Registered No litigation declared Residential / Group Housing project

FLORENCE LANDMARK PHASE 2

By PALAK DEVELOPERS

RG-MH-06167 · RERA P52000052599 · Last updated on MahaRERA portal: 30 Apr 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 2 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
Dec 2030Possession promisedno revision filed
0 of 22Construction stages doneacross 2 buildings; furthest along: Excavation, 0%
93 of 93Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 59 documents Report an error

FLORENCE LANDMARK PHASE 2 is a Residential / Group Housing project by PALAK DEVELOPERS in Raigarh, Maharashtra, registered with MahaRERA as P52000052599 on 11 Sep 2023. Possession is promised by 31 Dec 2030. 0 of the 93 units on this registration are recorded sold or booked, and 0 of 22 construction stages are filed complete.

At a glance

Project

  • NameFLORENCE LANDMARK PHASE 2
  • TypeResidential / Group Housing
  • Location
    • SURVEY NO 71/1/B/1
    • NERAL KARJAT HIGHWAY
    • NEAR SUNRISE RESIDENCY
    • DAMAT
    • DAMAT
    • Karjat
    • Raigarh
    • 410101
  • Pincode410101
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52000052599
  • ReraGenie IDRG-MH-06167

Builder

  • NamePALAK DEVELOPERS
  • Entity typePartnership
  • GSTIN27AAQFP5870M1ZC
  • PartnersDEEPAK BHAICHAND SHAH, SAHIL LALJIBHAI PANCHALA
  • Other registrations2 more →

Key dates

this monthRegisteredSep 2023PromisedDec 2030

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on11 Sep 2023
  • Promised completion31 Dec 2030
  • Revised completionNone
  • Buildings2 building records
  • Documents filed59 files

Current status

0%0 of 93 units booked

Figures as on 30 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
WING DNA6049049
WING ENA6044044

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 30 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Excavation, at 0%.

WING D0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
WING E0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 30 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed200

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots200
Closed/Covered200
BuildingClosed/CoveredTotal
WING D100100
WING E100100

Land and ownership15

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area4,967 sq m
Land owned byThe promoter, with other names on the file
Named landowners15
LandownerVillageDistrict
SHAHID SIDDIQUE KHOTPune (M Corp.)Pune
MALIK KHOTDamatRaigarh
SAQUIB KHOTPune (M Corp.)Pune
MUSADDIQUE SIDDIQUE KHOTPune (M Corp.)Pune
SABIRA FARIK MOHAMMED (ALIAS) RASHID SHAIKHNeralRaigarh
SHAKILA MAULIVIKalyanThane
SHOAIB KAZIDamatRaigarh
SAWLEHA IMRAN KHANMumbai CityMumbai City
RUBINA SHIRSHIKARMhaslaRaigarh
WASEEM NASEEM KHOTDamatRaigarh
MOHAMMED SAMI NASIM KHOTDamatRaigarh
SIMEEN SALMAN SHAIKHMamdapurRaigarh
FAHIM MOHAMMED NASEEM KHOTDamatRaigarh
SHAMIM MOHAMMED NASIM KHOTDamatRaigarh
KUDASIYA SHAFIK PATELTaloje Panchnad Raigarh

Approvals and building plan

Sanctioning authorityRAIGAD ALIBAG
Permissible FSI15135.57
Proposed, not sanctioned4,413 sq m
Buildings approved7
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchVASHI , NAVI MUMBAI -400703

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectTHE DESIGN INDIA GROUP
Engineerthe design india group
Chartered AccountantJAGDISH BHAGAT & CO
Chartered AccountantTANVEER BHAGAT
Chartered AccountantPRATIK KOTHAWALE
Chartered AccountantJAGDISH CHETANLAL BHAGAT
PartnerRole in project
PALAK DEVELOPERS-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 21 Jun 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 3 Jul 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 21 Jun 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 21 Jun 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2030

Documents filed59

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: PHASE 2 FORM 1 Q4.pdf30 Apr 2026
Form 2File: phase 2 form 2 Q4.pdf30 Apr 2026
Form 3File: Palak dev Ph2 Form 3 Jan-mar26.pdf30 Apr 2026
Disclosure of Sold and Booked InventoryFile: PHASE II Q4 2025-26 (1).pdf30 Apr 2026
Form 1File: Palak developers Phase 2 form 1 Q2.pdf7 Feb 2026
Form 2File: Palak developers Phase 2 form 2 Q2.pdf7 Feb 2026
Form 3File: Palak developers Phase 2 form 03 Q 2.pdf7 Feb 2026
Disclosure of Sold and Booked InventoryFile: disclosure of sold booked and unsold inventory.pdf7 Feb 2026
Form 1File: florence land mark phase 2 form1.pdf7 Feb 2026
Form 2File: florence land mark phase 2 form2.pdf7 Feb 2026
Form 3File: Florence Phase 02 Form 03 Oct Dec 25 - signed.pdf7 Feb 2026
Disclosure of Sold and Booked InventoryFile: Disclosure of sold booked and unsold inventory.pdf7 Feb 2026
Form 1File: form 1 phase 2 Q1 2025.pdf21 Jul 2025
Form 2File: form 2 phase 2 Q1 2025.pdf21 Jul 2025
Form 3File: palak florence ph 02 - SIGNED form 03 apr jun 25.pdf21 Jul 2025
Disclosure of Sold and Booked InventoryFile: PHASE II unsold sold inventory 2025.pdf21 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 Phase II Q4.pdf23 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Phase 02 Florence Form 03 Jan Mar 2025 - signed_compressed.pdf23 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 phase II Q4.pdf23 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: phase II architect certificate.pdf24 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Florence Landmark Ph 02 Q3 FY 24-25 signed.pdf24 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: phase II engineer certificate.pdf24 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE PHASE 2 JUNE 2024.pdf7 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: architect certificate phase 2 SEP 2024.pdf7 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Florence Landmark Ph 02 FY 2024-25 q1-signed01_compressed.pdf7 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Florence Landmark Ph 02 FY 24-25 q2 signed a.pdf7 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE PHASE 2 JUNE 2024.pdf7 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: engineer certificate phase 2 SEP 2024.pdf7 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE PHASE 2 - 31 MARCH 2024.pdf1 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE PHASE 2 - 31MARCH 2024.pdf1 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Florence Landmark Phase 02 jan mar 2024 form 03.pdf1 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA PALAK.pdf11 Jul 2023
Details of encumbrances concerned to FinanceFile: PALAK P2 No Encumbrance Concern to Finance (1)_compressed.pdf6 Jul 2023
Details of encumbrances concerned to LegalFile: PALAK P2 No Encumbrance Concern to Finance (1)_compressed.pdf6 Jul 2023
CERSAI detailsFile: PALAK P2 REPORT CERSAI_compressed.pdf6 Jul 2023
Layout approvalFile: built up area.pdf3 Jul 2023
Copy of Layout Approval (in case of layout)File: built up area.pdf3 Jul 2023
Layout approvalFile: PALAK DEV PHASE 02 (1) FINAL.pdf27 Jun 2023
Layout approvalFile: PALAK DEV PHASE 02 - COPY 2_compressed (1).pdf27 Jun 2023
Copy of Layout Approval (in case of layout)File: PALAK DEV PHASE 02 (1) FINAL.pdf27 Jun 2023
Copy of Layout Approval (in case of layout)File: PALAK DEV PHASE 02 - COPY 2_compressed (1).pdf27 Jun 2023
Details of encumbrances concerned to FinanceFile: 2 b Details of encumbrances concerned to Legal_compressed.pdf26 Jun 2023
Details of encumbrances concerned to LegalFile: 2 b Details of encumbrances concerned to Legal_compressed.pdf26 Jun 2023
Building plan approvalFile: PHASE 2.pdf21 Jun 2023
PAN CardFile: 1 PAN Card (1).pdf21 Jun 2023
Copy of the legal title reportFile: 1 Copy of the legal title report.pdf21 Jun 2023
Building Plan Approval / NA Order for plotted developmentFile: PHASE 2.pdf21 Jun 2023
Commencement Certificates / NA Order for plotted developmentFile: 1 Commencement Certificates _ NA Order for plotted development.pdf21 Jun 2023
Declaration about Commencement CertificateFile: PALAK P2 Declaration.pdf21 Jun 2023
Declaration in FORM BFile: Affidavit Palak developers PROMOTER FORM B.pdf21 Jun 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: PALAK P2 Annexure A Deepak shah.pdf21 Jun 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: PALAK P2 Annexure A SAHIL PANCHALA.pdf21 Jun 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: PALAK P2 Annexure A Dixit shah.pdf21 Jun 2023
Proforma of Agreement for saleFile: AGREEMENT OF SALE FINAL (1).pdf21 Jun 2023
Proforma of Allotment letterFile: ALLOTMENT LETTER FINAL.pdf21 Jun 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: PALAK P2 FORMAT A Account.pdf21 Jun 2023
Deviation Report with respect to Allotment letterFile: PALAK P2 No deviation in allotment letter.pdf21 Jun 2023
Deviation Report with respect to model copy of AgreementFile: PALAK P2 No deviation in agreement sale.pdf21 Jun 2023
Other - LegalFile: OTHER LEGAL 1.pdf21 Jun 2023

How this compares with Raigarh

0%of this project is bookeddistrict median 29%
20%of Raigarh projects moved their completion datethis one has not
26%of Raigarh registrations have lapsed or been cancelledthis one is on the register

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep FLORENCE LANDMARK PHASE 2 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near DAMAT5,900+ in Raigarh

2 kmFLORENCE LANDMARK PHASE Completed 30Lapsed / revoked 23Other 34Dot size: filed unitsN

Filed coordinates, straight-line distance. 87 registered projects within 2 km.

Builder: PALAK DEVELOPERS

PALAK DEVELOPERS has 3 registrations on MahaRERA, including FLORENCE LANDMARK PHASE 1 and FLORENCE LANDMARK PHASE 2. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What are my rights if FLORENCE LANDMARK PHASE 2 is delayed beyond 31 Dec 2030?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of FLORENCE LANDMARK PHASE 2?

The registered promoter entity is PALAK DEVELOPERS, a partnership as per the filing. Its GSTIN 27AAQFP5870M1ZC can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in FLORENCE LANDMARK PHASE 2?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for FLORENCE LANDMARK PHASE 2?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at FLORENCE LANDMARK PHASE 2?

The professionals named in the filing: Architect: THE DESIGN INDIA GROUP; Engineer: the design india group; Chartered Accountant: JAGDISH BHAGAT & CO; Chartered Accountant: TANVEER BHAGAT; Chartered Accountant: PRATIK KOTHAWALE; Chartered Accountant: JAGDISH CHETANLAL BHAGAT. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in FLORENCE LANDMARK PHASE 2?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About FLORENCE LANDMARK PHASE 2. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save FLORENCE LANDMARK PHASE 2 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.