Home / Browse projects / Pune, Maharashtra / ESSENCIYA

Registered No litigation declared Residential / Group Housing project

ESSENCIYA

By M/S. FLYNIRVANNA BUILDER LLP

RG-MH-27320 · RERA P52100032828 · Last updated on MahaRERA portal: 21 Jul 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 39 months
  • 3 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Jun 2027Possession promisedmoved 39 months from the original
5 of 11Construction stages donefurthest along: Staircases, 90%
20 of 21Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 82 documents Report an error

ESSENCIYA is a Residential / Group Housing project by M/S. FLYNIRVANNA BUILDER LLP in Pune, Maharashtra, registered with MahaRERA as P52100032828 on 2 Feb 2022. Possession is promised by 30 Jun 2027. The completion date has moved by 39 months from the original filing. 1 of the 21 units on this registration are recorded sold or booked, and 5 of 11 construction stages are filed complete.

At a glance

Project

  • NameESSENCIYA
  • TypeResidential / Group Housing
  • Location
    • LULLA NAGAR
    • MUNJERI
    • BIBWEWADI
    • Haveli
    • Pune
    • 411040
  • Pincode411040
  • RERA no.P52100032828
  • ReraGenie IDRG-MH-27320

Builder

  • NameM/S. FLYNIRVANNA BUILDER LLP
  • Entity typePartnership
  • PartnersPANKAJ KALYANI JATKAR, MAYUR GUNDAPPA MANE, KARAN SHIVAJI MANE
  • Other registrations2 more →

Key dates

this monthRegisteredFeb 2022First promiseMar 2024Revised toJun 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on2 Feb 2022
  • Promised completion30 Jun 2027
  • Revised completionRevised to 30 Jun 2027 (originally 20 Mar 2024)
  • Buildings1 building record
  • Documents filed82 files

Current status

5%1 of 21 units booked
96.7%Work done, per cost certificate

Figures as on 21 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
ESSENCIYANA8021021

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 21 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

5 of 11 construction stages are filed complete. The stage furthest along is Staircases, at 90%.

ESSENCIYA: 74% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises70%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks90%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.80%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.70%

Progress on shared amenities15

As on 21 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area586 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on13 Jun 2026
LandownerVillageDistrict
GULMOHAR COMPLEX CO-OPERATIVE HOUSING SOCIETY LTDPune (CB)Pune

Approvals and building plan

Sanctioning authorityPune Municipal Corporation
Permissible FSI2102.82
Proposed, not sanctioned603 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchKANAKDHARA, GR FLOOR,A-11,KASTURBA HSG SOC LTD
Estimated costRs 6.00 cr
Cost incurredRs 5.80 cr
Work done96.67%
BuildingWingEstimatedIncurred
ESSENCIYANARs 5.00 crRs 4.90 cr
-NARs 1.00 crRs 90.00 lakh

Certifying professionals and partners7

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMANOJ TATOOSKAR
ArchitectAJAY KUMAR BATHE
EngineerNIKHIL KAMBLE
EngineerINDRAJIT JAYAWANTRAO PAWAR
Chartered AccountantZAMBAD AND CO
Chartered AccountantNIKHIL BHUTADA
Chartered AccountantVIPIN KHOBRAGADE
PartnerRole in project
M/S. FLYNIRVANNA BUILDER LLP-

Extensions applied for3

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100024261Mar 2024 → Jun 2025

Reason as filed by the promoterdue to labour shortage

EXT52100028421Mar 2024 → Jun 2026

Reason as filed by the promoterLabour shortage

EA21072621814Mar 2024 → Jun 2027

Reason as filed by the promoterDue to labour and funds shortage

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 19 Jan 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 19 Jan 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 19 Jan 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 19 Jan 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Jun 2027

Documents filed82

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 82 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form1 Essenciya.pdf21 Jul 2026
Withdrawal Update Form 2File: Form2 Essenciya.pdf21 Jul 2026
Withdrawal Update Form 3File: Form3 Essenciya.pdf21 Jul 2026
Withdrawal Update Form 1File: Essenciya Form1.pdf27 May 2026
Withdrawal Update Form 2File: Essenciya Form2.pdf27 May 2026
Withdrawal Update Form 3File: Essenciya Form3.pdf27 May 2026
Form 2A (FY 2025-2026)File: Essenciya Form2A.pdf27 May 2026
Form 5 (FY 2025-2026)File: Essenciya Form5.pdf27 May 2026
Form 1File: Essenciya Form1 300625.pdf19 Feb 2026
Form 2File: Essenciya Form2 300625.pdf19 Feb 2026
Form 3File: Essenciya Form3 300625.pdf19 Feb 2026
Disclosure of Sold and Booked InventoryFile: Essenciya sold unsold 300625.pdf19 Feb 2026
Form 1File: Essenciya Form1 300925.pdf19 Feb 2026
Form 2File: Essenciya Form2 300925.pdf19 Feb 2026
Form 3File: Essenciya Form3 300925.pdf19 Feb 2026
Disclosure of Sold and Booked InventoryFile: Essenciya sold unsold 300925.pdf19 Feb 2026
Form 1File: Essenciya Form1 31122025.pdf19 Feb 2026
Form 2File: Essenciya Form2 311225.pdf19 Feb 2026
Form 3File: Essenciya Form3 311225.pdf19 Feb 2026
Disclosure of Sold and Booked InventoryFile: Essenciya sold unsold 311225.pdf19 Feb 2026
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form1 essenciya 300924.pdf9 Jun 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form1 essenciya 310325.pdf9 Jun 2025
Declaration in FORM BFile: Essenciya Builder FormB.pdf6 Jun 2025
Disclosure of sold/ booked inventoryFile: Essenciya sold unsold.pdf6 Jun 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: 2A Essenciya 310325.pdf6 Jun 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2024-25)File: Form5 24-25 Essenciya.pdf6 Jun 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Essenciya architect 311224.pdf4 Jun 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Essenciya Engineer 300624.pdf4 Jun 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Essenciya Engineer 300924.pdf4 Jun 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Essenciya Engineer 311224.pdf4 Jun 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Essenciya Engineer 310325.pdf4 Jun 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: 2A Essenciya 310325.pdf4 Jun 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form3 300624 Essenciya.pdf17 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form3 300924 Essenciya.pdf17 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form3 311224 Essenciya.pdf17 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form3 310325 Essenciya.pdf17 May 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2024-25)File: Form5 24-25 Essenciya.pdf17 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form1 30062024 essenciya.pdf15 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form2 30062024 essenciya.pdf15 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: form2a 23-24 essenciya.pdf15 Jul 2024
Declaration in FORM BFile: formb Landowner.pdf9 Jul 2024
Declaration in FORM BFile: formb Builder.pdf9 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form1 31032023 essenciya.pdf9 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form1 30112023 essenciya.pdf9 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form1 31122023 essenciya.pdf9 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form1 31032024 essenciya.pdf9 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form2 30062023 Essenciya.pdf9 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form2 30092023 Essenciya.pdf9 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form2 31122023 Essenciya.pdf9 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM2 31032024 Essenciya_compressed.pdf9 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: 2A 2022-23 Essenciya.pdf9 Jul 2024
Disclosure of sold/ booked inventoryFile: sold booked essenciya.pdf9 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form3 31032023 essenciya.pdf9 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM3 30062023 essenciya.pdf9 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form3 essenciya 311223.pdf9 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form3 essenciya 310324.pdf9 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM3 30062023 essenciya.pdf9 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form3 essenciya 310324.pdf9 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form3 essenciya 300624.pdf9 Jul 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: form5 2022-23 Essenciya.pdf9 Jul 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: form5 23-24 essenciya.pdf9 Jul 2024
Declaration about all RERA Designated Bank Accounts (Format A)File: Declaration of bank.pdf9 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1- Essenciya Architect Certificate CTS 3399.pdf22 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1- ESSENCIYA.pdf22 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ESSENCIYA RERA FORM 2_compressed.pdf22 Feb 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: ESSENCIYA RERA FORM 2 A_compressed.pdf22 Feb 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: rera-form 3- essenciya_compressed.pdf22 Feb 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Essenciya Certificate of Financial Progress_compressed.pdf22 Feb 2023
Building plan approvalFile: 1 Copy of Layout Approval (in case of layout).pdf19 Jan 2022
Copy of the legal title reportFile: Essenciya Search Report_compressed.pdf19 Jan 2022
Building Plan Approval / NA Order for plotted developmentFile: 1 Copy of Layout Approval (in case of layout).pdf19 Jan 2022
Commencement Certificates / NA Order for plotted developmentFile: CC lullanagar_compressed.pdf19 Jan 2022
CERSAI detailsFile: Essenciya - CERSAI_Search_Report_200228407601_For_Asset_Based_Search_19_01_2022_16_48_57_619 Jan 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: ESSEBCIYA FORM 3_compressed.pdf19 Jan 2022
Layout approvalFile: PLAN (1)_LULLA NAGAR .pdf18 Jan 2022
PAN CardFile: PAN CARD FLYNIRVANAA.pdf18 Jan 2022
Details of encumbrancesFile: Essenciya No Encumbrance.pdf18 Jan 2022
Copy of Layout Approval (in case of layout)File: PLAN (1)_LULLA NAGAR .pdf18 Jan 2022
Declaration about Commencement CertificateFile: Essenciya Declartion.pdf18 Jan 2022
Declaration in FORM BFile: Promoter Declaration Lulla nagar - Essenciya_compressed.pdf18 Jan 2022

How this compares with Pune

5%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one moved by 39 months
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep ESSENCIYA on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near MUNJERI, BIBWEWADI13,700+ in Pune

Builder: M/S. FLYNIRVANNA BUILDER LLP

M/S. FLYNIRVANNA BUILDER LLP has 3 registrations on MahaRERA, including ESSENCIYA and VALENCIYA. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if ESSENCIYA is delayed beyond 30 Jun 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of ESSENCIYA?

The registered promoter entity is M/S. FLYNIRVANNA BUILDER LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in ESSENCIYA?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for ESSENCIYA?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at ESSENCIYA?

The professionals named in the filing: Architect: MANOJ TATOOSKAR; Architect: AJAY KUMAR BATHE; Engineer: NIKHIL KAMBLE; Engineer: INDRAJIT JAYAWANTRAO PAWAR; Chartered Accountant: ZAMBAD AND CO; Chartered Accountant: NIKHIL BHUTADA. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in ESSENCIYA?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About ESSENCIYA. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save ESSENCIYA to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.