Home / Browse projects / Aurangabad, Maharashtra / ESMERALDE BUILDING IB 1 TO 5

Registration lapsed No litigation declared Residential / Group Housing project

ESMERALDE BUILDING IB 1 TO 5

By SHREE KUNDALWAL AND SONS

RG-MH-01353 · RERA P51500011763 · Last updated on MahaRERA portal: 29 Jun 2024

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 25 months past the filed date
  • Completion date moved by 68 months
  • 2 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Aurangabad registration emailed to you, free during the pilot beta.
Sep 2024Possession promised25 months past this date
4 of 11Construction stages donefurthest along: Internal walls, 80%
0Complaints at MahaRERAon this registration
Jump to the 95 documents Report an error

ESMERALDE BUILDING IB 1 TO 5 is a Residential / Group Housing project by SHREE KUNDALWAL AND SONS in Aurangabad, Maharashtra, registered with MahaRERA as P51500011763 on 31 Aug 2017. Possession was promised by 30 Sep 2024 and is now 25 months past that date. The completion date has moved by 68 months from the original filing.

At a glance

Project

  • NameESMERALDE BUILDING IB 1 TO 5
  • TypeResidential / Group Housing
  • Location
    • Paithan Road
    • Nakshatrawadi
    • Aurangabad (M Corp.)
    • Aurangabad
    • 431001
  • Pincode431001
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51500011763
  • ReraGenie IDRG-MH-01353

Builder

  • NameSHREE KUNDALWAL AND SONS
  • Entity typePartnership
  • PartnersRAJENDRA BANSILAL KUNDALWAL, SANJAY BANSILAL KUNDELWAL
  • Other registrations5 more →
  • No longer live5 lapsed, de-registered or revoked

Key dates

25 months past promisethis monthRegisteredAug 2017First promiseJan 2019Revised toSep 2024

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on31 Aug 2017
  • Promised completion30 Sep 2024
  • Revised completionRevised to 30 Sep 2024 (originally 30 Jan 2019)
  • Buildings1 building record
  • Documents filed95 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
IB 1 TO GNA30000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 29 Jun 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 80%.

IB 1 TO G: 60% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises80%
Sanitary Fittings within the flats / premises60%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks60%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.60%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 29 Jun 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes80%
Water SupplyYes80%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsYes100%
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes80%
Open ParkingNoNot applicable

Parking filed10

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots10
Closed/Covered10

Land and ownership6

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area816 sq m
Land owned byThe promoter, with other names on the file
Named landowners6
LandownerVillageDistrict
RAJENDRA KUNDALWALAurangabad (M Corp.)Aurangabad
SANJAY KUNDALWALAurangabad (M Corp.)Aurangabad
SUHAS VAIDYAAurangabad (M Corp.)Aurangabad
SUNITA VAIDYAAurangabad (M Corp.)Aurangabad
KAMALKISHOR BAJAJAurangabad (M Corp.)Aurangabad
VISHNUDAS BAJAJAurangabad (M Corp.)Aurangabad

Approvals and building plan

Permissible FSI3970.09
Proposed, not sanctioned3,970 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchKRANTI CHOWK

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSAMIL ARCHITECTS
EngineerAJAY KOTGIRE
EngineerCORE CANONSUTS
EngineerPrasad Pingle
PartnerRole in project
SHREE KUNDALWAL AND SONS-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51500013771Jan 2019 → Sep 2024

Reason as filed by the promoterLack of Demand and shortage of Fund

EXT51500001401Jan 2019 → Jan 2020

Reason as filed by the promoterAs there is draught situation in Aurangabad which is part of Marathwada, we are delay in completing the work of 4 units, whereas this is bungalow project in which we sold 1 uNit, for which we have received OC and that is fully complete, please allow us extension of 12 months

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 30 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 30 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 30 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 30 Jul 2017Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed95

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 95 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 23-24 Q4 IB 1 to 5.pdf29 Jun 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ib 1 to 5.pdf4 Apr 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: sks IB 1 To 5.pdf20 Mar 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2.pdf8 Mar 2024
Disclosure of sold/ booked inventoryFile: Sold unsold.pdf8 Mar 2024
Certificates of CA (Form 3)File: Form 3.pdf8 Mar 2024
Certificates of CA (Form 3)File: Form 3 30092023 SIGN.pdf4 Jan 2024
Certificates of CA (Form 3)File: 1-5_11zon.pdf27 Dec 2023
Details of encumbrancesFile: No Encumbrance Cert.pdf18 Aug 2023
Details of encumbrances concerned to FinanceFile: Encumbrance To Legal.pdf18 Aug 2023
Details of encumbrances concerned to LegalFile: Encumbrance To Legal.pdf18 Aug 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 IB 1 To 5.pdf18 Aug 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: 2A 20-21.pdf18 Aug 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: 2A 21-22.pdf18 Aug 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: 2A 22-23.pdf18 Aug 2023
Disclosure of sold/ booked inventoryFile: Sold Unsold IB 1 To 5.pdf18 Aug 2023
Certificates of CA (Form 3)File: BUILDING IB 1 TO 5- 31-03-2022_11zon.pdf18 Aug 2023
Certificates of CA (Form 3)File: BUILDING IB 1 TO 5 - 31-12-2022_11zon.pdf18 Aug 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Balkirshna_merged.pdf18 Aug 2023
Proforma of Agreement for saleFile: 1 Proforma of Allotment letter.pdf18 Aug 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Seprate Bank Declaration.pdf18 Aug 2023
Deviation Report with respect to Allotment letterFile: Deviation in Allotment Letter.pdf18 Aug 2023
Deviation Report with respect to model copy of AgreementFile: Deviation in Agreement To Sale.pdf18 Aug 2023
Form 2AFile: Form 2A_IB 1-5_20-21.pdf12 Sep 2022
Form 2AFile: Form 2A_IB 1-5_17-18.pdf12 Sep 2022
Certificates of CA (Form 3)File: IB 1-5_Form 3.pdf12 Sep 2022
Declaration about Commencement CertificateFile: Decl IB 1-5.pdf27 Aug 2022
Form 2AFile: Form 2A_IB 1-5.pdf27 Aug 2022
Certificates of CA (Form 3)File: Form 3_IB 1-5_11zon.pdf22 Aug 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 IB 1-5.pdf24 Sep 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 A IB 1-5_compressed.pdf18 Sep 2021
Form 2AFile: Form 2 A IB 1-5_compressed.pdf18 Sep 2021
Certificates of CA (Form 3)File: BuildingIB 1-5_compressed.pdf18 Sep 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: IB 1-5.pdf18 Sep 2021
Disclosure of sold/ booked inventoryFile: SKS IB 1-5.pdf3 Sep 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: IB 1-5_Final.pdf10 Aug 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: IB 1-5.pdf10 Aug 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: IB 1-5.pdf10 Aug 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Building IB 1-5 Q4 FORM 2A.pdf5 Aug 2021
Certificates of CA (Form 5)File: IB 1-5.pdf5 Aug 2021
Certificates of CA (Form 5)File: IB 1-5.pdf5 Aug 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Building IB 1-5 Q4 Form 1.pdf3 Jun 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Building IB 1-5 Q4 FORM 2.pdf3 Jun 2021
Form 2AFile: Building IB 1-5 Q4 FORM 2A.pdf3 Jun 2021
Certificates of CA (Form 3)File: SodaPDF-compressed-Building IB 1-5 Q4 Form 3_reduce.pdf3 Jun 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ESM IB 1-5 Q1 Form 1 19-20.pdf5 Nov 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ESM IB 1-5 Q2 Form 1 19-20.pdf5 Nov 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ESM IB 1-5 Q3 Form 1 19-20.pdf5 Nov 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ESM IB 1-5 Q1 Form 2 19-20.pdf5 Nov 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ESM IB 1-5 Q2 Form 2 19-20.pdf5 Nov 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ESM IB 1-5 Q3 Form 2 19-20.pdf5 Nov 2020
Form 2AFile: ESM IB 1-5 Q1 Form 2A 19-20.PDF5 Nov 2020
Form 2AFile: ESM IB 1-5 Q2 Form 2A 19-20.PDF5 Nov 2020
Form 2AFile: ESM IB 1-5 Q3 Form 2A 19-20.PDF5 Nov 2020
Certificates of CA (Form 3)File: ESM IB 1-5 Q1 Form 3 19-20.pdf5 Nov 2020
Certificates of CA (Form 3)File: ESM IB 1-5 Q2 Form 3 19-20.pdf5 Nov 2020
Certificates of CA (Form 3)File: ESM IB 1-5 Q3 Form 3 19-20.pdf5 Nov 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: form 1 ib 1-5.pdf11 Aug 2019
Certificates of CA (Form 3)File: FORM 3_Q4_2018-19_IB 1-5 ESM 2.pdf11 Aug 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 IB 1-5.pdf3 Aug 2019
Form 2AFile: Form 2A IB 1-5.pdf3 Aug 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1_Q3_2018-19_ESM IB 1-5.pdf24 Apr 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2_Q3_2018-19_ESM IB 1-5.pdf24 Apr 2019
Form 2AFile: FORM 2A_Q3_2018-19_ESM IB 1-9.pdf24 Apr 2019
Certificates of CA (Form 3)File: IB 1-5.pdf24 Apr 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1_Q1_18-19_ESM IB1-5.pdf3 Jan 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1_Q2_18-19_ESM IB 1-5.pdf3 Jan 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2_Q1_18-19_ESM IB 1-5.pdf3 Jan 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2_Q2_18-19_ESM IB 1-5.pdf3 Jan 2019
Certificates of CA (Form 3)File: FORM 3_Q1_2018-19_ESM IB1-5.pdf3 Jan 2019
Certificates of CA (Form 3)File: FORM 3_Q2_2018-19_IB 1-5.pdf3 Jan 2019
Certificates of CA (Form 3)File: ESMERALDE -IB 1-5-ilovepdf-compressed.pdf15 Oct 2018
Certificates of CA (Form 5)File: Form 5 Esmeralde IB 1-5.pdf15 Oct 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Q3 Esmealde IB 1-5 Arch cert.pdf28 Apr 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Q3 Esmeralde IB 1-5 Engr cert.pdf28 Apr 2018
Certificates of CA (Form 3)File: FORM3 SKS IB 1-5.pdf28 Apr 2018
Certificates of CA (Form 3)File: Form3_Q2_Esmeralde IB 1-5.pdf30 Jan 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ESMERALD IB 1 TO 5 ARC.pdf29 Jan 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Easmerald IB 1 to 5 arch certificate.pdf29 Jan 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ESMERALD IB 1 TO 5.pdf29 Jan 2018

How this compares with Aurangabad

14%of Aurangabad projects moved their completion datethis one moved by 68 months
32%of Aurangabad registrations have lapsed or been cancelledthis one is among them

Computed across the 1,400+ Aurangabad projects on ReraGenie, from their own filings.

Keep ESMERALDE BUILDING IB 1 TO 5 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Nakshatrawadi1,400+ in Aurangabad

2 kmESMERALDE BUILDING IB 1 Completed 4Lapsed / revoked 6Other 16Dot size: filed unitsN

Filed coordinates, straight-line distance. 26 registered projects within 2 km.

Builder: SHREE KUNDALWAL AND SONS

SHREE KUNDALWAL AND SONS has 6 registrations on MahaRERA, including ESMERALDE BUILDING D and ESMERALDE BUILDING C. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Aurangabad district page.

Frequently asked questions

What does it mean that ESMERALDE BUILDING IB 1 TO 5 shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if ESMERALDE BUILDING IB 1 TO 5 is delayed beyond 30 Sep 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of ESMERALDE BUILDING IB 1 TO 5?

The registered promoter entity is SHREE KUNDALWAL AND SONS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in ESMERALDE BUILDING IB 1 TO 5?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for ESMERALDE BUILDING IB 1 TO 5?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at ESMERALDE BUILDING IB 1 TO 5?

The professionals named in the filing: Architect: SAMIL ARCHITECTS; Engineer: AJAY KOTGIRE; Engineer: CORE CANONSUTS; Engineer: Prasad Pingle. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in ESMERALDE BUILDING IB 1 TO 5?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About ESMERALDE BUILDING IB 1 TO 5. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save ESMERALDE BUILDING IB 1 TO 5 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.