Home / Browse projects / Nashik, Maharashtra / EVA LUXURIA - ROW HOUSE
EVA LUXURIA - ROW HOUSE
By THAKKARS DEVELOPERS LIMITED
RG-MH-57906 · RERA P51600056081 · Last updated on MahaRERA portal: 30 Jul 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
- All 1 earlier projects delivered on promise
Nothing adverse is on this record. The buyer report still reads the filed documents themselves.
See what the report covers Free either way: or have every new Nashik registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
EVA LUXURIA - ROW HOUSE is a Residential / Group Housing project by THAKKARS DEVELOPERS LIMITED in Nashik, Maharashtra, registered with MahaRERA as P51600056081 on 10 May 2024. Possession is promised by 31 Dec 2027. 3 of the 13 units on this registration are recorded sold or booked, and 4 of 11 construction stages are filed complete.
At a glance
Project
- NameEVA LUXURIA - ROW HOUSE
- TypeResidential / Group Housing
- Location
- TAKLI ROAD
- NASHIK
- 422011
- Pincode422011
- RERA no.P51600056081
- ReraGenie IDRG-MH-57906
Builder
- NameTHAKKARS DEVELOPERS LIMITED
- Entity typeCompany
- DirectorsNARENDRA MANOHARDAS THAKKER, RAJENDRA MANOHARDAS THAKKER, JITENDRA MANOHARDAS THAKKER
- Declared earlier projects1 →
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on10 May 2024
- Promised completion31 Dec 2027
- Revised completionNone
- Buildings1 building record
- Documents filed71 files
Current status
Figures as on 30 Jul 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| EVA LUXURIA - ROW HOUSE | NA | 1 | 1 | 13 | 0 | 13 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 30 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
4 of 11 construction stages are filed complete. The stage furthest along is Stilt Floor, at 95%.
EVA LUXURIA - ROW HOUSE: 67% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 95% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 90% |
| Sanitary Fittings within the flats / premises | 20% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 80% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 50% |
Progress on shared amenities15
As on 30 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 40% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 50% |
| Storm Water Drains | Yes | 90% |
| Landscaping & Tree Planting | No | Not applicable |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed50
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| EVA LUXURIA - ROW HOUSE | NA | Rs 5.50 cr | Rs 3.29 cr |
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | AR NITIN JAYANT KUTE |
| Engineer | ER PRASHANT HARCHAND PATIL |
| Engineer | Sunil Ghodke |
| Chartered Accountant | CA ANGOORI VIPUL BHANDARI |
| Partner | Role in project |
|---|---|
| THAKKARS DEVELOPERS LIMITED | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 2 Nov 2023 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 2 Feb 2024 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 2 Feb 2024 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 30 Oct 2023Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2027
Documents filed71
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Form 1.pdf | 30 Jul 2026 |
| Withdrawal Update Form 2File: Form 2.pdf | 30 Jul 2026 |
| Withdrawal Update Form 3File: Form 3.pdf | 30 Jul 2026 |
| Withdrawal Update Form 1File: Form 1.pdf | 1 Jul 2026 |
| Withdrawal Update Form 1File: Form 1.pdf | 1 Jul 2026 |
| Withdrawal Update Form 2File: Form 2.pdf | 1 Jul 2026 |
| Withdrawal Update Form 2File: Form 2.pdf | 1 Jul 2026 |
| Withdrawal Update Form 3File: Form 3.pdf | 1 Jul 2026 |
| Withdrawal Update Form 3File: Form 3.pdf | 1 Jul 2026 |
| Form 2A (FY 2024-2025)File: EVA ROW HOUSE FORM 2A-ENGINEERIN CERTIFICATE -31-03-2025.pdf | 30 Jun 2026 |
| Form 2A (FY 2025-2026)File: Form 2A-Engineer Certificate Eva Luxuria Row House-Dtd-31-03-2026.pdf | 30 Jun 2026 |
| Withdrawal Update Form 1File: Form 1.pdf | 29 Jun 2026 |
| Withdrawal Update Form 1File: Form 1.pdf | 29 Jun 2026 |
| Withdrawal Update Form 2File: Annexure B Form No 2-Engineer Certificate Eva Luxuria Row House Dt.pdf | 29 Jun 2026 |
| Withdrawal Update Form 2File: Form 2.pdf | 29 Jun 2026 |
| Withdrawal Update Form 3File: Form 3 .pdf | 29 Jun 2026 |
| Withdrawal Update Form 3File: Form 3.pdf | 29 Jun 2026 |
| Form 1File: Origin Architect - Annexure A Form 1 - Architect Certificate dtd-31-03-2025.pdf | 22 Jun 2026 |
| Form 2File: Form 2.pdf | 22 Jun 2026 |
| Form 3File: Form 3.pdf | 22 Jun 2026 |
| Disclosure of Sold and Booked InventoryFile: Sold And Unsold final.pdf | 22 Jun 2026 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 03 EVA ROW HOUSE 2025 03 31.pdf | 19 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: EVA R H FORM 01 2025 02 07.pdf | 8 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: EVA R H FORM 02 2024 12 31.pdf | 8 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: EVA R H FORM 03 2024 12 31.pdf | 28 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 30 9 24.pdf | 16 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: EVA R H FORM 03 20240930_compressed.pdf | 9 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: EVA ROW HOUSES 30 6 2024_compressed.pdf | 23 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: EVA ROW HOUSE 30 6 2024 FORM 3_Compressed.pdf | 23 Jul 2024 |
| Proforma of Agreement for saleFile: 1 Proforma of Agreement for sale LATEST UPLOADED 3 5 24.pdf | 3 May 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Certificate of Financial Progress work of EVA LUXURIA from No 3.pdf | 2 Mar 2024 |
| Details of encumbrances concerned to FinanceFile: Declartion of Encumbrances Conserned To Finance.pdf | 5 Feb 2024 |
| Details of encumbrances concerned to LegalFile: Declartion of Encumbrances Conserned To Finance.pdf | 5 Feb 2024 |
| Layout approvalFile: S No 383-Nashik-Eva Luxuria Row House Layout COMPRESSED.pdf | 2 Feb 2024 |
| Building plan approvalFile: S No 383-Nashik-Eva Luxuria Row House Layout COMPRESSED.pdf | 2 Feb 2024 |
| Copy of Layout Approval (in case of layout)File: S No 383-Nashik-Eva Luxuria Row House Layout COMPRESSED.pdf | 2 Feb 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: S No 383-Nashik-Eva Luxuria Row House Layout COMPRESSED.pdf | 2 Feb 2024 |
| Declaration about Commencement CertificateFile: Declaration About Commement Certificate Format D (1).pdf | 2 Feb 2024 |
| Other - LegalFile: नाशिक शहर - 2_383-2प्लॉट नं1Satbara Eva Luxuria.pdf | 27 Jan 2024 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Eva - Format A (1).pdf | 20 Jan 2024 |
| Building plan approvalFile: Eva - Declaration About Area.pdf | 4 Jan 2024 |
| Details of encumbrances concerned to FinanceFile: Declaration of Legal Encumbrances.pdf | 4 Jan 2024 |
| Details of encumbrances concerned to LegalFile: Declaration of Legal Encumbrances.pdf | 4 Jan 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: Eva - Declaration About Area.pdf | 4 Jan 2024 |
| CERSAI detailsFile: Declaration Undertaking Confirming of no Cersai.pdf | 4 Jan 2024 |
| Proforma of Allotment letterFile: Allotment Letter.pdf | 4 Jan 2024 |
| Other - LegalFile: S No 383-Nashik-Sale Deed-Dtd Compreseed.pdf | 4 Jan 2024 |
| Other - LegalFile: S No 383-Nashik-Correction Deed Compressed.pdf | 4 Jan 2024 |
| Other - TechnicalFile: Eva - Declaration.pdf | 6 Dec 2023 |
| Layout approvalFile: Scan_3535-01_compressed.pdf | 2 Nov 2023 |
| Layout approvalFile: Scan_3536-01_compressed.pdf | 2 Nov 2023 |
| Building plan approvalFile: Scan_3534-01_compressed.pdf | 2 Nov 2023 |
| Building plan approvalFile: Scan_3535-01_compressed.pdf | 2 Nov 2023 |
| Building plan approvalFile: Scan_3536-01_compressed.pdf | 2 Nov 2023 |
| Copy of the legal title reportFile: Format A-Legal Title Report Eva Luxuria Adv Vanikar.pdf | 2 Nov 2023 |
| Copy of Layout Approval (in case of layout)File: Scan_3535-01_compressed.pdf | 2 Nov 2023 |
| Copy of Layout Approval (in case of layout)File: Scan_3536-01_compressed.pdf | 2 Nov 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: Scan_3534-01_compressed.pdf | 2 Nov 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: Scan_3535-01_compressed.pdf | 2 Nov 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: Scan_3536-01_compressed.pdf | 2 Nov 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 sing missing.pdf | 2 Nov 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form No 2 Eva Luxuria.pdf | 2 Nov 2023 |
| CERSAI detailsFile: cersai.pdf | 2 Nov 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: DISCLOSURES-SHRI NARENDRA MANOHARDAS THAKKAR.pdf | 2 Nov 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: DISCLOSURE-SHRI JITENDRA MANOHARDAS THAKKER.pdf | 2 Nov 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: DISCLOSURE-SHREE RAJENDRA MANOHARDAS THAKKER.pdf | 2 Nov 2023 |
| PAN CardFile: AUTHORISED PAN COPY.pdf | 30 Oct 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf | 30 Oct 2023 |
| Declaration in FORM BFile: Declaration in Form B.pdf | 30 Oct 2023 |
| Deviation Report with respect to Allotment letterFile: Declaration OF no Deviation In Model Copy Of Allotment Letter.pdf | 30 Oct 2023 |
| Deviation Report with respect to model copy of AgreementFile: Declaration OF no Deviation In Model Copy Of Agreement.pdf | 30 Oct 2023 |
Promoter's earlier projects1
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| Manohar Arcade | Untwadi Road Near Trimurti Chowk Cidco | 69 | Completed | Jun 2023 | Mar 2022 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Nashik
Computed across the 4,100+ Nashik projects on ReraGenie, from their own filings.
Free monthly report: Nashik on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- All 71 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep EVA LUXURIA - ROW HOUSE on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near NASHIK4,100+ in Nashik
Anandvan Housing Complex
Ravi Mahajan Buildcon LLP
SHREEJI INFINIA
SHREEJI LIFE SPACE
Waterways
Sanklecha Construction Private Limited
Shreejis Gujral Arcade
SHREEJI LIFE SPACE
VRAJ METROPOLIS SOUTH
SHREE INFRA SPACE
ALEEF BREEZE APARTMENT
KHATIB BUILDERS AND DEVELOPERS
See every Nashik project, with the district possession charts
Builder: THAKKARS DEVELOPERS LIMITED
THAKKARS DEVELOPERS LIMITED has 1 registration on MahaRERA, including EVA LUXURIA - ROW HOUSE. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Nashik district page.
Frequently asked questions
What are my rights if EVA LUXURIA - ROW HOUSE is delayed beyond 31 Dec 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of EVA LUXURIA - ROW HOUSE?
The registered promoter entity is THAKKARS DEVELOPERS LIMITED, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in EVA LUXURIA - ROW HOUSE?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for EVA LUXURIA - ROW HOUSE?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at EVA LUXURIA - ROW HOUSE?
The professionals named in the filing: Architect: AR NITIN JAYANT KUTE; Engineer: ER PRASHANT HARCHAND PATIL; Engineer: Sunil Ghodke; Chartered Accountant: CA ANGOORI VIPUL BHANDARI. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in EVA LUXURIA - ROW HOUSE?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback