ReraGenieLog inGet a buyer report

Home / Browse projects / Pune, Maharashtra / GAGAN UNNATII PHASE 2

Completed No litigation declared Residential / Group Housing project

GAGAN UNNATII PHASE 2

By Gagan Unnati Ventures

RG-MH-08654 · RERA P52100001818 · Last updated on MahaRERA portal: 7 Nov 2019

Source: official MahaRERA filing

Red flags

  • Completion date moved by 18 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA
  • All 1 earlier projects delivered on promise

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Sep 2020Possession promisedregistration recorded completed
41 of 44Construction stages doneacross 4 buildings; furthest along: Internal walls, 95%
0Complaints at MahaRERAon this registration
Jump to the 57 documents Report an error

GAGAN UNNATII PHASE 2 is a Residential / Group Housing project by Gagan Unnati Ventures in Pune, Maharashtra, registered with MahaRERA as P52100001818 on 29 Jul 2017. The registration is recorded completed; possession was promised by 30 Sep 2020. The completion date has moved by 18 months from the original filing.

At a glance

Project

  • NameGAGAN UNNATII PHASE 2
  • TypeResidential / Group Housing
  • Location
    • Katraj kondhwa Road
    • Kondhwa
    • Katraj
    • Haveli
    • Pune
    • 411048
  • Pincode411048
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100001818
  • ReraGenie IDRG-MH-08654

Builder

  • NameGagan Unnati Ventures
  • Entity typeOthers
  • Named personsNISARG LAND & PROPERTIES DEVLOPERS (PUNE) LLP, GAGAN ACE HORIZON
  • Other registrations1 more →
  • Completed1 of 2
  • No longer live1 lapsed, de-registered or revoked
  • Declared earlier projects1 →

Key dates

this monthRegisteredJul 2017First promiseMar 2019Revised toSep 2020Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on29 Jul 2017
  • Promised completion30 Sep 2020
  • Revised completionRevised to 30 Sep 2020 (originally 31 Mar 2019)
  • Buildings4 building records
  • Documents filed57 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BUILDING ANA270000
BUILDING BNA270000
BUILDING CNA270000
BUILDING DNA80000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building4

As on 7 Nov 2019, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

41 of 44 construction stages are filed complete across 4 buildings. The stage furthest along is Internal walls, at 95%.

BUILDING A97%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises95%
Sanitary Fittings within the flats / premises70%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
BUILDING B100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
BUILDING C100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
BUILDING D91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 7 Nov 2019, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsYes100%
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes20%
Open ParkingYes10%

Parking filed347

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots347
Closed/Covered308
Open Space39
BuildingClosed/CoveredOpen SpaceTotal
BUILDING A12113134
BUILDING B10213115
BUILDING C851398

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area8,888 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI21119.12
Proposed, not sanctioned21,119 sq m
Buildings approved4
Buildings sanctioned4

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchFORT MUMBAI MAHARASHTRA

Certifying professionals and partners2

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectVILAS TARWADI
EngineerMR G A BHILLARE
PartnerRole in project
Gagan Unnati Ventures-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100002565Mar 2019 → Mar 2020

Reason as filed by the promoterReason for Extension: On Account of varied reasons at different points of time during the tenure of the project such as: a. Non- availability or limited supply of steel, other building material, water or electric supply. b. any notice, order, rule, notification of the Government and/or other public or competent authority/court c. Delay in grant of any NOC/permission/license/ connection installation of any services such as lifts, electricity & water connections & meters to the scheme/unit /road NOC or completion certificate from Appropriate Authority the Promoters/Owners having complied with al

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 19 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 19 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 19 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 11 Jul 2017Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed57

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: form5-GUV.pdf7 Nov 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Gagan Unnati Arch certificate 12042019.pdf15 Apr 2019
Form 2AFile: quality Unnati.pdf11 Dec 2018
Certificates of CA (Form 5)File: Gagan Unnati Phase 2 Form 5.pdf4 Dec 2018
Certificates of Architect (Form 4)File: Form 4 Unnati.pdf1 Oct 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Gagan Unnati Arch certificate 27082018.pdf5 Sep 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Gagan Unnati Arch certificate 09052018.pdf14 May 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Gagan Unnati Arch certificate.pdf18 Jan 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Gagan Unnati arch certificate 1112017.pdf1 Nov 2017
Certificates of Architect (Form 4)File: form 4.pdf23 Aug 2017
Declaration in FORM BFile: Gagan Unnatii Phase II From B.pdf28 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEER CERTIFICATE.pdf28 Jul 2017
Certificates of CA (Form 3)File: CA CERTIFICATE.pdf28 Jul 2017
Proforma of Allotment letterFile: Rera FP Agreement.pdf28 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Tarwadi Certificate Unnatii.pdf26 Jul 2017
Layout approvalFile: UNNATI LAYOUT.pdf19 Jul 2017
Building plan approvalFile: Temp002-19.pdf19 Jul 2017
Building plan approvalFile: Temp003-19.pdf19 Jul 2017
Building plan approvalFile: Temp004-19.pdf19 Jul 2017
Building plan approvalFile: Temp005-19.pdf19 Jul 2017
Building plan approvalFile: Temp006-19.pdf19 Jul 2017
Building plan approvalFile: Temp007-19.pdf19 Jul 2017
Building plan approvalFile: Temp008-19.pdf19 Jul 2017
Building plan approvalFile: Temp009-19.pdf19 Jul 2017
Building plan approvalFile: Temp010-19.pdf19 Jul 2017
Building plan approvalFile: Temp011-19.pdf19 Jul 2017
Building plan approvalFile: Temp012-19.pdf19 Jul 2017
Building plan approvalFile: Temp013-19.pdf19 Jul 2017
Building plan approvalFile: Temp014-19.pdf19 Jul 2017
Building plan approvalFile: Temp015-19.pdf19 Jul 2017
Building plan approvalFile: Temp016-19.pdf19 Jul 2017
Building plan approvalFile: Temp017-19.pdf19 Jul 2017
Building plan approvalFile: Temp018-19.pdf19 Jul 2017
Building plan approvalFile: Temp019-19.pdf19 Jul 2017
Copy of the legal title reportFile: Title Certificate.pdf19 Jul 2017
Copy of Layout Approval (in case of layout)File: UNNATI LAYOUT.pdf19 Jul 2017
Building Plan Approval (IOD)File: Temp002-19.pdf19 Jul 2017
Building Plan Approval (IOD)File: Temp003-19.pdf19 Jul 2017
Building Plan Approval (IOD)File: Temp004-19.pdf19 Jul 2017
Building Plan Approval (IOD)File: Temp005-19.pdf19 Jul 2017
Building Plan Approval (IOD)File: Temp006-19.pdf19 Jul 2017
Building Plan Approval (IOD)File: Temp007-19.pdf19 Jul 2017
Building Plan Approval (IOD)File: Temp008-19.pdf19 Jul 2017
Building Plan Approval (IOD)File: Temp009-19.pdf19 Jul 2017
Building Plan Approval (IOD)File: Temp010-19.pdf19 Jul 2017
Building Plan Approval (IOD)File: Temp011-19.pdf19 Jul 2017
Building Plan Approval (IOD)File: Temp012-19.pdf19 Jul 2017
Building Plan Approval (IOD)File: Temp013-19.pdf19 Jul 2017
Building Plan Approval (IOD)File: Temp014-19.pdf19 Jul 2017
Building Plan Approval (IOD)File: Temp015-19.pdf19 Jul 2017
Building Plan Approval (IOD)File: Temp016-19.pdf19 Jul 2017
Building Plan Approval (IOD)File: Temp017-19.pdf19 Jul 2017
Building Plan Approval (IOD)File: Temp018-19.pdf19 Jul 2017
Building Plan Approval (IOD)File: Temp019-19.pdf19 Jul 2017
PAN CardFile: GAGAN UNNATI VENTURES.pdf13 Jul 2017
Details of encumbrancesFile: Mortgage Deed-Gagan Unnati-5335-17 dt-28-06-2017.pdf11 Jul 2017
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate -2792-2016.pdf11 Jul 2017

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
GAGAN UNNATI PHASE 1- COMMERCIAL SHOPSSR NO 56-8 KATRAJ KONDHWA ROAD PUNE30CompletedDec 2017Dec 2017

How this compares with Pune

26%of Pune projects moved their completion datethis one moved by 18 months
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep GAGAN UNNATII PHASE 2 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Kondhwa13,700+ in Pune

2 kmGAGAN UNNATII PHASE 2Completed 56Lapsed / revoked 37Other 58Dot size: filed unitsN

Filed coordinates, straight-line distance. 151 registered projects within 2 km.

Builder: Gagan Unnati Ventures

Gagan Unnati Ventures has 2 registrations on MahaRERA, including GAGAN UNNATII PHASE 2 and GAGAN UNNATII PHASE 3. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if GAGAN UNNATII PHASE 2 is delayed beyond 30 Sep 2020?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of GAGAN UNNATII PHASE 2?

The registered promoter entity is Gagan Unnati Ventures, an others as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in GAGAN UNNATII PHASE 2?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for GAGAN UNNATII PHASE 2?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at GAGAN UNNATII PHASE 2?

The professionals named in the filing: Architect: VILAS TARWADI; Engineer: MR G A BHILLARE. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in GAGAN UNNATII PHASE 2?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About GAGAN UNNATII PHASE 2. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save GAGAN UNNATII PHASE 2 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.