GAGANGIRI COMPLEX
RG-MH-30277 · RERA P52000030075 · Last updated on MahaRERA portal: 17 Mar 2025
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 17 months past the filed date
- Completion date moved by 5 months
- 1 extension taken
Clear
- No litigation declared
- No complaints on record
- Separate project account declared
- Allotment letter follows the model form
4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
GAGANGIRI COMPLEX is a Residential / Group Housing project by GAGANGIRI DEVELOPERS in Raigarh, Maharashtra, registered with MahaRERA as P52000030075 on 29 Jul 2021. Possession was promised by 31 May 2025 and is now 17 months past that date. The completion date has moved by 5 months from the original filing.
At a glance
Project
- NameGAGANGIRI COMPLEX
- TypeResidential / Group Housing
- Location
- Survey No.175/1B and 175/1C
- Village - Pashane
- Vangani (w)
- Pashane
- Karjat
- Raigarh
- 410101
- Pincode410101
- RERA no.P52000030075
- ReraGenie IDRG-MH-30277
Builder
- NameGAGANGIRI DEVELOPERS
- Entity typePartnership
- PartnersSANDEEP ASHOK VISHE, SANTOSH BABAN MANE, HEMA SIDHARAJ KINNOR
- Other registrations1 more →
- Completed1 of 2
- No longer live1 lapsed, de-registered or revoked
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on29 Jul 2021
- Promised completion31 May 2025
- Revised completionRevised to 31 May 2025 (originally 31 Dec 2024)
- Buildings2 building records
- Documents filed67 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| A-WING | NA | 5 | 0 | 0 | 0 | 0 |
| B-WING | NA | 5 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building2
As on 17 Mar 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
20 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Podiums (if any), at 0%.
A-WING91%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
B-WING91%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 17 Mar 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | No | Not applicable |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | No | Not applicable |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Land and ownership1
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| KIRTI KISHOR VISHE | Pashane | Raigarh |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners3
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | NEETA ASSOCIATES |
| Engineer | SHREE SAMARTH KRUPA ASSOCIATES |
| Chartered Accountant | YOGESH NANDA AND ASSOCIATES |
| Partner | Role in project |
|---|---|
| GAGANGIRI DEVELOPERS | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterWe are writing to request an extension of the RERA registration date for our project. The project has been completed, and we have already applied for the Occupation Certificate. However, we understand that it may take some time for the authority to issue the Occupation Certificate. In light of this, we kindly request an extension of the RERA registration date by five months to accommodate the delay in receiving the Occupation Certificate. We would be grateful for your consideration and approval of this request. Please let us know if you require any additional documentation or information. Than
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 13 Jul 2021 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 14 Jul 2021 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 14 Jul 2021 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 13 Jul 2021Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed67
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Declaration in FORM BFile: FORM B REVISED GAGANGIRI.pdf | 17 Mar 2025 |
| Other - TechnicalFile: ENGINEER LETTER FOR CPM PERT.pdf | 17 Mar 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 5 FORM 1 ARCHITECT 31 3 2023.pdf | 18 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 6 FORM 1 ARCHITECT 30 6 2023.pdf | 18 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 7 FORM 1 ARCHITECT 30 9 2023.pdf | 18 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 8 FORM 1 ARCHITECT 31 12 2023.pdf | 18 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1 FORM 1 ARCHITECT 31 3 2024.pdf | 18 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 2 FORM 1 ARCHITECT 30 6 2024.pdf | 18 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 3 FORM 1 ARCHITECT 30 9 2024.pdf | 18 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 4 FORM 1 ARCHITECT 31 12 2024.pdf | 18 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3 FORM 3 CA CERT 30 9 2023.pdf | 18 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 12 FORM 3 CA CERT 31 12 2024.pdf | 18 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 11 FORM 3 CA CERT 30 9 2024.pdf | 18 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 10 FORM 3 CA CERT 30 6 2024.pdf | 18 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 9 FORM 3 CA CERT 31 3 2024.pdf | 18 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 4 FORM 3 CA CERT 31 12 2023.pdf | 18 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 2 FORM 3 CA CERT 30 6 2023.pdf | 18 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 1 FORM 3 CA CERT 31 3 2023.pdf | 18 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 9 FORM 2 ENGINEER 31 3 2023.pdf | 18 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 8 FORM 2 ENGINEER 31 12 2024.pdf | 18 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 7 FORM 2 ENGINEER 30 9 2024.pdf | 18 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 6 FORM 2 ENGINEER 30 6 2024.pdf | 18 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 5 FORM 2 ENGINEER 31 3 2024.pdf | 18 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 12 FORM 2 ENGINEER 31 12 2023.pdf | 18 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 11 FORM 2 ENGINEER 30 9 2023.pdf | 18 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 10 FORM 2 ENGINEER 30 6 2023.pdf | 18 Feb 2025 |
| Disclosure of sold/ booked inventoryFile: 14 SOLD UNSOLD UPDATE 31 3 2023.pdf | 18 Feb 2025 |
| Disclosure of sold/ booked inventoryFile: 15 SOLD UNSOLD UPDATE 30 6 2023.pdf | 18 Feb 2025 |
| Disclosure of sold/ booked inventoryFile: 16 SOLD UNSOLD UPDATE 30 9 2023.pdf | 18 Feb 2025 |
| Disclosure of sold/ booked inventoryFile: 17 SOLD UNSOLD UPDATE 31 12 2023.pdf | 18 Feb 2025 |
| Disclosure of sold/ booked inventoryFile: 14 SOLD UNSOLD UPDATE 31 3 2024.pdf | 18 Feb 2025 |
| Disclosure of sold/ booked inventoryFile: 15 SOLD UNSOLD UPDATE 30 6 2024.pdf | 18 Feb 2025 |
| Disclosure of sold/ booked inventoryFile: 16 SOLD UNSOLD UPDATE 30 9 2024.pdf | 18 Feb 2025 |
| Disclosure of sold/ booked inventoryFile: 17 SOLD UNSOLD UPDATE 31 12 2024.pdf | 18 Feb 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: 13 FORM 2A ENGINEER 31 3 2023.pdf | 18 Feb 2025 |
| Declaration in FORM BFile: FORM B REVISED FINAL.pdf | 26 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 ARCHITECH CERTIFICATE.pdf | 26 Dec 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 CA CERTIFICATE FINAL.pdf | 26 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 ENGINEER CERTIFICATE.pdf | 26 Dec 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A ENGINEER CERTIFICATE.pdf | 26 Dec 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FROM 5 GAGANGIRI COMPLEX.pdf | 6 Dec 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5 GAGANGIRI COMPLEX.pdf | 2 Mar 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FORM 5 FY 2021-22 GAGANGIRI COMPLEX.pdf | 5 Apr 2023 |
| Layout approvalFile: BUILDING LAYOUT PLAN.pdf | 14 Jul 2021 |
| Building plan approvalFile: BUILDING LAYOUT PLAN.pdf | 14 Jul 2021 |
| Copy of Layout Approval (in case of layout)File: BUILDING LAYOUT PLAN.pdf | 14 Jul 2021 |
| Building Plan Approval / NA Order for plotted developmentFile: BUILDING LAYOUT PLAN.pdf | 14 Jul 2021 |
| Declaration about Commencement CertificateFile: C C DECLARATION.pdf | 14 Jul 2021 |
| PAN CardFile: FIRM PAN CARD.pdf | 13 Jul 2021 |
| Copy of the legal title reportFile: LEGAL TITLE REPORT.pdf | 13 Jul 2021 |
| Details of encumbrancesFile: ENCUMBRANCE LETTER.pdf | 13 Jul 2021 |
| Commencement Certificates / NA Order for plotted developmentFile: C C PART 1.pdf | 13 Jul 2021 |
| Commencement Certificates / NA Order for plotted developmentFile: C C PART 2.pdf | 13 Jul 2021 |
| Commencement Certificates / NA Order for plotted developmentFile: C C PART 3.pdf | 13 Jul 2021 |
| Declaration in FORM BFile: FORM B.pdf | 13 Jul 2021 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE.pdf | 13 Jul 2021 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE.pdf | 13 Jul 2021 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE.pdf | 13 Jul 2021 |
| Proforma of Allotment letterFile: DRAFT ALLOTMENT LETTER.pdf | 13 Jul 2021 |
| Proforma of Allotment letterFile: DRAFT AGREEMENT.pdf | 13 Jul 2021 |
| OtherFile: CREDAI CERTIFICATE.pdf | 13 Jul 2021 |
| OtherFile: DEVELOPMENT AGREEMENT PART 1.pdf | 13 Jul 2021 |
| OtherFile: DEVELOPMENT AGREEMENT PART 2.pdf | 13 Jul 2021 |
| OtherFile: DEVELOPMENT AGREEMENT PART 3.pdf | 13 Jul 2021 |
| OtherFile: DEVELOPMENT AGREEMENT PART 4.pdf | 13 Jul 2021 |
| OtherFile: DEATH CERTIFICATE.pdf | 13 Jul 2021 |
| OtherFile: AFFIDAVIT.pdf | 13 Jul 2021 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Raigarh
Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.
Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 4 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 1 other registration, which the RERA portal never shows together
- All 67 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
- A watch tells you the moment that changes, including if the registration lapses or a complaint is filed
- But on this project's record so far, expect it to be quiet. You can also save this project free and keep it on your shortlist
Keep GAGANGIRI COMPLEX on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Village - Pashane, Vangani (w)5,900+ in Raigarh
ForeverLand
HOABL IMPACTUM LAND PRIVATE LIMITED
Chitrapatjanak Dadasaheb Phalke Township - Pha
Anukarati Homes Pvt Ltd
Olympeo Neo City
PRIZTINE INFRA LLP
DEEPJYOTI CITY
DeepJyoti Infra
VISION AARAMBH
M/s Vision Aarambh ( AOP )
Olympeo Riverside - Phase 3
Olympeo Riverside Projects LLP
See every Raigarh project, with the district possession charts
Builder: GAGANGIRI DEVELOPERS
GAGANGIRI DEVELOPERS has 2 registrations on MahaRERA, including GAGANGIRI COMPLEX and Gagan 45. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Raigarh district page.
Frequently asked questions
What does it mean that GAGANGIRI COMPLEX shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if GAGANGIRI COMPLEX is delayed beyond 31 May 2025?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of GAGANGIRI COMPLEX?
The registered promoter entity is GAGANGIRI DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in GAGANGIRI COMPLEX?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for GAGANGIRI COMPLEX?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at GAGANGIRI COMPLEX?
The professionals named in the filing: Architect: NEETA ASSOCIATES; Engineer: SHREE SAMARTH KRUPA ASSOCIATES; Chartered Accountant: YOGESH NANDA AND ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in GAGANGIRI COMPLEX?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback