Home / Browse projects / Raigarh, Maharashtra / FLORENCE LANDMARK PHASE 2
FLORENCE LANDMARK PHASE 2
RG-MH-06167 · RERA P52000052599 · Last updated on MahaRERA portal: 30 Apr 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 2 other registrations and every project registered within 2 km.
See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
FLORENCE LANDMARK PHASE 2 is a Residential / Group Housing project by PALAK DEVELOPERS in Raigarh, Maharashtra, registered with MahaRERA as P52000052599 on 11 Sep 2023. Possession is promised by 31 Dec 2030. 0 of the 93 units on this registration are recorded sold or booked, and 0 of 22 construction stages are filed complete.
At a glance
Project
- NameFLORENCE LANDMARK PHASE 2
- TypeResidential / Group Housing
- Location
- SURVEY NO 71/1/B/1
- NERAL KARJAT HIGHWAY
- NEAR SUNRISE RESIDENCY
- DAMAT
- DAMAT
- Karjat
- Raigarh
- 410101
- Pincode410101
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52000052599
- ReraGenie IDRG-MH-06167
Builder
- NamePALAK DEVELOPERS
- Entity typePartnership
- GSTIN27AAQFP5870M1ZC
- PartnersDEEPAK BHAICHAND SHAH, SAHIL LALJIBHAI PANCHALA
- Other registrations2 more →
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on11 Sep 2023
- Promised completion31 Dec 2030
- Revised completionNone
- Buildings2 building records
- Documents filed59 files
Current status
Figures as on 30 Apr 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| WING D | NA | 6 | 0 | 49 | 0 | 49 |
| WING E | NA | 6 | 0 | 44 | 0 | 44 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building2
As on 30 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
0 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Excavation, at 0%.
WING D0%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
WING E0%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 30 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | Yes | 0% |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | Yes | 0% |
Parking filed200
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Total |
|---|---|---|
| WING D | 100 | 100 |
| WING E | 100 | 100 |
Land and ownership15
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| SHAHID SIDDIQUE KHOT | Pune (M Corp.) | Pune |
| MALIK KHOT | Damat | Raigarh |
| SAQUIB KHOT | Pune (M Corp.) | Pune |
| MUSADDIQUE SIDDIQUE KHOT | Pune (M Corp.) | Pune |
| SABIRA FARIK MOHAMMED (ALIAS) RASHID SHAIKH | Neral | Raigarh |
| SHAKILA MAULIVI | Kalyan | Thane |
| SHOAIB KAZI | Damat | Raigarh |
| SAWLEHA IMRAN KHAN | Mumbai City | Mumbai City |
| RUBINA SHIRSHIKAR | Mhasla | Raigarh |
| WASEEM NASEEM KHOT | Damat | Raigarh |
| MOHAMMED SAMI NASIM KHOT | Damat | Raigarh |
| SIMEEN SALMAN SHAIKH | Mamdapur | Raigarh |
| FAHIM MOHAMMED NASEEM KHOT | Damat | Raigarh |
| SHAMIM MOHAMMED NASIM KHOT | Damat | Raigarh |
| KUDASIYA SHAFIK PATEL | Taloje Panchnad | Raigarh |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners6
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | THE DESIGN INDIA GROUP |
| Engineer | the design india group |
| Chartered Accountant | JAGDISH BHAGAT & CO |
| Chartered Accountant | TANVEER BHAGAT |
| Chartered Accountant | PRATIK KOTHAWALE |
| Chartered Accountant | JAGDISH CHETANLAL BHAGAT |
| Partner | Role in project |
|---|---|
| PALAK DEVELOPERS | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 21 Jun 2023 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 3 Jul 2023 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 21 Jun 2023 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 21 Jun 2023Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2030
Documents filed59
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 1File: PHASE 2 FORM 1 Q4.pdf | 30 Apr 2026 |
| Form 2File: phase 2 form 2 Q4.pdf | 30 Apr 2026 |
| Form 3File: Palak dev Ph2 Form 3 Jan-mar26.pdf | 30 Apr 2026 |
| Disclosure of Sold and Booked InventoryFile: PHASE II Q4 2025-26 (1).pdf | 30 Apr 2026 |
| Form 1File: Palak developers Phase 2 form 1 Q2.pdf | 7 Feb 2026 |
| Form 2File: Palak developers Phase 2 form 2 Q2.pdf | 7 Feb 2026 |
| Form 3File: Palak developers Phase 2 form 03 Q 2.pdf | 7 Feb 2026 |
| Disclosure of Sold and Booked InventoryFile: disclosure of sold booked and unsold inventory.pdf | 7 Feb 2026 |
| Form 1File: florence land mark phase 2 form1.pdf | 7 Feb 2026 |
| Form 2File: florence land mark phase 2 form2.pdf | 7 Feb 2026 |
| Form 3File: Florence Phase 02 Form 03 Oct Dec 25 - signed.pdf | 7 Feb 2026 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of sold booked and unsold inventory.pdf | 7 Feb 2026 |
| Form 1File: form 1 phase 2 Q1 2025.pdf | 21 Jul 2025 |
| Form 2File: form 2 phase 2 Q1 2025.pdf | 21 Jul 2025 |
| Form 3File: palak florence ph 02 - SIGNED form 03 apr jun 25.pdf | 21 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: PHASE II unsold sold inventory 2025.pdf | 21 Jul 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 Phase II Q4.pdf | 23 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Phase 02 Florence Form 03 Jan Mar 2025 - signed_compressed.pdf | 23 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 phase II Q4.pdf | 23 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: phase II architect certificate.pdf | 24 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Florence Landmark Ph 02 Q3 FY 24-25 signed.pdf | 24 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: phase II engineer certificate.pdf | 24 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE PHASE 2 JUNE 2024.pdf | 7 Nov 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: architect certificate phase 2 SEP 2024.pdf | 7 Nov 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Florence Landmark Ph 02 FY 2024-25 q1-signed01_compressed.pdf | 7 Nov 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Florence Landmark Ph 02 FY 24-25 q2 signed a.pdf | 7 Nov 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE PHASE 2 JUNE 2024.pdf | 7 Nov 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: engineer certificate phase 2 SEP 2024.pdf | 7 Nov 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE PHASE 2 - 31 MARCH 2024.pdf | 1 Jun 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE PHASE 2 - 31MARCH 2024.pdf | 1 Jun 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Florence Landmark Phase 02 jan mar 2024 form 03.pdf | 1 Jun 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA PALAK.pdf | 11 Jul 2023 |
| Details of encumbrances concerned to FinanceFile: PALAK P2 No Encumbrance Concern to Finance (1)_compressed.pdf | 6 Jul 2023 |
| Details of encumbrances concerned to LegalFile: PALAK P2 No Encumbrance Concern to Finance (1)_compressed.pdf | 6 Jul 2023 |
| CERSAI detailsFile: PALAK P2 REPORT CERSAI_compressed.pdf | 6 Jul 2023 |
| Layout approvalFile: built up area.pdf | 3 Jul 2023 |
| Copy of Layout Approval (in case of layout)File: built up area.pdf | 3 Jul 2023 |
| Layout approvalFile: PALAK DEV PHASE 02 (1) FINAL.pdf | 27 Jun 2023 |
| Layout approvalFile: PALAK DEV PHASE 02 - COPY 2_compressed (1).pdf | 27 Jun 2023 |
| Copy of Layout Approval (in case of layout)File: PALAK DEV PHASE 02 (1) FINAL.pdf | 27 Jun 2023 |
| Copy of Layout Approval (in case of layout)File: PALAK DEV PHASE 02 - COPY 2_compressed (1).pdf | 27 Jun 2023 |
| Details of encumbrances concerned to FinanceFile: 2 b Details of encumbrances concerned to Legal_compressed.pdf | 26 Jun 2023 |
| Details of encumbrances concerned to LegalFile: 2 b Details of encumbrances concerned to Legal_compressed.pdf | 26 Jun 2023 |
| Building plan approvalFile: PHASE 2.pdf | 21 Jun 2023 |
| PAN CardFile: 1 PAN Card (1).pdf | 21 Jun 2023 |
| Copy of the legal title reportFile: 1 Copy of the legal title report.pdf | 21 Jun 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: PHASE 2.pdf | 21 Jun 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: 1 Commencement Certificates _ NA Order for plotted development.pdf | 21 Jun 2023 |
| Declaration about Commencement CertificateFile: PALAK P2 Declaration.pdf | 21 Jun 2023 |
| Declaration in FORM BFile: Affidavit Palak developers PROMOTER FORM B.pdf | 21 Jun 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: PALAK P2 Annexure A Deepak shah.pdf | 21 Jun 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: PALAK P2 Annexure A SAHIL PANCHALA.pdf | 21 Jun 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: PALAK P2 Annexure A Dixit shah.pdf | 21 Jun 2023 |
| Proforma of Agreement for saleFile: AGREEMENT OF SALE FINAL (1).pdf | 21 Jun 2023 |
| Proforma of Allotment letterFile: ALLOTMENT LETTER FINAL.pdf | 21 Jun 2023 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: PALAK P2 FORMAT A Account.pdf | 21 Jun 2023 |
| Deviation Report with respect to Allotment letterFile: PALAK P2 No deviation in allotment letter.pdf | 21 Jun 2023 |
| Deviation Report with respect to model copy of AgreementFile: PALAK P2 No deviation in agreement sale.pdf | 21 Jun 2023 |
| Other - LegalFile: OTHER LEGAL 1.pdf | 21 Jun 2023 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Raigarh
Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.
Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against the promoter's 2 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 59 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep FLORENCE LANDMARK PHASE 2 on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near DAMAT5,900+ in Raigarh
Filed coordinates, straight-line distance. 87 registered projects within 2 km.
ForeverLand
HOABL IMPACTUM LAND PRIVATE LIMITED
Chitrapatjanak Dadasaheb Phalke Township - Pha
Anukarati Homes Pvt Ltd
Olympeo Neo City
PRIZTINE INFRA LLP
DEEPJYOTI CITY
DeepJyoti Infra
VISION AARAMBH
M/s Vision Aarambh ( AOP )
Olympeo Riverside - Phase 3
Olympeo Riverside Projects LLP
See every Raigarh project, with the district possession charts
Builder: PALAK DEVELOPERS
PALAK DEVELOPERS has 3 registrations on MahaRERA, including FLORENCE LANDMARK PHASE 1 and FLORENCE LANDMARK PHASE 2. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Raigarh district page.
Frequently asked questions
What are my rights if FLORENCE LANDMARK PHASE 2 is delayed beyond 31 Dec 2030?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of FLORENCE LANDMARK PHASE 2?
The registered promoter entity is PALAK DEVELOPERS, a partnership as per the filing. Its GSTIN 27AAQFP5870M1ZC can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in FLORENCE LANDMARK PHASE 2?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for FLORENCE LANDMARK PHASE 2?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at FLORENCE LANDMARK PHASE 2?
The professionals named in the filing: Architect: THE DESIGN INDIA GROUP; Engineer: the design india group; Chartered Accountant: JAGDISH BHAGAT & CO; Chartered Accountant: TANVEER BHAGAT; Chartered Accountant: PRATIK KOTHAWALE; Chartered Accountant: JAGDISH CHETANLAL BHAGAT. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in FLORENCE LANDMARK PHASE 2?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.