Home / Browse projects / Raigarh, Maharashtra / FLORENCE LANDMARK PHASE - 3

Registered No litigation declared Residential / Group Housing project

FLORENCE LANDMARK PHASE - 3

By PALAK DEVELOPERS

RG-MH-06168 · RERA P52000052774 · Last updated on MahaRERA portal: 29 Apr 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 2 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
Dec 2030Possession promisedno revision filed
0 of 22Construction stages doneacross 2 buildings; furthest along: Excavation, 0%
22 of 22Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 62 documents Report an error

FLORENCE LANDMARK PHASE - 3 is a Residential / Group Housing project by PALAK DEVELOPERS in Raigarh, Maharashtra, registered with MahaRERA as P52000052774 on 22 Sep 2023. Possession is promised by 31 Dec 2030. 0 of the 22 units on this registration are recorded sold or booked, and 0 of 22 construction stages are filed complete.

At a glance

Project

  • NameFLORENCE LANDMARK PHASE - 3
  • TypeResidential / Group Housing
  • Location
    • SURVEY NO 71/1/B/1
    • NERAL KARJAT HIGHWAY
    • NEAR SUNRISE RESIDENCY
    • DAMAT
    • Damat
    • Karjat
    • Raigarh
    • 410101
  • Pincode410101
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52000052774
  • ReraGenie IDRG-MH-06168

Builder

  • NamePALAK DEVELOPERS
  • Entity typePartnership
  • GSTIN27AAQFP5870M1ZC
  • GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • PartnersDEEPAK BHAICHAND SHAH, SAHIL LALJIBHAI PANCHALA
  • Other registrations2 more →

Key dates

this monthRegisteredSep 2023PromisedDec 2030

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on22 Sep 2023
  • Promised completion31 Dec 2030
  • Revised completionNone
  • Buildings2 building records
  • Documents filed62 files

Current status

0%0 of 22 units booked

Figures as on 29 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
WING FNA3011011
WING GNA3011011

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 29 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Excavation, at 0%.

WING F0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
WING G0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 29 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed2

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots2
Closed/Covered2
BuildingClosed/CoveredTotal
WING F11
WING G11

Land and ownership15

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area4,261 sq m
Land owned byThe promoter, with other names on the file
Named landowners15
LandownerVillageDistrict
SHAHID KHOTPune (M Corp.)Pune
MALIK KHOTDamatRaigarh
SAQUIB KHOTPune (M Corp.)Pune
MUSADDIQUE KHOTPune (M Corp.)Pune
SABIRA FAKIRA MOHAMMED ALIAS RASHID SHAIKHNeralRaigarh
SHAKILA IMTIYAZ MAULVIKalyanThane
SHOAIB KAZIDamatRaigarh
SAWLEHA KHANChemburMumbai Suburban
RUBINA SHIRSHIKARMhaslaRaigarh
WASEEM NASEEM KHOTDamatRaigarh
MOHAMMED SAMI NASIM KHOTDamatRaigarh
SIMEEN SALMAN SHAIKHMamdapurRaigarh
FAHIM KHOTDamatRaigarh
SHAMIM KHOTDamatRaigarh
KUDASIYA PATELTaloje Panchnad Raigarh

Approvals and building plan

Sanctioning authorityCOLLECTOR ALIBAG
Permissible FSI14993.5
Proposed, not sanctioned1,223 sq m
Buildings approved7
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branch VASHI, NAVI MUMBAI

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectTHE DESIGN INDIA GROUP
EngineerTHE DESIGN INDIA GROUP
Chartered AccountantJAGDISH BHAGAT & CO
Chartered AccountantPRATIK KOTHAWALE
Chartered AccountantJAGDISH CHETANLAL BHAGAT
PartnerRole in project
PALAK DEVELOPERS-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 3 Aug 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 3 Aug 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 21 Jun 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 21 Jun 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2030

Documents filed62

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: FORM 1 Q4 2025-26 PHASE 3.pdf29 Apr 2026
Form 2File: FORM 2 Q4 2025-26 PHASE 3.pdf29 Apr 2026
Form 3File: Palak Dev Ph3 Form 3 Jan-mar26.pdf29 Apr 2026
Disclosure of Sold and Booked InventoryFile: PHASE III Q4 2025-26.pdf29 Apr 2026
Form 1File: FORM 1 PHASE 3 Q2 2025-26.pdf7 Feb 2026
Form 2File: FORM 2 PHASE 3 Q2 2025-26.pdf7 Feb 2026
Form 3File: Palak Phase 03 form 03.pdf7 Feb 2026
Disclosure of Sold and Booked InventoryFile: Disclosure of sold booked and unsold inventory.pdf7 Feb 2026
Form 1File: palak developers phase 3 architect certificate.pdf7 Feb 2026
Form 2File: palak developers phase 3 form2 Engineer Certificate.pdf7 Feb 2026
Form 3File: Florence Phase 03 Form 03 Oct Dec 25 - signed.pdf7 Feb 2026
Disclosure of Sold and Booked InventoryFile: Disclosure of sold booked and unsold inventory.pdf7 Feb 2026
Form 1File: form 1 phase 3 Q1 2025.pdf21 Jul 2025
Form 2File: form 2 phase 3 Q1 2025.pdf21 Jul 2025
Form 3File: palak florence ph 03 - SIGNED FORM 03 APR JUN 25.pdf21 Jul 2025
Disclosure of Sold and Booked InventoryFile: PHASE III unsold sold inventory 2025.pdf21 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 phase III Q4.pdf23 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Phase 03 Florence Form 03 Jan Mar 2025 - signed_compressed.pdf23 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 phase III Q4.pdf23 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: phase III architect certificate.pdf24 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Florence Landmark Ph 03 Q3 FY 24-25 signed.pdf24 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: phase III engineer certificate.pdf24 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE PHASE 3 JUNE 2024.pdf7 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: architect certificate phase 3 SEP 2024.pdf7 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Florence Landmark ph 03 FY 2024-25 q1-signed01_compressed.pdf7 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Florence Landmark Ph 03 Form 03 FY 24-25 Q2 signed A_compressed.pdf7 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE PHAASE 3 JUNE 2024.pdf7 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: engineer certificate phase 3 SEP 2024.pdf7 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE 31 MARCH 2024.pdf1 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE 31 MARCH 2024.pdf1 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Florence Landmark Phase 3 Jan Mar 24 Form 03 (1).pdf1 Jun 2024
Details of encumbrances concerned to FinanceFile: palak partnershipdeed new_compressed.pdf11 Sep 2023
Details of encumbrances concerned to LegalFile: palak partnershipdeed new_compressed.pdf11 Sep 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: palak partnershipdeed new_compressed.pdf11 Sep 2023
Details of encumbrances concerned to FinanceFile: ENCUMBRANCES CONCERN TO FINANCE FINAL.pdf4 Aug 2023
Details of encumbrances concerned to FinanceFile: ENCUMBRANCES CONCERN TO LEGAL FINAL.pdf4 Aug 2023
Details of encumbrances concerned to LegalFile: ENCUMBRANCES CONCERN TO FINANCE FINAL.pdf4 Aug 2023
Details of encumbrances concerned to LegalFile: ENCUMBRANCES CONCERN TO LEGAL FINAL.pdf4 Aug 2023
Declaration about Commencement CertificateFile: COMMENCEMENT CERTIFICATE FORMAT D_compressed.pdf4 Aug 2023
Layout approvalFile: BUILDING LAYOUT.pdf3 Aug 2023
Layout approvalFile: BUILT UP AREA STATEMENT.pdf3 Aug 2023
Copy of the legal title reportFile: LEGAL SEARCH TITLE FINAL FINAL_compressed.pdf3 Aug 2023
Copy of Layout Approval (in case of layout)File: BUILDING LAYOUT.pdf3 Aug 2023
Copy of Layout Approval (in case of layout)File: BUILT UP AREA STATEMENT.pdf3 Aug 2023
Layout approvalFile: PALAK DEV PHASE 03 COPY_compressed.pdf8 Jul 2023
Copy of Layout Approval (in case of layout)File: PALAK DEV PHASE 03 COPY_compressed.pdf8 Jul 2023
CERSAI detailsFile: 1 CERSAI details (3)_compressed.pdf27 Jun 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: 1 Disclosure of Interest in Other Real Estate Organizations (1) sahil panchala_compressed.27 Jun 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: 1 Disclosure of Interest in Other Real Estate Organizations (2) deepak shah_compressed (1)27 Jun 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: 1 Disclosure of Interest in Other Real Estate Organizations (2) dixit shah_compressed (1).27 Jun 2023
Proforma of Allotment letterFile: allotment letter new.pdf27 Jun 2023
Deviation Report with respect to Allotment letterFile: 1 Deviation Report with respect to Allotment letter_compressed.pdf27 Jun 2023
Building plan approvalFile: PHASE 3.pdf21 Jun 2023
PAN CardFile: 1 PAN Card.pdf21 Jun 2023
Building Plan Approval / NA Order for plotted developmentFile: PHASE 3.pdf21 Jun 2023
Commencement Certificates / NA Order for plotted developmentFile: 1 Commencement Certificates _ NA Order for plotted development (1).pdf21 Jun 2023
Declaration in FORM BFile: PALAK P3 Affidavit palak developer PROMOTER FORM B.pdf21 Jun 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RERA PHASE 3 CA CERTIFICATE.pdf21 Jun 2023
Proforma of Agreement for saleFile: AGREEMENT OF SALE FINAL 1.pdf21 Jun 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: palak P3 declaration farmat A.pdf21 Jun 2023
Deviation Report with respect to model copy of AgreementFile: PALAK P3 No deviation in agreement for sale.pdf21 Jun 2023
Other - LegalFile: OTHER LEGAL 1.pdf21 Jun 2023

How this compares with Raigarh

0%of this project is bookeddistrict median 29%
20%of Raigarh projects moved their completion datethis one has not
26%of Raigarh registrations have lapsed or been cancelledthis one is on the register

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep FLORENCE LANDMARK PHASE - 3 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near NEAR SUNRISE RESIDENCY, DAMAT5,900+ in Raigarh

2 kmFLORENCE LANDMARK PHASE Completed 23Lapsed / revoked 17Other 32Dot size: filed unitsN

Filed coordinates, straight-line distance. 72 registered projects within 2 km.

Builder: PALAK DEVELOPERS

PALAK DEVELOPERS has 3 registrations on MahaRERA, including FLORENCE LANDMARK PHASE 1 and FLORENCE LANDMARK PHASE 2. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What are my rights if FLORENCE LANDMARK PHASE - 3 is delayed beyond 31 Dec 2030?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of FLORENCE LANDMARK PHASE - 3?

The registered promoter entity is PALAK DEVELOPERS, a partnership as per the filing. Its GSTIN 27AAQFP5870M1ZC can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in FLORENCE LANDMARK PHASE - 3?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for FLORENCE LANDMARK PHASE - 3?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at FLORENCE LANDMARK PHASE - 3?

The professionals named in the filing: Architect: THE DESIGN INDIA GROUP; Engineer: THE DESIGN INDIA GROUP; Chartered Accountant: JAGDISH BHAGAT & CO; Chartered Accountant: PRATIK KOTHAWALE; Chartered Accountant: JAGDISH CHETANLAL BHAGAT. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in FLORENCE LANDMARK PHASE - 3?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About FLORENCE LANDMARK PHASE - 3. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save FLORENCE LANDMARK PHASE - 3 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.