Home / Browse projects / Raigarh, Maharashtra / Gami Bianca

Registered No litigation declared Others project

Gami Bianca

By LAL GEBI INFRA PRIVATE LIMITED

RG-MH-55164 · RERA P52000051188 · Last updated on MahaRERA portal: 17 Apr 2026

Source: official MahaRERA filing

Red flags

  • 1 complaint at MahaRERA
  • Rs 90.00 crore secured on the land, in favour of IDBI TRUSTEE SHIP SERVICES LTD

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedno revision filed
4 of 33Construction stages doneacross 3 buildings; furthest along: Slabs of Super Structure, 95%
368 of 436Units unsoldnot recorded sold or booked
1Complaints at MahaRERAon this registration
Jump to the 91 documents Report an error

Gami Bianca is a Others project by LAL GEBI INFRA PRIVATE LIMITED in Raigarh, Maharashtra, registered with MahaRERA as P52000051188 on 1 Jun 2023. Possession is promised by 31 Dec 2027. 68 of the 436 units on this registration are recorded sold or booked, and 4 of 33 construction stages are filed complete. 1 complaint is on record with the regulator.

At a glance

Project

  • NameGami Bianca
  • TypeOthers
  • Location
    • Sector 47
    • Dronagiri
    • Navi Mumbai
    • Uran
    • Raigarh
    • 400702
  • Pincode400702
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52000051188
  • ReraGenie IDRG-MH-55164

Builder

  • NameLAL GEBI INFRA PRIVATE LIMITED
  • Entity typeCompany
  • CINU45309MH2020PTC345469
  • GSTIN27AAECL3308B1Z0
  • CIN and GSTIN are from this promoter's other MahaRERA registrations. This project's own filing does not repeat them.
  • DirectorsAMBALA GAMI, AMBALAL GAMI, AMBALAL GAMI
  • Other registrations6 more →
  • Completed2 of 7
  • Declared earlier projects4 →

Key dates

this monthRegisteredJun 2023PromisedDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on1 Jun 2023
  • Promised completion31 Dec 2027
  • Revised completionNone
  • Buildings3 building records
  • Documents filed91 files

Current status

16%68 of 436 units booked
57.5%Work done, per cost certificate

Figures as on 17 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A WingNA312216311174
B WingNA312281081
C WingNA312314239181

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 17 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Slabs of Super Structure, at 95%.

A Wing57%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)90%
Plinth90%
Stilt Floor90%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises67%
Sanitary Fittings within the flats / premises45%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks47%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
B Wing54%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)90%
Plinth90%
Stilt Floor90%
Slabs of Super Structure95%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises56%
Sanitary Fittings within the flats / premises36%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks39%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
C Wing43%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)90%
Plinth90%
Stilt Floor90%
Slabs of Super Structure64%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises25%
Sanitary Fittings within the flats / premises15%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 17 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed570

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots570
Closed/Covered339
Open Space231
BuildingClosed/CoveredOpen SpaceTotal
A Wing41149190
B Wing14941190
C Wing14941190

Land and ownership

A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area6,350 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared present
Charge in favour ofIDBI TRUSTEE SHIP SERVICES LTD
Secured amountRs 90.00 crore
CERSAI search filedYes
Declared on10 Jul 2026

Approvals and building plan

Sanctioning authorityCity and Industrial Development Corporation of Maharashtra
Permissible FSI36149.93
Proposed, not sanctioned35,785 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchVASHI
Estimated costRs 151.65 cr
Cost incurredRs 87.13 cr
Work done57.45%
BuildingWingEstimatedIncurred
A WingNARs 49.54 crRs 29.04 cr
B WingNARs 49.54 crRs 29.04 cr
C WingNARs 49.54 crRs 29.04 cr
-NARs 3.03 cr-

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectDimensions Architects Pvt Ltd
EngineerSK Consultants & Engineers
Chartered AccountantNB Sayed & Associates
Chartered AccountantRutuja Narsingh & Associates
PartnerRole in project
LAL GEBI INFRA PRIVATE LIMITED-

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
SM12600474Bhakti AchrekarLAL GEBI INFRA PRIVATE LIMITED15/07/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 25 Feb 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 17 Jun 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 17 Jun 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 17 Jun 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2027

Documents filed91

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 91 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 - Gami Bianca as on Dec 2025.pdf17 Apr 2026
Withdrawal Update Form 1File: Form 1 - Gami Bianca as on Dec 2025.pdf17 Apr 2026
Withdrawal Update Form 1File: Form 1 - Gami Bianca as on Dec 2025.pdf17 Apr 2026
Withdrawal Update Form 1File: Form 1 - Gami Bianca as on March 2026.pdf17 Apr 2026
Withdrawal Update Form 2File: Form 2 - Gami Bianca as on March 2026.pdf17 Apr 2026
Withdrawal Update Form 2File: Form 2 - Gami Bianca as on March 2026.pdf17 Apr 2026
Withdrawal Update Form 2File: Form 2 - Gami Bianca as on March 2026.pdf17 Apr 2026
Withdrawal Update Form 2File: Form 2 - Gami Bianca as on March 2026.pdf17 Apr 2026
Withdrawal Update Form 3File: Form 3 - Gami Bianca as on March 2026.pdf17 Apr 2026
Withdrawal Update Form 3File: Form 3 - Gami Bianca as on March 2026.pdf17 Apr 2026
Withdrawal Update Form 3File: Form 3 - Gami Bianca as on March 2026.pdf17 Apr 2026
Withdrawal Update Form 3File: Form 3 - Gami Bianca as on March 2026.pdf17 Apr 2026
Form 5 (FY 2024-2025)File: Form 5 - Gami Bianca - FY 2024-25.pdf31 Dec 2025
Form 1File: Form 1 - Gami Bianca as on Sep 2025.pdf20 Oct 2025
Form 2File: Form 2 - Gami Bianca as on Sept 2025.pdf20 Oct 2025
Form 3File: Form 3 - Gami Bianca as on Sep 2025.pdf20 Oct 2025
Disclosure of Sold and Booked InventoryFile: Circular 29 - Gami Bianca as on Sep 2025.pdf20 Oct 2025
Form 1File: Form 1 - Gami Bianca as on June 2025.pdf28 Jul 2025
Form 2File: Form 2 - Gami Bianca as on June 2025.pdf28 Jul 2025
Form 3File: Form 3 - Gami Bianca as on June 2025.pdf28 Jul 2025
Disclosure of Sold and Booked InventoryFile: Circular 29 - Gami Bianca as on June 2025.pdf28 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 - Gami Bianca as on March 2025.pdf16 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Gami Bianca as on 31st March 2025.pdf16 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Gami Bianca as on March 2025.pdf16 Apr 2025
Proforma of Agreement for saleFile: DRONAGIRI AGREEMENT FOR SHOP.pdf28 Mar 2025
Proforma of Agreement for saleFile: DRONAGIRI AGREEMENT FOR FLAT.pdf28 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 7 Architect’s Certificate of Percentage of Completion of Work (Form 1).pdf22 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Gami Bianca as on Dec 2024.pdf22 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Gami Bianca as on December 2024 (SIGNED).pdf22 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Gami Bianca as on December 2024 (SIGNED).pdf22 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Gami Bianca as on 31st December 2024.pdf13 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Gami Bianca as on December 2024.pdf13 Jan 2025
Declaration about Commencement CertificateFile: FORMAT D.pdf28 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 - FY 2023-24.pdf28 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Gami Bianca as on 30th September 2024.pdf24 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Gami Bianca as on 30th September 2024-compressed.pdf24 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Gami Bianca as on 30th September 2024.pdf24 Dec 2024
Disclosure of sold/ booked inventoryFile: CIRCULAR 29 Gami Bianca as on Sep 2024_compressed.pdf2 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 - Gami Bianca.pdf26 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 - Gami Bianca - FY 2023-24_compressed.pdf26 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Gami Bianca as on 30th September 2024.pdf18 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Gami Bianca as on 30th September 2024.pdf18 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Gami Bianca as on June 2024.pdf17 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Gami Bianca as on June 2024.pdf17 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Gami Bianca as on June 2024.pdf15 Jul 2024
Building plan approvalFile: 7-9.pdf17 Jun 2024
Building plan approvalFile: 10-13.pdf17 Jun 2024
Layout approvalFile: 1-3.pdf17 Jun 2024
Building plan approvalFile: 4-6.pdf17 Jun 2024
Copy of Layout Approval (in case of layout)File: 1-3.pdf17 Jun 2024
Building Plan Approval / NA Order for plotted developmentFile: 4-6.pdf17 Jun 2024
Building Plan Approval / NA Order for plotted developmentFile: 7-9.pdf17 Jun 2024
Building Plan Approval / NA Order for plotted developmentFile: 10-13.pdf17 Jun 2024
Commencement Certificates / NA Order for plotted developmentFile: CIDCO - CC.pdf17 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 Engineer Certificate.pdf20 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf15 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3.pdf15 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 ENGINEER-GAMI BIANCA.pdf20 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate Dec 23.pdf19 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Ca Certificate Dec 23.pdf19 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 ENGINEER-GAMI BIANCA.pdf14 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 (From Architect)_New Format_dt021020.pdf13 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 CA Certificate Gami Bianca-Septemebr 23 1.pdf13 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: GAMI BIANCA FORM 1.pdf5 Aug 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 (4).pdf5 Aug 2023
Details of encumbrances concerned to FinanceFile: Encumbrance letter.pdf2 May 2023
Details of encumbrances concerned to LegalFile: Encumbrance letter.pdf2 May 2023
CERSAI detailsFile: CERSAI_Search_Report_200266826633_For_Asset_Based_Search_24_04_2023_13_32_19_387.pdf24 Apr 2023
Commencement Certificates / NA Order for plotted developmentFile: CORRIGNDUM for CC_compressed.pdf8 Apr 2023
Proforma of Agreement for saleFile: dronagiri agreement.pdf6 Apr 2023
Deviation Report with respect to model copy of AgreementFile: Deviation agreement .pdf6 Apr 2023
Declaration in FORM BFile: 8 FORM B.pdf8 Mar 2023
Proforma of Allotment letterFile: Allotment letter as per RERA _ Dronagiri.pdf8 Mar 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: signed CA Certificate.pdf2 Mar 2023
Deviation Report with respect to Allotment letterFile: No deviation allotment.pdf28 Feb 2023
Layout approvalFile: C C PLAN_1-2.pdf25 Feb 2023
Building plan approvalFile: C C PLAN_1-2.pdf25 Feb 2023
Layout approvalFile: C C PLAN_3-end.pdf25 Feb 2023
Building plan approvalFile: C C PLAN_3-end.pdf25 Feb 2023
PAN CardFile: Company Pan Card Lal Gebi Infra Pvt Ltd.pdf25 Feb 2023

Promoter's earlier projects3

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

3 under way, not due yet
ProjectLocationFlatsRegisteredStatusPromisedDelivered
Gami TelonP51700080035Ghansoli, Thane72Apr 2025OngoingDec 2029Not due yet
Gami MiravaPR1270002600408New Panvel, Raigarh327May 2026OngoingDec 2029Not due yet
Gami AvantP51700079740Vashi, Navi Mumbai, Thane232Mar 2025OngoingDec 2029Not due yet

How this compares with Raigarh

16%of this project is bookeddistrict median 29%
20%of Raigarh projects moved their completion datethis one has not
26%of Raigarh registrations have lapsed or been cancelledthis one is on the register

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Gami Bianca on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Dronagiri, Navi Mumbai5,900+ in Raigarh

2 kmGami BiancaCompleted 61Lapsed / revoked 23Other 46Dot size: filed unitsN

Filed coordinates, straight-line distance. 130 registered projects within 2 km.

Builder: LAL GEBI INFRA PRIVATE LIMITED

LAL GEBI INFRA PRIVATE LIMITED has 7 registrations on MahaRERA, including GAMI JADE and Gami Terra. Its filings disclose 4 earlier MahaRERA projects, none completed yet. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What are my rights if Gami Bianca is delayed beyond 31 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Gami Bianca?

The registered promoter entity is LAL GEBI INFRA PRIVATE LIMITED, a company as per the filing. Its CIN U45309MH2020PTC345469 and GSTIN 27AAECL3308B1Z0 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Gami Bianca?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Gami Bianca?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Gami Bianca?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Gami Bianca?

The professionals named in the filing: Architect: Dimensions Architects Pvt Ltd; Engineer: SK Consultants & Engineers; Chartered Accountant: NB Sayed & Associates; Chartered Accountant: Rutuja Narsingh & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Gami Bianca?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Gami Bianca. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Gami Bianca to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.