Home / Browse projects / Pune, Maharashtra / Gagan Adira Phase 2

Registered Litigation declared Others project

Gagan Adira Phase 2

By TOPAZ HOMES LLP

RG-MH-73342 · RERA P52100053118 · Last updated on MahaRERA portal: 1 May 2026

Source: official MahaRERA filing

Red flags

  • Litigation declared, 2 cases
  • 2 complaints at MahaRERA
  • Rs 25.00 crore secured on the land, in favour of ICICI Home Finance Company Ltd

Clear

  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Aug 2027Possession promisedno revision filed
27 of 44Construction stages doneacross 8 buildings; furthest along: External plumbing and external plaster, 90%
296 of 431Units unsoldnot recorded sold or booked
2Complaints at MahaRERAon this registration
Jump to the 197 documents Report an error

Gagan Adira Phase 2 is a Others project by TOPAZ HOMES LLP in Pune, Maharashtra, registered with MahaRERA as P52100053118 on 16 Oct 2023. Possession is promised by 31 Aug 2027. 135 of the 431 units on this registration are recorded sold or booked, and 27 of 44 construction stages are filed complete. 2 complaints are on record with the regulator.

At a glance

Project

  • NameGagan Adira Phase 2
  • TypeOthers
  • Location
    • GAT No 569 Plot Nos. A1 A2 A3 A4 and A5
    • Wagholi
    • Haveli
    • Pune
    • 412207
  • Pincode412207
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100053118
  • ReraGenie IDRG-MH-73342

Builder

  • NameTOPAZ HOMES LLP
  • Entity typeOthers
  • PartnersRohit Sureshchand Garg, Anuj Rajesh Agarwal, Rahul Sureshchand Garg, Somesh Ramniwas Gupta, Naresh Suganchand Garg
  • Named personsAnshul Naresh Garg, Rohit Sureshchand Garg, Rahul Sureshchand Garg, Naresh Suganchand Garg, M/S Esbee Heights LLP
  • Other registrations1 more →
  • Completed1 of 2

Key dates

this monthRegisteredOct 2023PromisedAug 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on16 Oct 2023
  • Promised completion31 Aug 2027
  • Revised completionNone
  • Buildings8 building records
  • Documents filed197 files

Current status

31%135 of 431 units booked
58.2%Work done, per cost certificate

Figures as on 1 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Building G1NA161349958
Building G2NA161352052
Building H1NA161352052
Building H2NA161352052
Building E1NA161350454
Building E2NA161350454
Building F1NA161350454
Building F2NA161350555

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building8

As on 1 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

27 of 44 construction stages are filed complete across 8 buildings. The stage furthest along is External plumbing and external plaster, at 90%.

Building G1Not stated
ActivityProgress
ExcavationNot applicable
Basement (if any)Not applicable
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/PremisesNot applicable
Sanitary Fittings within the flats / premisesNot applicable
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water TanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.Not applicable
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.Not applicable
Building G2Not stated
ActivityProgress
ExcavationNot applicable
Basement (if any)Not applicable
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/PremisesNot applicable
Sanitary Fittings within the flats / premisesNot applicable
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water TanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.Not applicable
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.Not applicable
Building H1Not stated
ActivityProgress
ExcavationNot applicable
Basement (if any)Not applicable
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/PremisesNot applicable
Sanitary Fittings within the flats / premisesNot applicable
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water TanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.Not applicable
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.Not applicable
Building H2Not stated
ActivityProgress
ExcavationNot applicable
Basement (if any)Not applicable
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/PremisesNot applicable
Sanitary Fittings within the flats / premisesNot applicable
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water TanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.Not applicable
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.Not applicable
Building E178%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises65%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.90%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.5%
Building E278%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises65%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.90%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.5%
Building F176%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises60%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks90%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.80%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.5%
Building F278%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises65%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.85%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.5%

Progress on shared amenities15

As on 1 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes40%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes30%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed405

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots405
Closed/Covered405
BuildingClosed/CoveredTotal
Building G1122122
Building G211
Building H16060
Building H22424
Building E15454
Building E25454
Building F15454
Building F23636

Land and ownership1

MahaRERA does not publish landowner contact details. A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area18,615 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared present
Charge in favour ofICICI Home Finance Company Ltd
Secured amountRs 25.00 crore
CERSAI search filedYes
Declared on24 Jun 2025
LandownerVillageDistrict
Nirmaladevi SatavTanaji NagarPune

Approvals and building plan

Sanctioning authorityPune Metropolitan Regional Development Authority
Permissible FSI56591.45
Proposed, not sanctioned42,947 sq m
Buildings approved9
Buildings sanctioned8

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchOFFICE NO 1 PLOT NO 55 56 57 58 LALWANI PLAZA A WING VIMAN NAGAR PUNE 411014
Estimated costRs 197.43 cr
Cost incurredRs 114.90 cr
Work done58.2%
BuildingWingEstimatedIncurred
-NARs 33.22 crRs 9.00 cr
Building G1NARs 25.16 crRs 10.95 cr
Building F2NARs 23.89 crRs 20.26 cr
Building E1NARs 19.80 crRs 17.41 cr
Building E2NARs 19.80 crRs 17.41 cr
Building F1NARs 19.55 crRs 15.87 cr
Building G2NARs 18.67 crRs 8.13 cr
Building H1NARs 18.67 crRs 7.94 cr
Building H2NARs 18.67 crRs 7.94 cr

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMalwadkar Architects Pvt.Ltd
EngineerNarayan Shelar
Chartered AccountantAgarwal Sarawgi and Associates
Chartered AccountantPatel & Sharma
PartnerRole in project
TOPAZ HOMES LLP-

Litigation declared2

CaseCourtStatus
6929/2012CJSD and additional CJM PuneOngoing
20/2024Commercial court PuneOngoing

Complaints filed with MahaRERA2

Case no.ComplainantRespondentFiled
CC005000000370918Nirmaladevi Prataprao SatavTopaz Homes LLP16/05/2024
CC12501105TOPAZ HOMES LLPMr Ulhas Dilip Sonawane (Individual)02/04/2025

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 21 Mar 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 16 Jul 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 16 Jul 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 23 Jan 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Aug 2027

Documents filed197

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 197 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1_Architect Certificate_QPR4_Topaz.pdf1 May 2026
Withdrawal Update Form 2File: Form 2_Engg Certificate_QPR4_THLLP.pdf1 May 2026
Withdrawal Update Form 3File: Form 3_C A Certificate_QPR4_THLLP COMPRESSED.pdf1 May 2026
Withdrawal Update Form 1File: Form 1 Arch Certificate.pdf17 Feb 2026
Withdrawal Update Form 2File: Form 2 Engg Certificate.pdf17 Feb 2026
Withdrawal Update Form 3File: Form 3 CA Certificate Signed.pdf17 Feb 2026
Withdrawal Update Form 1File: Form 1_Architect Certificate_THLLP_Sep25.pdf31 Dec 2025
Withdrawal Update Form 2File: Form 2_Engg Certificate_THLLP_Sept25.pdf31 Dec 2025
Withdrawal Update Form 3File: FORM 3_CA Certificate_THLLP_Adira_11zon.pdf31 Dec 2025
Form 5 (FY 2024-2025)File: Sign Form 5-Topaz Homes LLP.pdf30 Sep 2025
Withdrawal Update Form 1File: Form 1_Architect Certificate_THLLP.pdf8 Aug 2025
Withdrawal Update Form 1File: Form 1_Architect Certificate_THLLP.pdf8 Aug 2025
Withdrawal Update Form 2File: Form 2- engg certificate_THLLP.pdf8 Aug 2025
Withdrawal Update Form 2File: Form 2- engg certificate_THLLP.pdf8 Aug 2025
Withdrawal Update Form 3File: Final Form 3_0001_11zon.pdf8 Aug 2025
Withdrawal Update Form 3File: Final Form 3_0001_11zon.pdf8 Aug 2025
Layout approvalFile: 00 Page 1 - highLayout_rotated (1).pdf16 Jul 2025
Layout approvalFile: 02 Page 2 - Layout.pdf16 Jul 2025
Building plan approvalFile: 13 page 13 Wing E1.pdf16 Jul 2025
Building plan approvalFile: 14 Page 14 Wing E1.pdf16 Jul 2025
Building plan approvalFile: 15 Page 15 wing E2.pdf16 Jul 2025
Building plan approvalFile: 16 page 16 Wing E2.pdf16 Jul 2025
Building plan approvalFile: 17 Page 17 Wing F1.pdf16 Jul 2025
Building plan approvalFile: 18 Page 18 Wing F1.pdf16 Jul 2025
Building plan approvalFile: 19 Page 19 Wing F2.pdf16 Jul 2025
Building plan approvalFile: 20 Page 20 Wing F2.pdf16 Jul 2025
Building plan approvalFile: 21 Page 21 Wing G1.pdf16 Jul 2025
Building plan approvalFile: 22 Page 22 WIng G1.pdf16 Jul 2025
Building plan approvalFile: 23 Page 23 Wing G2.pdf16 Jul 2025
Building plan approvalFile: 24 Page 24 Wing G2.pdf16 Jul 2025
Building plan approvalFile: 25 Page 25 wing H1.pdf16 Jul 2025
Building plan approvalFile: 26 Page 26 wing H1.pdf16 Jul 2025
Building plan approvalFile: 27 Page 27 Wing H2.pdf16 Jul 2025
Building plan approvalFile: 28 page 28 Wing H2.pdf16 Jul 2025
Building plan approvalFile: 29 Club House.pdf16 Jul 2025
Form 1File: Form 1.pdf10 Jul 2025
Form 2File: form 2 Sep 2024.pdf10 Jul 2025
Form 3File: Form 3.pdf10 Jul 2025
Disclosure of Sold and Booked InventoryFile: Sold-Unsold_THLLP.pdf10 Jul 2025
Form 2A (FY 2024-2025)File: Form 2A_24-25_THLLP.pdf10 Jul 2025
Form 2A (FY 2023-2024)File: Final Form 2A_23-24_THLLP (1).pdf10 Jul 2025
Form 1File: Form 1.pdf8 Jul 2025
Form 2File: Form 2 jan2024.pdf8 Jul 2025
Form 3File: Form 3.pdf8 Jul 2025
Disclosure of Sold and Booked InventoryFile: D-sold unsold.pdf8 Jul 2025
Form 1File: Form 1.pdf8 Jul 2025
Form 2File: Form 2 Apr 24.pdf8 Jul 2025
Form 3File: Form 3.pdf8 Jul 2025
Disclosure of Sold and Booked InventoryFile: D-sold unsold.pdf8 Jul 2025
Form 1File: Form 1.pdf8 Jul 2025
Form 2File: form 2 july 24.pdf8 Jul 2025
Form 3File: Form 3.pdf8 Jul 2025
Disclosure of Sold and Booked InventoryFile: D-sold unsold.pdf8 Jul 2025
Form 1File: Form 1.pdf8 Jul 2025
Form 2File: Form 2 Dec 24.pdf8 Jul 2025
Form 3File: Form 3.pdf8 Jul 2025
Disclosure of Sold and Booked InventoryFile: D-sold unsold.pdf8 Jul 2025
Withdrawal Update Form 1File: Form 1_Architect Certificate_Topaz.pdf30 Jun 2025
Withdrawal Update Form 2File: Form 2_Engineer Certificate Signed.pdf30 Jun 2025
Withdrawal Update Form 3File: 01FORM 3_CA Certificate_THLLP_organized (1).pdf30 Jun 2025
Building plan approvalFile: 13 page 13 Wing E1.pdf28 Jun 2025
Building plan approvalFile: 14 Page 14 Wing E1.pdf28 Jun 2025
Building plan approvalFile: 15 Page 15 wing E2.pdf28 Jun 2025
Building plan approvalFile: 16 page 16 Wing E2.pdf28 Jun 2025
Building plan approvalFile: 17 Page 17 Wing F1.pdf28 Jun 2025
Building plan approvalFile: 18 Page 18 Wing F1.pdf28 Jun 2025
Building plan approvalFile: 19 Page 19 Wing F2.pdf28 Jun 2025
Building plan approvalFile: 20 Page 20 Wing F2.pdf28 Jun 2025
Building plan approvalFile: 21 Page 21 Wing G1.pdf28 Jun 2025
Building plan approvalFile: 22 Page 22 WIng G1.pdf28 Jun 2025
Building plan approvalFile: 23 Page 23 Wing G2.pdf28 Jun 2025
Building plan approvalFile: 24 Page 24 Wing G2.pdf28 Jun 2025
Building plan approvalFile: 25 Page 25 wing H1.pdf28 Jun 2025
Building plan approvalFile: 26 Page 26 wing H1.pdf28 Jun 2025
Building plan approvalFile: 27 Page 27 Wing H2.pdf28 Jun 2025
Building plan approvalFile: 28 page 28 Wing H2.pdf28 Jun 2025
Building plan approvalFile: 29 Club House.pdf28 Jun 2025
Layout approvalFile: 00 Page 1 - highLayout_rotated (1).pdf27 Jun 2025
Layout approvalFile: 02 Page 2 - Layout.pdf27 Jun 2025
Form 1File: Form1_Architect certificate_topaz.pdf16 Jun 2025

How this compares with Pune

31%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Gagan Adira Phase 2 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Wagholi13,700+ in Pune

2 kmGagan Adira Phase 2Completed 67Lapsed / revoked 28Other 38Dot size: filed unitsN

Filed coordinates, straight-line distance. 133 registered projects within 2 km.

Builder: TOPAZ HOMES LLP

Topaz Homes LLP has 2 registrations on MahaRERA, including Gagan Adira Phase 1 and Gagan Adira Phase 2. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Gagan Adira Phase 2 is delayed beyond 31 Aug 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Gagan Adira Phase 2?

The registered promoter entity is TOPAZ HOMES LLP, an others as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Gagan Adira Phase 2?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Gagan Adira Phase 2?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Gagan Adira Phase 2?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Gagan Adira Phase 2?

The professionals named in the filing: Architect: Malwadkar Architects Pvt.Ltd; Engineer: Narayan Shelar; Chartered Accountant: Agarwal Sarawgi and Associates; Chartered Accountant: Patel & Sharma. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Gagan Adira Phase 2?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Gagan Adira Phase 2. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Gagan Adira Phase 2 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.