrawal Update Form 3File: Form 3 Lunaris 1 Cal 03022026 04022026.pdf5 Feb 2026
Layout approvalFile: Highligted Pg 1-7.pdf19 Jan 2026
Withdrawal Update Form 1File: Form 1 Lunaris-1 300925.pdf24 Dec 2025
Withdrawal Update Form 2File: Lunaris-1 Form 2 300925.pdf24 Dec 2025
Withdrawal Update Form 3File: Form 3_Lunaris 1_30092025 Revised.pdf24 Dec 2025
Withdrawal Update Form 1File: Form 1 Lunaris-1 300925.pdf28 Nov 2025
Withdrawal Update Form 2File: Lunaris-1 Form 2 300925.pdf28 Nov 2025
Withdrawal Update Form 3File: Form 3 Lunaris 1 300925.pdf28 Nov 2025
Withdrawal Update Form 1File: Form 1 Lunaris-1 300625.pdf27 Nov 2025
Withdrawal Update Form 1File: Form 1 Lunaris-1 300925.pdf27 Nov 2025
Withdrawal Update Form 2File: Form 1 Lunaris-1 300625.pdf27 Nov 2025
Withdrawal Update Form 2File: Lunaris-1 Form 2 300925.pdf27 Nov 2025
Withdrawal Update Form 3File: Form 3 Lunaris 1 300625.pdf27 Nov 2025
Withdrawal Update Form 3File: Form 3 Lunaris 1 300925.pdf27 Nov 2025
Proforma of Allotment letterFile: Lunaris-1- Draft of Allotment Letter.pdf26 Mar 2025
Proforma of Agreement for saleFile: Lunaris-1 Agreement .pdf26 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form -2 Lunaris-1 311224.pdf6 Feb 2025
Copy of Layout Approval (in case of layout)File: Lunaris-1 Layout .pdf3 Feb 2025
Building plan approvalFile: Lunaris-1 Building Plan Pg-1 .pdf31 Jan 2025
Building plan approvalFile: Lunaris-1 Building Plan Pg-2.pdf31 Jan 2025
Building plan approvalFile: Lunaris-1 Building Plan Pg-3.pdf31 Jan 2025
Building plan approvalFile: Lunaris-1 Building Plan Pg-4.pdf31 Jan 2025
Building plan approvalFile: Lunaris-1 Building Plan Pg-5.pdf31 Jan 2025
Building plan approvalFile: Lunaris-1 Building Plan Pg-6.pdf31 Jan 2025
Building plan approvalFile: Lunaris-1 Building Plan Pg-7.pdf31 Jan 2025
Copy of the legal title reportFile: Lunaris-1 Title report.pdf31 Jan 2025
Commencement Certificates / NA Order for plotted developmentFile: Linaris-1 final CC .pdf31 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: Lunaris-1 Building Plan Pg-1 .pdf31 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: Lunaris-1 Building Plan Pg-2.pdf31 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: Lunaris-1 Building Plan Pg-3.pdf31 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: Lunaris-1 Building Plan Pg-4.pdf31 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: Lunaris-1 Building Plan Pg-5.pdf31 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: Lunaris-1 Building Plan Pg-6.pdf31 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: Lunaris-1 Building Plan Pg-7.pdf31 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Lunaris 1 311224.pdf23 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Raheja Lunaris-1.pdf27 Dec 2024
Other - TechnicalFile: Subdivision Plan 151024.pdf19 Dec 2024
Copy of the legal title reportFile: Title Certificate recording Sub division.pdf10 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Lunaris-1 Form 2 300924.pdf7 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Lunaris 1 300924.pdf6 Dec 2024
CERSAI detailsFile: Lunaris 1 Cersai Undertaking 010724.pdf1 Jul 2024
Copy of the legal title reportFile: RERA Title Certificate-Raheja District Plot B-4-06-2024.pdf17 Jun 2024
Details of encumbrances concerned to FinanceFile: Lunaris 1 Encumbrance Letter Finance and Legal.pdf17 Jun 2024
Details of encumbrances concerned to LegalFile: Lunaris 1 Encumbrance Letter Finance and Legal.pdf17 Jun 2024
Proforma of Agreement for saleFile: Lunaris-1 ATSL (170624) RERA version.pdf17 Jun 2024
Deviation Report with respect to model copy of AgreementFile: Deviation Report ATSL - 170624.pdf17 Jun 2024
Other - LegalFile: 01 Herdilia Lease (18041966).PDF17 Jun 2024
Other - LegalFile: 03 Herdilia Supplemental Lease (190271).PDF17 Jun 2024
Other - LegalFile: Deed of Assignment dtd 05102006.pdf17 Jun 2024
Other - LegalFile: MIDC Transfer Demand - 19032004.PDF17 Jun 2024
Other - LegalFile: MOU- 5122003.PDF17 Jun 2024
Other - LegalFile: SSSL- DA 1122004.PDF17 Jun 2024
Other - LegalFile: K Raheja to RUPL name change.pdf17 Jun 2024
Other - TechnicalFile: Lunaris CC Authentication - MIDC Mail.pdf14 Jun 2024
Other - TechnicalFile: Lunaris Plot Declaration.pdf7 Jun 2024
Layout approvalFile: Lunaris 1 Layout.pdf4 Jun 2024
Building plan approvalFile: Lunaris 1 Building Plan.pdf4 Jun 2024
PAN CardFile: PAN card.PDF4 Jun 2024
Details of encumbrances concerned to FinanceFile: Lunaris-1 Legla and Finance Encumbrance Report.pdf4 Jun 2024
Details of encumbrances concerned to LegalFile: Lunaris-1 Legla and Finance Encumbrance Report.pdf4 Jun 2024
Copy of Layout Approval (in case of layout)File: Lunaris 1 Layout.pdf4 Jun 2024
Building Plan Approval / NA Order for plotted developmentFile: Lunaris 1 Building Plan.pdf4 Jun 2024
Commencement Certificates / NA Order for plotted developmentFile: Lunaris-1 Commencement Certificate.pdf4 Jun 2024
Declaration about Commencement CertificateFile: Lunaris CC Declaration.pdf4 Jun 2024
Declaration in FORM BFile: Lunaris 1 Form B.pdf4 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Lunaris1.pdf4 Jun 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: SLR DOI.pdf4 Jun 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: RSR DOI.pdf4 Jun 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: ASR DOI.pdf4 Jun 2024
Proforma of Allotment letterFile: Allotment Letter final.pdf4 Jun 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Lunaris Bank Declaration.pdf4 Jun 2024
Deviation Report with respect to Allotment letterFile: Lunaris Allotment Letter Deviation.pdf4 Jun 2024

Promoter's earlier projects13

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

6 delivered on promise6 delivered late1 under way, not due yet
ProjectLocationFlatsRegisteredStatusPromisedDelivered
Raheja Lunaris-2PR1331012501769MIDC Industrial Area, Thane760Dec 2025OngoingDec 2031Not due yet
Tesla Building No 1 - Formerly known as EDISONJuinagar - Navi Mumbai259-CompletedApr 2018Apr 2018
Raheja Exotica - Sorento 5BMadh Island - Malad West165-CompletedOct 2017Apr 2017
Raheja Exotica - Sorento 5AMadh Island - Malad West211-CompletedOct 2017Apr 2017
Raheja RidgewoodGoregaon East - Mumbai278-CompletedMar 2017Late, Apr 2017
Raheja Reflections - OdysseyKandivali East Mumbai62-CompletedJan 2017Late, Apr 2017
Raheja Reflections - EternityKandivali East Mumbai229-CompletedMar 2016Mar 2016
Raheja Waterfront - PacificKulai - Mangalore292-CompletedDec 2014Late, Apr 2017
Raheja Waterfront - AtlanticKulai Manglore228-CompletedDec 2014Late, Mar 2016
Raheja Reflections - SerenityKandivali East256-CompletedMay 2014Late, Oct 2014
Raheja XionByculla - Mumbai12-CompletedApr 2013Apr 2013
Raheja Exotica - Amalfi Sicily and Capri - Phase - IIIMadh Island - Malad West311-CompletedApr 2013Late, Jun 2014
Raheja Reflection PlazaKandivali East1-CompletedFeb 2012Feb 2012

How this compares with Thane

59%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Raheja Lunaris-1 - Callisto on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near TTC INDUSTRIAL AREA7,600+ in Thane

Builder: Raheja Universal (Pvt.) Ltd.

Raheja Universal (Pvt.) Ltd. has 17 registrations on MahaRERA, including Raheja Imperia - I and Raheja Exotica Verona. Its filings disclose 13 earlier MahaRERA projects: declares 6 of 12 past projects completed on time. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if Raheja Lunaris-1 - Callisto is delayed beyond 31 Dec 2030?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Raheja Lunaris-1 - Callisto?

The registered promoter entity is Raheja Universal (Pvt.) Ltd., a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Raheja Lunaris-1 - Callisto?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Raheja Lunaris-1 - Callisto?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Raheja Lunaris-1 - Callisto?

The professionals named in the filing: Architect: KAMAL KHEMANI; Architect: Kamal Soni; Engineer: MAHESH LALLA; Engineer: Avinash Shinde; Chartered Accountant: VINIT & ASSOCIATES; Chartered Accountant: K. N. Gandhi & Co.. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Raheja Lunaris-1 - Callisto?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Raheja Lunaris-1 - Callisto. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Raheja Lunaris-1 - Callisto to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.