ESMERALDE BUILDING B1 B2 IB 6 TO 9
RG-MH-01368 · RERA P51500005342 · Last updated on MahaRERA portal: 29 Jun 2024
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 39 months past the filed date
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Aurangabad registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
ESMERALDE BUILDING B1 B2 IB 6 TO 9 is a Residential / Group Housing project by SHREE KUNDALWAL AND SONS in Aurangabad, Maharashtra, registered with MahaRERA as P51500005342 on 11 Aug 2017. Possession was promised by 31 Jul 2023 and is now 39 months past that date. 2 of the 28 units on this registration are recorded sold or booked, and 8 of 44 construction stages are filed complete.
At a glance
Project
- NameESMERALDE BUILDING B1 B2 IB 6 TO 9
- TypeResidential / Group Housing
- Location
- Paithan Road
- Nakshatrawadi
- Aurangabad (M Corp.)
- Aurangabad
- 431001
- Pincode431001
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51500005342
- ReraGenie IDRG-MH-01368
Builder
- NameSHREE KUNDALWAL AND SONS
- Entity typePartnership
- PartnersRAJENDRA BANSILAL KUNDALWAL, SANJAY BANSILAL KUNDELWAL
- Other registrations5 more →
- No longer live5 lapsed, de-registered or revoked
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on11 Aug 2017
- Promised completion31 Jul 2023
- Revised completionNone
- Buildings4 building records
- Documents filed96 files
Current status
Figures as on 29 Jun 2024, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| BUILDING B 1 | NA | 7 | 7 | 12 | 0 | 12 |
| BUILDING B2 | NA | 7 | 7 | 12 | 0 | 12 |
| BUNGALOW IB 6-7 | NA | 3 | 2 | 2 | 0 | 2 |
| BUNGLOW | NA | 3 | 2 | 2 | 0 | 2 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building4
As on 29 Jun 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
8 of 44 construction stages are filed complete across 4 buildings. The stage furthest along is Excavation, at 21%.
BUILDING B 18%
| Activity | Progress |
|---|---|
| Excavation | 21% |
| Basement (if any) | 21% |
| Podiums (if any) | 0% |
| Plinth | 21% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 10% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 5% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 5% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
BUILDING B28%
| Activity | Progress |
|---|---|
| Excavation | 21% |
| Basement (if any) | 21% |
| Podiums (if any) | 0% |
| Plinth | 21% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 10% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 5% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 5% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
BUNGALOW IB 6-78%
| Activity | Progress |
|---|---|
| Excavation | 21% |
| Basement (if any) | 21% |
| Podiums (if any) | 0% |
| Plinth | 21% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 10% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 5% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 5% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
BUNGLOW73%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 29 Jun 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 80% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | Yes | 100% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 80% |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | No | Not applicable |
Parking filed32
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Total |
|---|---|---|
| BUILDING B 1 | 12 | 12 |
| BUILDING B2 | 12 | 12 |
| BUNGALOW IB 6-7 | 4 | 4 |
| BUNGLOW | 4 | 4 |
Land and ownership6
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| RAJENDRAKUNDALWAL | Aurangabad (M Corp.) | Aurangabad |
| SANJAY KUDELWAL | Aurangabad (M Corp.) | Aurangabad |
| SUHAS VAIDYA | Aurangabad (M Corp.) | Aurangabad |
| SUNITA VAIDYA | Aurangabad (M Corp.) | Aurangabad |
| KAMALKISHOR BAJAJ | Aurangabad (M Corp.) | Aurangabad |
| VISHNUDAS BAJAJ | Aurangabad (M Corp.) | Aurangabad |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners6
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | SHAMIL ARCHITECS |
| Engineer | AJAY KOTGIRE |
| Engineer | CORE CONSULTANTS |
| Engineer | Prasad Pingle |
| Chartered Accountant | SNGP & Company |
| Chartered Accountant | Ashok Patil & Associates |
| Partner | Role in project |
|---|---|
| SHREE KUNDALWAL AND SONS | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 30 Jul 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 30 Jul 2017 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 30 Jul 2017 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 30 Jul 2017Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed96
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 96 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 23-24 Q4.pdf | 29 Jun 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: b1 b2 ib 6 to 9.pdf | 4 Apr 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: sks B1 B2 IB 6 to 9.pdf | 20 Mar 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2.pdf | 8 Mar 2024 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold.pdf | 8 Mar 2024 |
| Certificates of CA (Form 3)File: Form 3.pdf | 8 Mar 2024 |
| Certificates of CA (Form 3)File: Form 3 30092023 NEWSIGN.pdf | 4 Jan 2024 |
| Certificates of CA (Form 3)File: 6-9_11zon.pdf | 27 Dec 2023 |
| Details of encumbrancesFile: Declaration_for_Encumbrances_format.pdf | 19 Aug 2023 |
| Details of encumbrances concerned to FinanceFile: B Details of encumbrances concerned to Legal.pdf | 19 Aug 2023 |
| Details of encumbrances concerned to LegalFile: B Details of encumbrances concerned to Legal.pdf | 19 Aug 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 6 To 9.pdf | 19 Aug 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: 2A 20-21.pdf | 19 Aug 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: 2A 21-22.pdf | 19 Aug 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: 2A 22-23.pdf | 19 Aug 2023 |
| Disclosure of sold/ booked inventoryFile: Sold 6-9.pdf | 19 Aug 2023 |
| Certificates of CA (Form 3)File: BUILDING B1 B2 6 TO 9 31-03-2022.pdf | 19 Aug 2023 |
| Certificates of CA (Form 3)File: BUILDING B1 B2 IB 6 TO 9 31-12-2022.pdf | 19 Aug 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Balkirshna_merged.pdf | 19 Aug 2023 |
| Proforma of Agreement for saleFile: 1 Proforma of Allotment letter (1).pdf | 19 Aug 2023 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Seprate Bank Account Declaration.pdf | 19 Aug 2023 |
| Deviation Report with respect to Allotment letterFile: Deviation Report with respect to Allotment letter.pdf | 19 Aug 2023 |
| Deviation Report with respect to model copy of AgreementFile: Deviation Report with respect to model copy of Agreement.pdf | 19 Aug 2023 |
| Form 2AFile: Form 2A_B1, B2, IB 6-9_20-21.pdf | 12 Sep 2022 |
| Form 2AFile: Form 2A_B1, B2, IB6-9_17-18.pdf | 12 Sep 2022 |
| Certificates of CA (Form 3)File: B1,B2,IB6-9_Form 3.pdf | 12 Sep 2022 |
| Declaration about Commencement CertificateFile: Decl B1 B2 IB6-9.pdf | 27 Aug 2022 |
| Form 2AFile: Form 2A_B1B2 IB6-9.pdf | 27 Aug 2022 |
| Certificates of CA (Form 3)File: Form 3_B1,B2,IB 6-9_11zon.pdf | 22 Aug 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 B1 B2 IB 6-9.pdf | 24 Sep 2021 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 B1 B2 IB 6-9_compressed.pdf | 18 Sep 2021 |
| Form 2AFile: Form 2 B1 B2 IB 6-9_compressed.pdf | 18 Sep 2021 |
| Certificates of CA (Form 3)File: FORM 3 BULDG B-compressed_compressed.pdf | 18 Sep 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: B.pdf | 18 Sep 2021 |
| Disclosure of sold/ booked inventoryFile: SKS B1 B2 IB 6-9.pdf | 3 Sep 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: B1 B2.pdf | 10 Aug 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: B1 B2 IB 6-9.pdf | 10 Aug 2021 |
| Certificates of CA (Form 5)File: B1 B2.pdf | 5 Aug 2021 |
| Certificates of CA (Form 5)File: B1 B2 IB 6-9.pdf | 5 Aug 2021 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Building B1 B2 IB 6-9 Q4 FORM 1.pdf | 3 Jun 2021 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Building B1 B2 IB 6-9 Q4 FORM 2.pdf | 3 Jun 2021 |
| Form 2AFile: Building B1 B2 IB 6-9 Q4 FORM 2A.pdf | 3 Jun 2021 |
| Certificates of CA (Form 3)File: Building B1 B2 IB 6-9 Q4 Form 3 1.pdf | 3 Jun 2021 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ESM B1 B2 IB 6-9 Q2 Form 2 19-20.pdf | 7 Nov 2020 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ESM B1 B2 IB 6-9 Q1 Form 1 19-20.pdf | 5 Nov 2020 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ESM B1 B2 IB 6-9 Q2 Form 1 19-20.pdf | 5 Nov 2020 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ESM B1 B2 IB 6-9 Q3 Form 1 19-20.pdf | 5 Nov 2020 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ESM B1 B2 IB 6-9 Q1 Form 2 19-20.pdf | 5 Nov 2020 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ESM B1 B2 IB 6-9 Q3 Form 2 19-20.pdf | 5 Nov 2020 |
| Form 2AFile: ESM B1 B2 IB 6-9 Q1 Form 2A 19-20_.PDF | 5 Nov 2020 |
| Form 2AFile: ESM B1 B2 IB 6-9 Q2 Form 2A 19-20_.PDF | 5 Nov 2020 |
| Form 2AFile: ESM B1 B2 IB 6-9 Q3 Form 2A 19-20_.PDF | 5 Nov 2020 |
| Certificates of CA (Form 3)File: ESM B1 B2 IB 6-9 Q1 Form 3 19-20.pdf | 5 Nov 2020 |
| Certificates of CA (Form 3)File: ESM B1 B2 IB 6-9 Q2 Form 3 19-20.pdf | 5 Nov 2020 |
| Certificates of CA (Form 3)File: ESM B1 B2 IB 6-9 Q3 Form 3 19-20.pdf | 5 Nov 2020 |
| Certificates of CA (Form 3)File: FORM 3_Q4_2018-19_ESM B1 B2 IB 6-9 2.pdf | 11 Aug 2019 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 B1 B2, IB 6-9.pdf | 3 Aug 2019 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 B1 B2 IB 6-9.pdf | 3 Aug 2019 |
| Form 2AFile: Form 2A B1 B2 IB 6-9.pdf | 3 Aug 2019 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1_Q3_2018-19_ESM B1 B2 IB 6-9.pdf | 24 Apr 2019 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2_Q3_2018-19_ESM B1 B2 IB 6-9.pdf | 24 Apr 2019 |
| Form 2AFile: FORM 2_Q3_2018-19_ESM B1 B2 IB6-9.pdf | 24 Apr 2019 |
| Certificates of CA (Form 3)File: B.pdf | 24 Apr 2019 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1_Q1_18-19_ESM B1,B2,IB6-9.pdf | 3 Jan 2019 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1_Q2_ESM B1,B2,IB 6-9.pdf | 3 Jan 2019 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FOrm 2_Q1_18-19_ESM B1, Br, IB 6-9.pdf | 3 Jan 2019 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2_Q2_18-19_ESM B1,B2,IB6-9.pdf | 3 Jan 2019 |
| Certificates of CA (Form 3)File: Form 3_Q1_2018-19_ESM B1,B2,IB 6-9.pdf | 3 Jan 2019 |
| Certificates of CA (Form 3)File: FORM 3_Q2_2018-19_ESM B1,B2,IB6-9.pdf | 3 Jan 2019 |
| Certificates of CA (Form 3)File: ESMERALDE - B1 B2 IB 6-9-ilovepdf-compressed.pdf | 15 Oct 2018 |
| Certificates of CA (Form 5)File: Form 5 Esmeralde B1,B2,IB6-9.pdf | 15 Oct 2018 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Q3 Esmeralde B1 B2 IB6 9 Arch cert.pdf | 30 Apr 2018 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Q3 Esmeralde B1 B2 IB6-9 engr cert.pdf | 28 Apr 2018 |
| Certificates of CA (Form 3)File: Form3_Q2_Esmeralde B1 B2 IB6-9.pdf | 30 Jan 2018 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Easmarald B1 B2 - arch certificate.pdf | 29 Jan 2018 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ESMERALD B1 B2.pdf | 29 Jan 2018 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Esmerald B1 B2 - Eng certificate.pdf | 29 Jan 2018 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ESMERALD B1 B2 ARC.pdf | 31 Oct 2017 |
| Certificates of CA (Form 3)File: ESMERALDE B1 B2 IB 6-9 pdf.pdf | 31 Oct 2017 |
| Proforma of Allotment letterFile: ATS_Esmeralde_B1B2 IB 6-9.pdf | 31 Jul 2017 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Aurangabad
Computed across the 1,400+ Aurangabad projects on ReraGenie, from their own filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 5 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 96 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
- A watch tells you the moment that changes, including if the registration lapses or a complaint is filed
- But on this project's record so far, expect it to be quiet. You can also save this project free and keep it on your shortlist
Keep ESMERALDE BUILDING B1 B2 IB 6 TO 9 on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Nakshatrawadi1,400+ in Aurangabad
Filed coordinates, straight-line distance. 25 registered projects within 2 km.
Capital Trade Centre
KRK Landmark LLP
AQ TOWN
AQ INFRASTRUCTURE PRIVATE LIMITED
KALYANI SAI VISHWA
RAJASHREE UDYOG
AMRUT SAI PLAZA PH 2
Shree Amrut Sai Developer Pvt.Ltd
PRASSANA HIGH CLASS CITY PHASE - I
SHRI KRISHNA NAGAR SAHAKARI GRAH NIRMAN SA
SHRIRAM RESIDENCY
UNIQUE BUILDCON
See every Aurangabad project, with the district possession charts
Builder: SHREE KUNDALWAL AND SONS
SHREE KUNDALWAL AND SONS has 6 registrations on MahaRERA, including ESMERALDE BUILDING D and ESMERALDE BUILDING C. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Aurangabad district page.
Frequently asked questions
What does it mean that ESMERALDE BUILDING B1 B2 IB 6 TO 9 shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if ESMERALDE BUILDING B1 B2 IB 6 TO 9 is delayed beyond 31 Jul 2023?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of ESMERALDE BUILDING B1 B2 IB 6 TO 9?
The registered promoter entity is SHREE KUNDALWAL AND SONS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in ESMERALDE BUILDING B1 B2 IB 6 TO 9?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for ESMERALDE BUILDING B1 B2 IB 6 TO 9?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at ESMERALDE BUILDING B1 B2 IB 6 TO 9?
The professionals named in the filing: Architect: SHAMIL ARCHITECS; Engineer: AJAY KOTGIRE; Engineer: CORE CONSULTANTS; Engineer: Prasad Pingle; Chartered Accountant: SNGP & Company; Chartered Accountant: Ashok Patil & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in ESMERALDE BUILDING B1 B2 IB 6 TO 9?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback