FLORENCE LANDMARK PHASE 1

By PALAK DEVELOPERS

RG-MH-05402 · RERA P52000051375 · Last updated on MahaRERA portal: 30 Apr 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 2 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedno revision filed
3 of 33Construction stages doneacross 3 buildings; furthest along: Basement (if any), 0%
186 of 209Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 75 documents Report an error

FLORENCE LANDMARK PHASE 1 is a Others project by PALAK DEVELOPERS in Raigarh, Maharashtra, registered with MahaRERA as P52000051375 on 8 Jun 2023. Possession is promised by 31 Dec 2026. 23 of the 209 units on this registration are recorded sold or booked, and 3 of 33 construction stages are filed complete.

At a glance

Project

  • NameFLORENCE LANDMARK PHASE 1
  • TypeOthers
  • Location
    • SURVEY NO 71/1/B/1
    • NERAL KARJAT HIGHWAY
    • NEAR SUNRISE RESIDENCY
    • DAMAT
    • Damat
    • Karjat
    • Raigarh
    • 410101
  • Pincode410101
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52000051375
  • ReraGenie IDRG-MH-05402

Builder

  • NamePALAK DEVELOPERS
  • Entity typePartnership
  • GSTIN27AAQFP5870M1ZC
  • PartnersDEEPAK BHAICHAND SHAH, SAHIL LALJIBHAI PANCHALA
  • Other registrations2 more →

Key dates

this monthRegisteredJun 2023PromisedDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on8 Jun 2023
  • Promised completion31 Dec 2026
  • Revised completionNone
  • Buildings3 building records
  • Documents filed75 files

Current status

11%23 of 209 units booked

Figures as on 30 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
WING ANA8854862
WING BNA88532477
WING CNA88541670

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 30 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

3 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Basement (if any), at 0%.

WING A9%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
WING B9%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
WING C9%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 30 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed181

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots181
Closed/Covered181
BuildingClosed/CoveredTotal
WING A7373
WING B3535
WING C7373

Land and ownership15

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,452 sq m
Land owned byThe promoter, with other names on the file
Named landowners15
LandownerVillageDistrict
SHAHID SIDDIQUE KHOTPune (M Corp.)Pune
MALIK KHOTNeralRaigarh
SAQUIB KHOTPune (M Corp.)Pune
MUSADDIQUE KHOTPune (M Corp.)Pune
SABIRA FAKIR MOHAMMED (ALIAS ) RASHID SHAIKHNeralRaigarh
SHAKILA MAULIVIKalyanThane
SHOAIB KAZIDamatRaigarh
SAWLEHA IMRAN KHANMumbai CityMumbai City
RUBINA SHIRSHIKARMhaslaRaigarh
WASEEM NASEEM KHOTDamatRaigarh
MOHAMMED SAMI NASIM KHOTDamatRaigarh
SIMEEN SALMAN SHAIKHMamdapurRaigarh
FAHIM MOHAMMED NASEEM KHOTDamatRaigarh
SHAMIM KHOTDamatRaigarh
KUDASIYA SHAFIK PATELMumbai CityMumbai City

Approvals and building plan

Sanctioning authoritycollector alibag
Permissible FSI15135.57
Proposed, not sanctioned9,358 sq m
Buildings approved7
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSECTOR 19 VASHI, NAVI MUMBAI

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectTHE DESIGN INDIA GROUP
EngineerTHE DESIGN INDIA GROUP
Chartered AccountantTANVEER BHAGAT & CO
Chartered AccountantJAGDISH BHAGAT CO
Chartered AccountantTANVEER BHAGAT
Chartered AccountantPRATIK KOTHAWALE
PartnerRole in project
PALAK DEVELOPERS-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 8 Apr 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 15 Apr 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 8 Apr 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 8 Apr 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed75

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: phase 1 form 1 Q4.pdf30 Apr 2026
Form 2File: phase 1 form 2 Q4.pdf30 Apr 2026
Form 3File: palak developers form 3.pdf30 Apr 2026
Disclosure of Sold and Booked InventoryFile: PHASE I Q4 2025-26.pdf30 Apr 2026
Form 1File: florence landmark phase 1 Architect certificate Dec-25.pdf11 Feb 2026
Form 2File: florence land mark Phase 1 Engineer Certificate Dec 25.pdf11 Feb 2026
Form 3File: florence landmark Phase 1 CA certificate Dec 25.pdf11 Feb 2026
Disclosure of Sold and Booked InventoryFile: Dislosure of sold and unsold inventory Dec 25.pdf11 Feb 2026
Form 1File: PALAK DEVELOPERS PHASE I form 1.pdf6 Feb 2026
Form 2File: PALAK DEVELOPERS Q2 PHASE I FORM 2.pdf6 Feb 2026
Form 3File: PALAK DEVELOPERS PHASE I FORM 3.pdf6 Feb 2026
Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD AND UNSOLD INVENTRY.pdf6 Feb 2026
Form 5 (FY 2024-2025)File: florence landmark ph 01 form 05 fy 24-25 - signed_250929_171514.pdf30 Sep 2025
Form 1File: form 1 phase1 Q1 2025.pdf21 Jul 2025
Form 2File: form 2 phase 1 Q1 2025.pdf21 Jul 2025
Form 3File: palak florence ph 01 SIGNED FORM 03 APR JUN 25_compressed.pdf21 Jul 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold inventory 2025 (2).pdf21 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 phase I Q4.pdf23 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Florence Landmark Phase 01 Form 03 Jan Mar 2025_compressed.pdf23 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 phase I Q4.pdf23 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: phase I architect certificate.pdf24 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Florence Landmark Ph 01 Q3 FY 24 25 signed_compressed.pdf24 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: phase I engineer certificate.pdf24 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE PHASE 1 JULLY 2024.pdf7 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: architect certificate phase 1 OCT 2024.pdf7 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Florence Landmark ph 1 Form 03 FY 2024-25 Q1_compressed (1).pdf7 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Florence Landmark Ph 01 Form 03 FY 24-25 Q2 signed a_compressed.pdf7 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE PHASE 1 JULLY 2024.pdf7 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: engineer certificate phase 1 OCT 2024.pdf7 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE - 1APRIL 2024.pdf1 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE - 1 APRIL 2024.pdf1 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Florence landmark phase 1 RERA Form 03 Jan-Mar 2024_compressed.pdf1 Jun 2024
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD LIST NEW_compressed.pdf23 Dec 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 CA CERTIFICATE FINAL.pdf23 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE PHASE 1_compressed.pdf21 Dec 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: palak developers phase 1 Engineer certificate _compressed (1).pdf21 Dec 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 CA CERTIFICATE - PHASE 1.pdf21 Dec 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: FORMAT A BANK DETAILS.pdf19 Dec 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: DEEPAK_SHAH_RERA.pdf26 May 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: DIXIT_SHAH_RERA.pdf26 May 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: SAHIL PANCHAL.pdf26 May 2023
Declaration about Commencement CertificateFile: COMMENCEMENT CERTIFICATE FINAL.pdf25 May 2023
Declaration in FORM BFile: FORM B FINAL.pdf25 May 2023
Proforma of Agreement for saleFile: AGREEMENT OF SALE - PALAK DEVELOPERS.pdf17 May 2023
Other - TechnicalFile: PALAK DEV FOR RERA.pdf28 Apr 2023
Other - TechnicalFile: PALAK DEVFOR RERA 123.pdf28 Apr 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: GetUserDocumentFileContent (4).pdf27 Apr 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 rera damat 21.pdf21 Apr 2023
Other - FinanceFile: LAND DETAILS.pdf21 Apr 2023
Details of encumbrances concerned to FinanceFile: 1 a Details of encumbrances concerned to Finance_compressed.pdf18 Apr 2023
Details of encumbrances concerned to FinanceFile: 2 a Details of encumbrances concerned to LEGAL_compressed (1).pdf18 Apr 2023
Details of encumbrances concerned to LegalFile: 1 a Details of encumbrances concerned to Finance_compressed.pdf18 Apr 2023
Details of encumbrances concerned to LegalFile: 2 a Details of encumbrances concerned to LEGAL_compressed (1).pdf18 Apr 2023
Layout approvalFile: 652952952.pdf15 Apr 2023
Copy of Layout Approval (in case of layout)File: 652952952.pdf15 Apr 2023
Proforma of Allotment letterFile: ALLOTMENT LETTER - PALAK DEVELOPERS.pdf10 Apr 2023
Layout approvalFile: cc 1_7.pdf8 Apr 2023
Building plan approvalFile: cc 2_7.pdf8 Apr 2023
Building plan approvalFile: cc 4_7.pdf8 Apr 2023
Building plan approvalFile: cc 3_7.pdf8 Apr 2023
Building plan approvalFile: cc 5_7.pdf8 Apr 2023
PAN CardFile: palak dev pan card.pdf8 Apr 2023
Copy of the legal title reportFile: search report damat-1-14 final_compressed_compressed.pdf8 Apr 2023
Copy of Layout Approval (in case of layout)File: cc 1_7.pdf8 Apr 2023
Building Plan Approval / NA Order for plotted developmentFile: cc 2_7.pdf8 Apr 2023
Building Plan Approval / NA Order for plotted developmentFile: cc 4_7.pdf8 Apr 2023
Building Plan Approval / NA Order for plotted developmentFile: cc 3_7.pdf8 Apr 2023
Building Plan Approval / NA Order for plotted developmentFile: cc 5_7.pdf8 Apr 2023
Commencement Certificates / NA Order for plotted developmentFile: CC - PALAK(7) (1).pdf8 Apr 2023
CERSAI detailsFile: report form cersal.pdf8 Apr 2023
CERSAI detailsFile: CERSAI_Search_Report_200265663989_For_Asset_Based_Search_08_04_2023_18_20_36_694.pdf8 Apr 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: farmat A.pdf8 Apr 2023
Deviation Report with respect to Allotment letterFile: no deviation in allotment letter.pdf8 Apr 2023
Deviation Report with respect to model copy of AgreementFile: no deviation in agreement plan.pdf8 Apr 2023
Other - LegalFile: partnership deed 2 korudu retire_compressed.pdf8 Apr 2023

How this compares with Raigarh

11%of this project is bookeddistrict median 29%
20%of Raigarh projects moved their completion datethis one has not
26%of Raigarh registrations have lapsed or been cancelledthis one is on the register

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep FLORENCE LANDMARK PHASE 1 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near NEAR SUNRISE RESIDENCY, DAMAT5,900+ in Raigarh

2 kmFLORENCE LANDMARK PHASE Completed 4Lapsed / revoked 2Other 21Dot size: filed unitsN

Filed coordinates, straight-line distance. 27 registered projects within 2 km.

Builder: PALAK DEVELOPERS

PALAK DEVELOPERS has 3 registrations on MahaRERA, including FLORENCE LANDMARK PHASE 1 and FLORENCE LANDMARK PHASE 2. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What are my rights if FLORENCE LANDMARK PHASE 1 is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of FLORENCE LANDMARK PHASE 1?

The registered promoter entity is PALAK DEVELOPERS, a partnership as per the filing. Its GSTIN 27AAQFP5870M1ZC can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in FLORENCE LANDMARK PHASE 1?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for FLORENCE LANDMARK PHASE 1?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at FLORENCE LANDMARK PHASE 1?

The professionals named in the filing: Architect: THE DESIGN INDIA GROUP; Engineer: THE DESIGN INDIA GROUP; Chartered Accountant: TANVEER BHAGAT & CO; Chartered Accountant: JAGDISH BHAGAT CO; Chartered Accountant: TANVEER BHAGAT; Chartered Accountant: PRATIK KOTHAWALE. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in FLORENCE LANDMARK PHASE 1?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About FLORENCE LANDMARK PHASE 1. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save FLORENCE LANDMARK PHASE 1 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.