Freedom Tower Phase III
RG-MH-08003 · RERA P51500017107 · Last updated on MahaRERA portal: 21 Feb 2025
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 2 other registrations.
See what the report covers Free either way: or have every new Aurangabad registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Freedom Tower Phase III is a Residential / Group Housing project by MOTIWALA SQUARE in Aurangabad, Maharashtra, registered with MahaRERA as P51500017107 on 13 Jul 2018. Possession is promised by 30 Dec 2026.
At a glance
Project
- NameFreedom Tower Phase III
- TypeResidential / Group Housing
- Location
- Jawahar Colony Road
- Aakashwani Circle
- Aurangabad (M Corp.)
- Aurangabad
- 431001
- Pincode431001
- RERA no.P51500017107
- ReraGenie IDRG-MH-08003
Builder
- NameMOTIWALA SQUARE
- Entity typePartnership
- PartnerMohammad Atique Mohammed Siddique Motiwala
- Other registrations2 more →
- Completed1 of 3
- No longer live1 lapsed, de-registered or revoked
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on13 Jul 2018
- Promised completion30 Dec 2026
- Revised completionNone
- Buildings2 building records
- Documents filed159 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Building A1 | NA | 12 | 0 | 0 | 0 | 0 |
| Building A2 | NA | 12 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building2
As on 21 Feb 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
18 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Installation of Lifts, at 90%.
Building A190%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 90% |
Building A290%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 90% |
Progress on shared amenities15
As on 21 Feb 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | No | Not applicable |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | Yes | 0% |
Parking filed88
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Total |
|---|---|---|
| Building A1 | 44 | 44 |
| Building A2 | 44 | 44 |
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners1
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Samil Architects |
| Partner | Role in project |
|---|---|
| MOTIWALA SQUARE | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 14 Jun 2018 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 14 Jun 2018 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 25 Jan 2021 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 25 Jan 2021Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 30 Dec 2026
Documents filed159
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 159 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 Phase -3 Dt-01-04-2024 Architech Certificate_0001.pdf | 21 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 Phase -3 -Dt-01-07-2024 Architech Certificate_0001.pdf | 21 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 Phase -3 -Dt-01-10-2024 Architech Certificate_0001.pdf | 21 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 Phase -3 Dt-01-01-2025 Architech Certi_0001.pdf | 21 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 Phase -3Dt-01-04-2024 Engineer Certificate_0001.pdf | 21 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 Phase -3 -Dt-01-07-2024 EngineerCertificate_0001.pdf | 21 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 Phase -3 -Dt-01-10-2025 Engineer Certificate_0001.pdf | 21 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 Phase -3 -Dt-01-01-2025 Engineer Certificate_0001.pdf | 21 Feb 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A-Dt-01-04-2024_0001.pdf | 21 Feb 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A-Dt-01-07-2024_0001.pdf | 21 Feb 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A-Dt-01-10-2024_0001.pdf | 21 Feb 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A-Dt-01-01-2025_0001.pdf | 21 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form no-1 Dt01-07-2023 Phase-3_0001.pdf | 8 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch cet ph-3-SEP 2023.pdf | 8 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT'S CERTIFICATE 3.pdf | 8 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form no-2 Dt1-07-2023 Phase-3_0001.pdf | 8 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Eng crt ph-3 SEP 2023.pdf | 8 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGEERS CERTIFICATE PHASE 3.pdf | 8 Apr 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form no-2A Dt03-07-2023 Phase-3.pdf | 8 Apr 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A Anx-C Ph-3 Sept-23.pdf | 8 Apr 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2A PHASE 3.pdf | 8 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Phase 3 Motiwala Square freedom 3_0001.pdf | 15 Sep 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Phase 3 Motiwala square freedom 3_0002.pdf | 15 Sep 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Motiwala Square quality cer 3_0001.pdf | 15 Sep 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form - 5 - Motiwala Square - 107.pdf | 20 Feb 2023 |
| Disclosure of sold/ booked inventoryFile: Declaration of sold - Phase III DEC 2021.pdf | 12 Feb 2023 |
| Disclosure of sold/ booked inventoryFile: Declaration of sold - Phase III March 2022.pdf | 12 Feb 2023 |
| Disclosure of sold/ booked inventoryFile: Declaration of sold - Phase III JUNE 2022.pdf | 12 Feb 2023 |
| Disclosure of sold/ booked inventoryFile: Declaration of sold - Phase III SEPT 2022.pdf | 12 Feb 2023 |
| Disclosure of sold/ booked inventoryFile: Declaration of sold - Phase III DEC 2022.pdf | 12 Feb 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Archietect Certificate- Phase III - 31-12-2022.pdf | 14 Jan 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate- Phase III- 31-12-2022.pdf | 14 Jan 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: FORM 2A PHASE III- DEC 2022.pdf | 14 Jan 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: FORM 5 - Freedome Tower PHASE 3 2019-20.pdf | 25 Nov 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: FORM 5 - Freedome Tower PHASE 3 2020-21.pdf | 25 Nov 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Archietect Certificate- Phase III - 31-09-2022.pdf | 21 Nov 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate- Phase III- 30-09-2022.pdf | 21 Nov 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: FORM 2A PHASE III- SEPT 2022.pdf | 21 Nov 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FT- Architect Certificate phase III - 30-03-2022.pdf | 4 Aug 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FT- Architect Certificate phase III - 30-06-2022.pdf | 4 Aug 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FT- Engineer Certificate phase III - 30-03-2022.pdf | 4 Aug 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FT- Engineer Certificate phase III - 30-06-2022.pdf | 4 Aug 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FT - FORM 2A Phase III - 30-03-2022.pdf | 4 Aug 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FT - FORM 2A Phase III - 30-06-2022.pdf | 4 Aug 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCH CERT PHASE III -31-03-2022.pdf | 21 Apr 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENG CERT PHASE III -31-03-2022.pdf | 21 Apr 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FORM 2A PHASE III - MARCH 2022.pdf | 21 Apr 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Archietect Certificate- Phase III_0001.pdf | 25 Feb 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate- Phase III_0001.pdf | 25 Feb 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A - Phase III_0001.pdf | 25 Feb 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect certificate - PHASE III_0001.pdf | 30 Nov 2021 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer certificate - PHASE III_0001.pdf | 30 Nov 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FORM NO 2A - PHASE III_0001.pdf | 30 Nov 2021 |
| Disclosure of sold/ booked inventoryFile: Disclosure of sold unit FT phase III.pdf | 1 Sep 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: FT - Phase III - JUNE 2019.pdf | 24 Aug 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: FT - Phase III - SEPT 2019.pdf | 24 Aug 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: FT - Phase III - Dec 2019.pdf | 24 Aug 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: FT - Phase III - MARCH 2020.pdf | 24 Aug 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FT - Phase III - JUNE 2020.pdf | 24 Aug 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FT - Phase III - SEPT 2020.pdf | 24 Aug 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FT - Phase III - Dec 2020.pdf | 24 Aug 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FT - Phase III - MARCH 2021.pdf | 24 Aug 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FT - Phase III - JUNE 2021.pdf | 24 Aug 2021 |
| Certificates of CA (Form 3)File: FORM 3 - CA Cert formate - phase III - Jun20.pdf | 19 Aug 2021 |
| Certificates of CA (Form 3)File: FORM 3 - CA Cert formate - phase III - Sep 20.pdf | 19 Aug 2021 |
| Certificates of CA (Form 3)File: FORM 3 - CA Cert formate - phase III - DEC20.pdf | 19 Aug 2021 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FT phase III Arch Certificate - 31-03-2021.pdf | 10 Aug 2021 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FT phase III Arch Certificate - 30-06-2021.pdf | 10 Aug 2021 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FT phase III Engg Certificate - 31-03-2021.pdf | 10 Aug 2021 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FT phase III Engg Certificate - 30-06-2021.pdf | 10 Aug 2021 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FT- Engg Certificate phase III - 30-06-2020.pdf | 15 May 2021 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FT- Engg Certificate phase III - 30-09-2020.pdf | 15 May 2021 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FT- Engg Certificate phase III - 31-12-2020.pdf | 15 May 2021 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FT- Architect Certificate phase III - 30-06-2020.pdf | 23 Mar 2021 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FT- Architect Certificate phase III - 30-09-2020.pdf | 23 Mar 2021 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FT- Architect Certificate phase III - 31-12-2020.pdf | 23 Mar 2021 |
| Building plan approvalFile: (1' 22) - Lower Basement Parking Layout.PDF | 25 Jan 2021 |
| Building plan approvalFile: (2 '22 ) -Ground Floor and Upper Basement Parking Layout.PDF | 25 Jan 2021 |
| Building plan approvalFile: (3 '22 ) - Upper and Basement Parking Floor Plan - A1 A2 Building.PDF | 25 Jan 2021 |
| Building plan approvalFile: (4 ' 22) - Front Elavation ( A1 A2 Type Building ).PDF | 25 Jan 2021 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Aurangabad
Computed across the 1,400+ Aurangabad projects on ReraGenie, from their own filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against the promoter's 2 other registrations, which the RERA portal never shows together
- All 159 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
- A watch tells you the moment that changes, including if the registration lapses or a complaint is filed
- But on this project's record so far, expect it to be quiet. You can also save this project free and keep it on your shortlist
Keep Freedom Tower Phase III on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Aakashwani Circle1,400+ in Aurangabad
Capital Trade Centre
KRK Landmark LLP
AQ TOWN
AQ INFRASTRUCTURE PRIVATE LIMITED
KALYANI SAI VISHWA
RAJASHREE UDYOG
AMRUT SAI PLAZA PH 2
Shree Amrut Sai Developer Pvt.Ltd
PRASSANA HIGH CLASS CITY PHASE - I
SHRI KRISHNA NAGAR SAHAKARI GRAH NIRMAN SA
SHRIRAM RESIDENCY
UNIQUE BUILDCON
See every Aurangabad project, with the district possession charts
Builder: MOTIWALA SQUARE
MOTIWALA SQUARE has 3 registrations on MahaRERA, including FREEDOM TOWER PHASE I and Freedom Tower Phase II. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Aurangabad district page.
Frequently asked questions
What are my rights if Freedom Tower Phase III is delayed beyond 30 Dec 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Freedom Tower Phase III?
The registered promoter entity is MOTIWALA SQUARE, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Freedom Tower Phase III?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Freedom Tower Phase III?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Freedom Tower Phase III?
The professionals named in the filing: Architect: Samil Architects. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Freedom Tower Phase III?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback