ReraGenieLog inGet a buyer report

Home / Browse projects / Pune, Maharashtra / Gagan Signet

Registration lapsed No litigation declared Others project

Gagan Signet

By Gagan Realtors LLP

RG-MH-10232 · RERA P52100001819 · Last updated on MahaRERA portal: 5 Feb 2025

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 47 months past the filed date
  • 5 complaints at MahaRERA
  • Completion date moved by 29 months
  • 4 extensions taken

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form

5 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Nov 2022Possession promised47 months past this date
19 of 33Construction stages doneacross 3 buildings; furthest along: External plumbing and external plaster, 98%
5Complaints at MahaRERAon this registration
Jump to the 186 documents Report an error

Gagan Signet is a Others project by Gagan Realtors LLP in Pune, Maharashtra, registered with MahaRERA as P52100001819 on 29 Jul 2017. Possession was promised by 30 Nov 2022 and is now 47 months past that date. The completion date has moved by 29 months from the original filing. 5 complaints are on record with the regulator.

At a glance

Project

  • NameGagan Signet
  • TypeOthers
  • Location
    • 0
    • kondhwa BK
    • Haveli
    • Pune
    • 411048
  • Pincode411048
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100001819
  • ReraGenie IDRG-MH-10232

Builder

  • NameGagan Realtors LLP
  • Entity typePartnership
  • GSTIN27AAOFG9135C1ZA
  • PartnersKirankumar Tarachand Chopada, Surendra Narendra Thakkar, Rohit Sureshchand Garg

Key dates

47 months past promisethis monthRegisteredJul 2017First promiseJun 2020Revised toNov 2022

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on29 Jul 2017
  • Promised completion30 Nov 2022
  • Revised completionRevised to 30 Nov 2022 (originally 30 Jun 2020)
  • Buildings3 building records
  • Documents filed186 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
ANA200000
BNA200000
CNA190000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 5 Feb 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

19 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is External plumbing and external plaster, at 98%.

A88%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises95%
Sanitary Fittings within the flats / premises15%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks93%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.98%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.65%
B89%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises15%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks90%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.95%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.80%
C84%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises82%
Sanitary Fittings within the flats / premises7%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks90%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.90%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.55%

Progress on shared amenities15

As on 5 Feb 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes60%
Water SupplyYes40%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes70%
Storm Water DrainsYes95%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes80%
Treatment And Disposal Of Sewage And Sullage WaterYes80%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes80%
Energy managemcntYes20%
Fire protection and fire safety requirementsYes80%
Electrical meter room, sub-station, receiving stationYes80%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed3

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots3
Closed/Covered3
BuildingClosed/CoveredTotal
A11
B11
C11

Land and ownership2

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area9,888 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
LandownerVillageDistrict
Asif DaruwalaGultekadiPune
Arif DaruwalaGultekadiPune

Approvals and building plan

Permissible FSI15375.12
Proposed, not sanctioned10,744 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchKoregaon Park Pune

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMalwadkar Architects Pvt. Ltd
ArchitectMalvadkar Architects
EngineerDesign werkz Engg Pvt.Ltd
Chartered AccountantBirla & Company
Chartered AccountantK.G Jhamvar & Co.
PartnerRole in project
Gagan Realtors LLP-

Extensions applied for4

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100005437Jun 2020 → Jun 2021

Reason as filed by the promoter1) We are the Promoters of the Real Estate Project known as “GAGAN SIGNET” under implementation by us on land out of Survey No.66/11/1, Village Kondhwa Budruk within the Registration Sub-District of Taluka Haveli, District Pune. You were kind enough to grant Registration of the said Project vide your Registration Certificate No. P52100001819 dated 29/07/2017. 2) In anticipation that we would complete the said Project on or before 30/06/2020, in our Application to you for Registration of our Project, we had mentioned the date of Completion as 30/06/2020. However, due to unforeseen and unexpecte

EXT52100005562Jun 2020 → Jun 2021

Reason as filed by the promoterDue to unforeseen and unexpected delays in the municiple corporation of pune sanctioning revised building plan in respect of the said project and the very severe adverse market conditions we anticipate that e will not able to complete the project beyond the stipulated date

EXT52100012803Jun 2020 → Nov 2022

Reason as filed by the promoter1) We are the Promoters of the Real Estate Project known as “GAGAN SIGNET” under implementation by us on land out of Survey No.66/11/1, Village Kondhwa Budruk within the Registration Sub-District of Taluka Haveli, District Pune. You were kind enough to grant Registration of the said Project vide your Registration Certificate No. P52100001819 dated 29/07/2017. 2) In anticipation that we would complete the said Project on or before 31/10/2022, in our application to you for Registration of our Project, we had mentioned the date of Completion as 31/10/2022. However, due to unforeseen and unexpecte

EXT52100012117Jun 2020 → Oct 2022

Reason as filed by the promoter1) We are the Promoters of the Real Estate Project known as “GAGAN SIGNET” under implementation by us on land out of Survey No.66/11/1, Village Kondhwa Budruk within the Registration Sub-District of Taluka Haveli, District Pune. You were kind enough to grant Registration of the said Project vide your Registration Certificate No. P52100001819 dated 29/07/2017. 2) In anticipation that we would complete the said Project on or before 30/06/2022, in our application to you for Registration of our Project, we had mentioned the date of Completion as 30/06/2022. However, due to unforeseen and unexpecte

Complaints filed with MahaRERA5

Case no.ComplainantRespondentFiled
CC005000000106592DINESH SOHANDAGagan Realtors LLP10/02/2022
CC005000000106613Amol Jawahar ChangediaGagan Realtors LLP10/02/2022
CC005000000208224RAJANIKANT JANARDAN KAJAVEGAGAN REALTORS LLP08/02/2023
CC005000000208220MONICA MANOJ MUTHIYANGAGAN REALTORS LLP06/02/2023
CC005000000471247Priya Niteen BhaleraoM/s Gagan Realtors15/07/2024

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 24 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 17 Sep 2020
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 17 Sep 2020
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 17 Sep 2020Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 12 Nov 2024

Documents filed186

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 186 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect’s Certificate on Completion of Project (Form 4)File: Form 4 (1).pdf5 Feb 2025
Status of Formation of Legal Entity (Society/Co Op etc.)File: GAGAN SIGNET.pdf28 Jan 2025
Status of Formation of Legal Entity (Society/Co Op etc.)File: GAGAN SIGNET PREMISES.pdf28 Jan 2025
Status of Formation of Legal Entity (Society/Co Op etc.)File: GAGAN SIGNET MHADA.pdf28 Jan 2025
Architect’s Certificate on Completion of Project (Form 4)File: Form 4 (1).pdf4 Dec 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1.pdf2 Dec 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form1.pdf2 Dec 2024
Certificates of CA (Form 3)File: Form 3.pdf2 Dec 2024
Certificates of CA (Form 3)File: Form 3.pdf2 Dec 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2.pdf2 Dec 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2.pdf2 Dec 2024
Architect’s Certificate on Completion of Project (Form 4)File: Form 4.pdf12 Nov 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Shop Completion Certificate.pdf12 Nov 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Completion Certificate.pdf27 Dec 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Gagan Signet.pdf22 Oct 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate.pdf10 Feb 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate.pdf10 Feb 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate.pdf10 Feb 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate.pdf10 Feb 2023
Certificates of CA (Form 3)File: Form 3.pdf10 Feb 2023
Certificates of CA (Form 3)File: Form 3.pdf10 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 Gagan Signet.pdf6 Dec 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate.pdf30 Sep 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate.pdf30 Sep 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate.pdf30 Sep 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate.pdf30 Sep 2022
Certificates of CA (Form 3)File: From 3.pdf30 Sep 2022
Certificates of CA (Form 3)File: From 3.pdf30 Sep 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architects Certificate.pdf11 Aug 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architects Certificate.pdf11 Aug 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architects Certificate.pdf11 Aug 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate.pdf11 Aug 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate.pdf11 Aug 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate.pdf11 Aug 2022
Certificates of CA (Form 3)File: Form 3.pdf11 Aug 2022
Certificates of CA (Form 3)File: Form 3.pdf11 Aug 2022
Certificates of CA (Form 3)File: Form 3.pdf11 Aug 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECT'S CERTIFICATE.pdf7 Jul 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate.pdf7 Jul 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate.pdf7 Jul 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate.pdf7 Jul 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate.pdf7 Jul 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate.pdf7 Jul 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate.pdf7 Jul 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate.pdf7 Jul 2022
Certificates of CA (Form 3)File: From 3.pdf7 Jul 2022
Certificates of CA (Form 3)File: From 3.pdf7 Jul 2022
Certificates of CA (Form 3)File: From 3.pdf7 Jul 2022
Certificates of CA (Form 3)File: From 3.pdf7 Jul 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: 2 Certificates of CA (Form 5).pdf27 Jun 2022
Declaration about Commencement CertificateFile: Declaration.pdf3 May 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Engineer's Certificate.pdf3 May 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Engineer's Certificate.pdf3 May 2022
Disclosure of sold/ booked inventoryFile: Sold booked inventory.pdf3 May 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: From 5.pdf30 Sep 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: From 5 Gagan Signet.pdf6 Feb 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate.pdf4 Nov 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate.pdf4 Nov 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate.pdf4 Nov 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate.pdf4 Nov 2020
Certificates of CA (Form 3)File: From 3.pdf4 Nov 2020
Certificates of CA (Form 3)File: From 3.pdf4 Nov 2020
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5.pdf30 Sep 2020
Layout approvalFile: 1-2.pdf17 Sep 2020
Layout approvalFile: 2-2.pdf17 Sep 2020
Building plan approvalFile: 3.pdf17 Sep 2020
Building plan approvalFile: 4.pdf17 Sep 2020
Building plan approvalFile: 5.pdf17 Sep 2020
Building plan approvalFile: 6.pdf17 Sep 2020
Building plan approvalFile: 7.pdf17 Sep 2020
Building plan approvalFile: 8.pdf17 Sep 2020
Building plan approvalFile: 9.pdf17 Sep 2020
Building plan approvalFile: 10.pdf17 Sep 2020
Building plan approvalFile: 11.pdf17 Sep 2020
Building plan approvalFile: 12.pdf17 Sep 2020
Building plan approvalFile: 13.pdf17 Sep 2020
Layout approvalFile: 1.pdf17 Sep 2020
Copy of Layout Approval (in case of layout)File: 1.pdf17 Sep 2020
Copy of Layout Approval (in case of layout)File: 1-2.pdf17 Sep 2020
Copy of Layout Approval (in case of layout)File: 2-2.pdf17 Sep 2020

How this compares with Pune

26%of Pune projects moved their completion datethis one moved by 29 months
26%of Pune registrations have lapsed or been cancelledthis one is among them

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Gagan Signet on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near 013,700+ in Pune

2 kmGagan SignetCompleted 66Lapsed / revoked 43Other 56Dot size: filed unitsN

Filed coordinates, straight-line distance. 165 registered projects within 2 km.

Builder: Gagan Realtors LLP

Gagan Realtors LLP has 1 registration on MahaRERA, including Gagan Signet. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What does it mean that Gagan Signet shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if Gagan Signet is delayed beyond 30 Nov 2022?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Gagan Signet?

The registered promoter entity is Gagan Realtors LLP, a partnership as per the filing. Its GSTIN 27AAOFG9135C1ZA can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Gagan Signet?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Gagan Signet?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Gagan Signet?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Gagan Signet?

The professionals named in the filing: Architect: Malwadkar Architects Pvt. Ltd; Architect: Malvadkar Architects; Engineer: Design werkz Engg Pvt.Ltd; Chartered Accountant: Birla & Company; Chartered Accountant: K.G Jhamvar & Co.. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Gagan Signet?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Gagan Signet. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Gagan Signet to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.