Home / Browse projects / Thane, Maharashtra / FLOWER VALLEY

Registration lapsed No litigation declared Residential / Group Housing project

FLOWER VALLEY

By JAGANI DEVELOPERS

RG-MH-04350 · RERA P51700024317 · Last updated on MahaRERA portal: 13 Oct 2025

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 11 months past the filed date
  • Completion date moved by 24 months
  • 2 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Nov 2025Possession promised11 months past this date
3 of 11Construction stages donefurthest along: Slabs of Super Structure, 90%
26 of 61Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 85 documents Report an error

FLOWER VALLEY is a Residential / Group Housing project by JAGANI DEVELOPERS in Thane, Maharashtra, registered with MahaRERA as P51700024317 on 5 Feb 2020. Possession was promised by 8 Nov 2025 and is now 11 months past that date. The completion date has moved by 24 months from the original filing. 35 of the 61 units on this registration are recorded sold or booked, and 3 of 11 construction stages are filed complete.

At a glance

Project

  • NameFLOWER VALLEY
  • TypeResidential / Group Housing
  • Location
    • KALYAN BHIWANDI ROAD
    • VASUDEV NAGAR
    • kon (CT)
    • Bhiwandi
    • Thane
    • 421311
  • Pincode421311
  • RERA no.P51700024317
  • ReraGenie IDRG-MH-04350

Builder

  • NameJAGANI DEVELOPERS
  • Entity typePartnership
  • PartnersKEVAL KANJI BHANUSHALI, Sanjay Kanji Bhanushali

Key dates

11 months past promisethis monthRegisteredFeb 2020First promiseNov 2023Revised toNov 2025

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on5 Feb 2020
  • Promised completion8 Nov 2025
  • Revised completionRevised to 8 Nov 2025 (originally 9 Nov 2023)
  • Buildings1 building record
  • Documents filed85 files

Current status

57%35 of 61 units booked
60.0%Work done, per cost certificate

Figures as on 13 Oct 2025, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
FLOWER VALLEYNA9761061

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 13 Oct 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

3 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 90%.

FLOWER VALLEY: 54% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor60%
Slabs of Super Structure90%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises25%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks90%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.25%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 13 Oct 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNo0%
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYesNot applicable
Energy managemcntNo0%
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYesNot applicable
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed26

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots26
Closed/Covered1
Open Space25

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area2,120 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on13 Sep 2024
LandownerVillageDistrict
KANKUBAI BABAN BOIRkon (CT)Thane

Approvals and building plan

Sanctioning authorityMMRDA
Permissible FSI3095.5
Proposed, not sanctioned3,096 sq m
Buildings approved2
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchShop No 101 and 102, First Floor, Shri Pragati Royal Atmaram NagarComplex, Kalyan-Bhiwandi Road, Kon Tal Bhiwandi Dist Thane 421311
Estimated costRs 6.13 cr
Cost incurredRs 3.68 cr
Work done59.98%
BuildingWingEstimatedIncurred
FLOWER VALLEYNARs 5.24 crRs 3.68 cr
-NARs 89.35 lakh-

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectR R Consulting Engineers Engineers And surveyors
EngineerR R And Associates Consulting Engineers And Surveyors
Chartered AccountantSwapnesh and Vinit
PartnerRole in project
JAGANI DEVELOPERS-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51700013900Nov 2023 → Nov 2024

Reason as filed by the promoterDUE TO COVID-19 AND PERMISSION DELAY THE PROJECT WAS NOT ABLE TO GET COMPLETED ON TIME. WE WOULD LIKE TO REQUEST YOU TO FURTHER GRANT US EXTENSION FOR 12 MONTHS

EXT51700025014Nov 2023 → Nov 2025

Reason as filed by the promoter1.The processing of loans by customers through their respective banks and financial institutions has also been delayed. This delay has directly impacted their ability to make timely payments towards the project, further delaying its completion. 2.The crises faced by NBFCs and financial institutions, such as IIFL and DHFL, have resulted in a halt in disbursements for customer bookings in our project. This has not only affected the cash flow of the project but has also led to a delay in meeting our commitments to customers.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 8 Oct 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 16 Feb 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 25 Oct 2019
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 16 Feb 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed85

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 85 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: 1_Form-1 Architect Certificate Q1-FY 2025-26.pdf13 Oct 2025
Withdrawal Update Form 2File: 2_Form-2 Engineer Certificate Q1-FY-2025-26.pdf13 Oct 2025
Withdrawal Update Form 3File: 3_Form-3 CA Certificate Q1FY-2025-26.pdf13 Oct 2025
Form 1File: Form-1 - Q4- 31-03-2025.pdf25 Sep 2025
Form 2File: Form-2 -Q4 31-03-2025.pdf25 Sep 2025
Form 3File: 4_Form-3- Q4 FY-2024-25.pdf25 Sep 2025
Disclosure of Sold and Booked InventoryFile: DOS - Q4-31-03-2025.pdf25 Sep 2025
Form 1File: Form 1 - Q3- 15 Feb 2025.pdf24 Aug 2025
Form 2File: Form 2 - Q3 - 17 Feb 2025.pdf24 Aug 2025
Form 3File: 3_Form 3 - Q3 - 26 Feb 2025.pdf24 Aug 2025
Disclosure of Sold and Booked InventoryFile: DOS - Q3 - 31-12-2024.pdf24 Aug 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3_Form 3 - Q3 - 26 Feb 2025.pdf26 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Q3 - 17 Feb 2025.pdf26 Feb 2025
Disclosure of sold/ booked inventoryFile: DOS - Q3 - 31-12-2024.pdf26 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Q3- 15 Feb 2025.pdf17 Feb 2025
Disclosure of sold/ booked inventoryFile: Q2 2024 -Inventory-signed-30-Oct-2024.pdf22 Nov 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest - both.pdf22 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 2_Revised Form 3 - Q2.pdf29 Oct 2024
Disclosure of sold/ booked inventoryFile: DOS - Q2.pdf25 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Q2-signed.pdf24 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 2_Form 3 - Q2.pdf24 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Q2-signed.pdf24 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: 23-24 Form -5 - Signed.pdf11 Oct 2024
Copy of the legal title reportFile: Final Title Certificate.pdf8 Oct 2024
Details of encumbrances concerned to FinanceFile: Encumbrances - Legal and Finance.pdf8 Oct 2024
Proforma of Allotment letterFile: Allotment Letter - Flower valley.pdf8 Oct 2024
Declaration about all RERA Designated Bank Accounts (Format A)File: 1_Format A - Rera Designated Bank Accounts (1).pdf8 Oct 2024
Deviation Report with respect to Allotment letterFile: Deviation Report -Allotment Letter New.pdf8 Oct 2024
Details of encumbrances concerned to LegalFile: Encumbrances - Legal and Finance.pdf8 Oct 2024
Deviation Report with respect to model copy of AgreementFile: Deviation Report -Agreement for Sale.pdf8 Oct 2024
Proforma of Agreement for saleFile: Proforma of AFS.pdf8 Oct 2024
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: 2_Format B - Opening of RERA Designated Bank Accounts0001.pdf8 Oct 2024
Disclosure for secured/unsecured finance availed for the projectFile: 4_Disclosure for secured-unsecured finance availed for the project (1).pdf8 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A Engineer.pdf16 Aug 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Q2 of FY 2023-24-Signed.pdf16 Aug 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Q3 of FY 2023-24-signed.pdf16 Aug 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Q4 of FY 2023-24-Signed.pdf16 Aug 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Q1 of FY 2024-25-Signed.pdf16 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Q2.pdf14 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Q3.pdf14 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Q4.pdf14 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Q1.pdf14 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Q2.pdf14 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Q3.pdf14 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Q4.pdf14 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Q1.pdf14 Aug 2024
Disclosure of sold/ booked inventoryFile: Q2 2023 - Ineventory.pdf14 Aug 2024
Disclosure of sold/ booked inventoryFile: Q3 2023 - Ineventory.pdf14 Aug 2024
Disclosure of sold/ booked inventoryFile: Q4 2024 - Ineventory.pdf14 Aug 2024
Disclosure of sold/ booked inventoryFile: DOS - Q1.pdf14 Aug 2024
Disclosure of sold/ booked inventoryFile: flower valley - inventory.pdf10 Oct 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: jagani engineer form.pdf2 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 - March 23.pdf30 Sep 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 revised april jagani.pdf25 Sep 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 june revised.pdf25 Sep 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 april revised.pdf25 Sep 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 june revised.pdf25 Sep 2023
Disclosure of sold/ booked inventoryFile: disclosure.pdf4 Mar 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 31 03 2020.pdf4 Mar 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 31 03 2021.pdf4 Mar 2023
Layout approvalFile: PLANS 1.pdf16 Feb 2023
Layout approvalFile: PLANS 2.pdf16 Feb 2023
Layout approvalFile: PLANS 3.pdf16 Feb 2023
Copy of Layout Approval (in case of layout)File: PLANS 1.pdf16 Feb 2023
Copy of Layout Approval (in case of layout)File: PLANS 2.pdf16 Feb 2023
Copy of Layout Approval (in case of layout)File: PLANS 3.pdf16 Feb 2023
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf16 Feb 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: form2A FY19-20 (1).pdf16 Feb 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: form 2A FY20-21 (1).pdf16 Feb 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: form2A FY 21-22 (1).pdf16 Feb 2023
Declaration about Commencement CertificateFile: CCdecleration prj Flower Valley.pdf13 Feb 2023
CERSAI detailsFile: Cersaidecleration prj Flower Valley.pdf13 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 Jagani Developers FY 21-22.pdf13 Feb 2023
Details of encumbrancesFile: jagani encumbrance.pdf23 Jan 2020
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA_compressed.pdf23 Jan 2020
Layout approvalFile: 1.pdf25 Oct 2019
Building plan approvalFile: 2.pdf25 Oct 2019
PAN CardFile: jagani pan pdf.pdf25 Oct 2019
Copy of the legal title reportFile: Search Title Certificates.pdf25 Oct 2019
Copy of the legal title reportFile: TITTLE 3.pdf25 Oct 2019

How this compares with Thane

57%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one moved by 24 months
23%of Thane registrations have lapsed or been cancelledthis one is among them

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep FLOWER VALLEY on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near VASUDEV NAGAR7,600+ in Thane

Builder: JAGANI DEVELOPERS

JAGANI DEVELOPERS has 1 registration on MahaRERA, including FLOWER VALLEY. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What does it mean that FLOWER VALLEY shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if FLOWER VALLEY is delayed beyond 8 Nov 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of FLOWER VALLEY?

The registered promoter entity is JAGANI DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in FLOWER VALLEY?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for FLOWER VALLEY?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at FLOWER VALLEY?

The professionals named in the filing: Architect: R R Consulting Engineers Engineers And surveyors; Engineer: R R And Associates Consulting Engineers And Surveyors; Chartered Accountant: Swapnesh and Vinit. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in FLOWER VALLEY?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About FLOWER VALLEY. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save FLOWER VALLEY to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.