Home / Browse projects / Aurangabad, Maharashtra / Gaia Carnival Apartment Phase I
Gaia Carnival Apartment Phase I
By Zambad Disha Pride Infrastructure LLP
RG-MH-87865 · RERA P51500032793 · Last updated on MahaRERA portal: 17 Jan 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 10 months past the filed date
- 1 complaint at MahaRERA
Clear
- No litigation declared
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Aurangabad registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Gaia Carnival Apartment Phase I is a Residential / Group Housing project by Zambad Disha Pride Infrastructure LLP in Aurangabad, Maharashtra, registered with MahaRERA as P51500032793 on 29 Jan 2022. Possession was promised by 31 Dec 2025 and is now 10 months past that date. 1 complaint is on record with the regulator.
At a glance
Project
- NameGaia Carnival Apartment Phase I
- TypeResidential / Group Housing
- Location
- Beed By pass
- Satara
- Satara (CT)
- Aurangabad
- 431002
- Pincode431002
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51500032793
- ReraGenie IDRG-MH-87865
Builder
- NameZambad Disha Pride Infrastructure LLP
- Entity typePartnership
- PartnersSandesh Subhash Zambad, Subhash Manakchand Zambad, Seema Subhash Zambad, Netal Sandesh Zambad, Bhuvan Subhash Zambad
- Other registrations3 more →
- Completed2 of 4
- No longer live1 lapsed, de-registered or revoked
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on29 Jan 2022
- Promised completion31 Dec 2025
- Revised completionNone
- Buildings1 building record
- Documents filed149 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Gala Carnival Apartment Phase I | NA | 8 | 6 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 17 Jan 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
4 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 10%.
Gala Carnival Apartment Phase I: 37% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 10% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 17 Jan 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | No | Not applicable |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | No | Not applicable |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed68
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Rahul Thole and associates |
| Engineer | Rajendra Nilekar |
| Engineer | Laxman Peddy |
| Chartered Accountant | Narendra Navandar and company |
| Chartered Accountant | CA Mayur Bamb |
| Partner | Role in project |
|---|---|
| Zambad Disha Pride Infrastructure LLP | - |
Complaints filed with MahaRERA1
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC003000000060154 | Ravindra Champalal Khinvasara | Gaia Landmarks LLP (Formerly Known as Zambad Disha Pride Infrastructure LLP) | 29/06/2024 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 17 Jan 2022 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 25 Dec 2021 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 25 Dec 2021 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 25 Dec 2021Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed149
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 149 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 1File: Architects Certificate Dec-2025 P-1.pdf | 17 Jan 2026 |
| Form 2File: Engineers Certificate Dec-2025 P-1.pdf | 17 Jan 2026 |
| Form 3File: Form 3 Gaia Landmark llp Dt-12-1-2026_0001.pdf | 17 Jan 2026 |
| Disclosure of Sold and Booked InventoryFile: Disclosure Sold Unsold Phase 1.pdf | 17 Jan 2026 |
| OthersFile: Site Supervisors Certificate Dec-2025 P-1.pdf | 17 Jan 2026 |
| Form 1File: Form 1.pdf | 14 Jan 2026 |
| Form 2File: Form 2.pdf | 14 Jan 2026 |
| Form 3File: Form 3.pdf | 14 Jan 2026 |
| Disclosure of Sold and Booked InventoryFile: Disc.pdf | 14 Jan 2026 |
| OthersFile: Form 2A.pdf | 14 Jan 2026 |
| Form 1File: Form 1.pdf | 14 Jan 2026 |
| Form 2File: Form 2.pdf | 14 Jan 2026 |
| Form 3File: Form 3.pdf | 14 Jan 2026 |
| Disclosure of Sold and Booked InventoryFile: Disc.pdf | 14 Jan 2026 |
| OthersFile: Form 2A.pdf | 14 Jan 2026 |
| Form 1File: Form 1.pdf | 14 Jan 2026 |
| Form 2File: Form 2.pdf | 14 Jan 2026 |
| Form 3File: Form 3.pdf | 14 Jan 2026 |
| Disclosure of Sold and Booked InventoryFile: Disc.pdf | 14 Jan 2026 |
| OthersFile: Form 2A.pdf | 14 Jan 2026 |
| Form 1File: Form 1.pdf | 14 Jan 2026 |
| Form 2File: Form 2.pdf | 14 Jan 2026 |
| Form 3File: Form 3.pdf | 14 Jan 2026 |
| Disclosure of Sold and Booked InventoryFile: Disc.pdf | 14 Jan 2026 |
| OthersFile: Form 2A.pdf | 14 Jan 2026 |
| Form 1File: Form 1.pdf | 14 Jan 2026 |
| Form 2File: Form 2.pdf | 14 Jan 2026 |
| Form 3File: Form 3.pdf | 14 Jan 2026 |
| Disclosure of Sold and Booked InventoryFile: Disc.pdf | 14 Jan 2026 |
| OthersFile: Form 2A.pdf | 14 Jan 2026 |
| Form 1File: Form 1.pdf | 14 Jan 2026 |
| Form 2File: Form 2.pdf | 14 Jan 2026 |
| Form 3File: Form 3.pdf | 14 Jan 2026 |
| Disclosure of Sold and Booked InventoryFile: Disc.pdf | 14 Jan 2026 |
| OthersFile: Form 2A.pdf | 14 Jan 2026 |
| Form 1File: Form 1.pdf | 14 Jan 2026 |
| Form 2File: Form 2.pdf | 14 Jan 2026 |
| Form 3File: Form 3.pdf | 14 Jan 2026 |
| Disclosure of Sold and Booked InventoryFile: Disc.pdf | 14 Jan 2026 |
| OthersFile: Form 2A.pdf | 14 Jan 2026 |
| Form 1File: Form 1.pdf | 14 Jan 2026 |
| Form 2File: Form 2.pdf | 14 Jan 2026 |
| Form 3File: Form 3.pdf | 14 Jan 2026 |
| Disclosure of Sold and Booked InventoryFile: Disc.pdf | 14 Jan 2026 |
| OthersFile: Form 2A.pdf | 14 Jan 2026 |
| Form 1File: Form 1.pdf | 14 Jan 2026 |
| Form 2File: Form 2.pdf | 14 Jan 2026 |
| Form 3File: Form 3.pdf | 14 Jan 2026 |
| Disclosure of Sold and Booked InventoryFile: Disc.pdf | 14 Jan 2026 |
| OthersFile: Form 2A.pdf | 14 Jan 2026 |
| Form 1File: Form 1.pdf | 14 Jan 2026 |
| Form 2File: Form 2.pdf | 14 Jan 2026 |
| Form 3File: Form 3.pdf | 14 Jan 2026 |
| Disclosure of Sold and Booked InventoryFile: Disc.pdf | 14 Jan 2026 |
| OthersFile: Form 2A.pdf | 14 Jan 2026 |
| Form 1File: Form 1.pdf | 14 Jan 2026 |
| Form 2File: Form 2.pdf | 14 Jan 2026 |
| Form 3File: Form 3.pdf | 14 Jan 2026 |
| Disclosure of Sold and Booked InventoryFile: Disc.pdf | 14 Jan 2026 |
| OthersFile: Form 2A.pdf | 14 Jan 2026 |
| Form 1File: Form 1.pdf | 14 Jan 2026 |
| Form 2File: Form 2.pdf | 14 Jan 2026 |
| Form 3File: Form 3.pdf | 14 Jan 2026 |
| Disclosure of Sold and Booked InventoryFile: Disc.pdf | 14 Jan 2026 |
| OthersFile: Form 2A.pdf | 14 Jan 2026 |
| Form 1File: Form 1.pdf | 14 Jan 2026 |
| Form 2File: Form 2.pdf | 14 Jan 2026 |
| Form 3File: Form 3.pdf | 14 Jan 2026 |
| Disclosure of Sold and Booked InventoryFile: Disc.pdf | 14 Jan 2026 |
| OthersFile: Form 2A.pdf | 14 Jan 2026 |
| Form 1File: Form 1.pdf | 14 Jan 2026 |
| Form 2File: Form 2.pdf | 14 Jan 2026 |
| Form 3File: Form 3.pdf | 14 Jan 2026 |
| Disclosure of Sold and Booked InventoryFile: Disc.pdf | 14 Jan 2026 |
| OthersFile: Form 2A.pdf | 14 Jan 2026 |
| Form 1File: Form 1.pdf | 14 Jan 2026 |
| Form 2File: Form 2.pdf | 14 Jan 2026 |
| Form 3File: Form 3.pdf | 14 Jan 2026 |
| Disclosure of Sold and Booked InventoryFile: Disc.pdf | 14 Jan 2026 |
| OthersFile: Form 2A.pdf | 14 Jan 2026 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Aurangabad
Computed across the 1,400+ Aurangabad projects on ReraGenie, from their own filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 3 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 3 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 149 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep Gaia Carnival Apartment Phase I on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Satara1,400+ in Aurangabad
Filed coordinates, straight-line distance. 18 registered projects within 2 km.
Construction of 1056 EWS Tenements on Gut No 9
AURANGABAD HOUSING AND AREA DEVELOPMENT BO
PMAY U PADEGAON
M/s Laxmi JV
Khinvasara City
Ravindra Champalal Khinvasara
SHRI GOVINDAM HEIGHTS
SHREE VYANKATESHA INFRA
GANGOTRI VIHAR PHASE I
INSPIRA REALTY LLP
VIYAAN ANANTA PHASE II
RIDDHI VIYAAN VENTURES
See every Aurangabad project, with the district possession charts
Builder: Zambad Disha Pride Infrastructure LLP
Zambad Disha Pride Infrastructure LLP has 4 registrations on MahaRERA, including GAIA Shrushti and GAIA CARNIVAL - ROW HOUSES. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Aurangabad district page.
Frequently asked questions
What does it mean that Gaia Carnival Apartment Phase I shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if Gaia Carnival Apartment Phase I is delayed beyond 31 Dec 2025?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Gaia Carnival Apartment Phase I?
The registered promoter entity is Zambad Disha Pride Infrastructure LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Gaia Carnival Apartment Phase I?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against Gaia Carnival Apartment Phase I?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for Gaia Carnival Apartment Phase I?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Gaia Carnival Apartment Phase I?
The professionals named in the filing: Architect: Rahul Thole and associates; Engineer: Rajendra Nilekar; Engineer: Laxman Peddy; Chartered Accountant: Narendra Navandar and company; Chartered Accountant: CA Mayur Bamb. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Gaia Carnival Apartment Phase I?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback