Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 3 other registrations.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Jun 2026Possession promisedregistration recorded completed
24 of 33Construction stages doneacross 3 buildings; furthest along: Internal walls, 95%
0Complaints at MahaRERAon this registration
Jump to the 63 documents Report an error

EPIC PHASE - 3 is a Residential / Group Housing project by Shivsagar Promoters & Developers in Pune, Maharashtra, registered with MahaRERA as P52100028703 on 25 Mar 2021. The registration is recorded completed; possession was promised by 30 Jun 2026.

At a glance

Project

  • NameEPIC PHASE - 3
  • TypeResidential / Group Housing
  • Location
    • Kesnand Phata
    • Wagholi
    • Haveli
    • Pune
    • 412207
  • Pincode412207
  • RERA no.P52100028703
  • ReraGenie IDRG-MH-17355

Builder

  • NameShivsagar Promoters & Developers
  • Entity typePartnership
  • PartnersNitin Suresh Malpani, Dnyandeo Haribhau Katkar, Niraj Vittaldas Mantri, Devendra Bankatlal Rathi
  • Other registrations3 more →
  • Completed4 of 4
  • Declared earlier projects1 →

Key dates

this monthRegisteredMar 2021PromisedJun 2026Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on25 Mar 2021
  • Promised completion30 Jun 2026
  • Revised completionNone
  • Buildings3 building records
  • Documents filed63 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Building - ENA90000
Building - FNA90000
Building - GNA110000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 18 Nov 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

24 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Internal walls, at 95%.

Building - E88%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises95%
Sanitary Fittings within the flats / premises80%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks95%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.95%
Building - F90%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.95%
Building - G90%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.95%

Progress on shared amenities16

As on 18 Nov 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes95%
Water SupplyYes80%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes90%
Storm Water DrainsYes90%
Landscaping & Tree PlantingYes80%
Street LightingYes60%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes60%
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes80%
Energy managemcntYes80%
Fire protection and fire safety requirementsYes90%
Electrical meter room, sub-station, receiving stationYes95%
Aggregate area of recreational Open SpaceYes90%
Open ParkingYes90%
Swimming PoolYes90%

Parking filed67

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots67
Closed/Covered67
BuildingClosed/CoveredTotal
Building - E44
Building - F2626
Building - G3737

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area7,425 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
Kale Family Thru POA Shivsagar Promoters & Dev.Pune (M Corp.)Pune

Approvals and building plan

Permissible FSI14587.89
Proposed, not sanctioned8,294 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchViman Prestige, Shop No 11, Plot No 87, Viman Nagar, Pune

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSpiro Designs
EngineerSunil Mutalik & Associates
Chartered AccountantAnurag Meherwal and Co
Chartered AccountantSunil Shamrao Nimbalkar
PartnerRole in project
Shivsagar Promoters & Developers-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 22 Mar 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 12 Feb 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 12 Feb 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 12 Feb 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 11 Jan 2024

Documents filed63

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5.pdf18 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5.pdf18 Nov 2024
Architect’s Certificate on Completion of Project (Form 4)File: Epic Ph-3 Form 4 (Completion Certificate).pdf2 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engg Certificate ph 3.pdf24 Jan 2024
Disclosure of sold/ booked inventoryFile: sold unsold inventory Ph 3.pdf24 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Ph 3 CA certificate(2).pdf24 Jan 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: EPIC PH-3 Completion Certificate.pdf11 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ph 3 AC.pdf27 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ph 3 engg certificate.pdf6 Nov 2023
Disclosure of sold/ booked inventoryFile: ph 3 sold unsold inventory.pdf6 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: ph 3 ca certificate.pdf6 Nov 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Shivsagar Promoters Form-5 F Y 2022-23.pdf30 Sep 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate_Epic Phase-3.pdf7 Aug 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engg certi_Epic Phase - 3.pdf7 Aug 2023
Disclosure of sold/ booked inventoryFile: Epic Phase_3_sold_inventory.pdf7 Aug 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate_Epic Phase-3_Upload.pdf7 Aug 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Epic Ph-3_compressed.pdf22 May 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate_Epic Phase-3.pdf19 May 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: engineer_certificate_Ph-3.pdf12 May 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Engineer form_2a_Ph-3.pdf12 May 2023
Disclosure of sold/ booked inventoryFile: Sold unsold_ph-3_compressed.pdf12 May 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 Epic Ph 3 and Ph 4.pdf9 May 2023
Layout approvalFile: Revised Layout.pdf12 Feb 2022
Building plan approvalFile: Revised Plan 1.pdf12 Feb 2022
Building plan approvalFile: Revised Plan 2.pdf12 Feb 2022
Building plan approvalFile: Revised Plan 3.pdf12 Feb 2022
Building plan approvalFile: Revised Plan 4.pdf12 Feb 2022
Building plan approvalFile: Revised Plan 5.pdf12 Feb 2022
Building plan approvalFile: Revised Plan 6.pdf12 Feb 2022
Building plan approvalFile: Revised Plan 7.pdf12 Feb 2022
Copy of Layout Approval (in case of layout)File: Revised Layout.pdf12 Feb 2022
Building Plan Approval / NA Order for plotted developmentFile: Revised Plan 1.pdf12 Feb 2022
Building Plan Approval / NA Order for plotted developmentFile: Revised Plan 2.pdf12 Feb 2022
Building Plan Approval / NA Order for plotted developmentFile: Revised Plan 3.pdf12 Feb 2022
Building Plan Approval / NA Order for plotted developmentFile: Revised Plan 4.pdf12 Feb 2022
Building Plan Approval / NA Order for plotted developmentFile: Revised Plan 5.pdf12 Feb 2022
Building Plan Approval / NA Order for plotted developmentFile: Revised Plan 6.pdf12 Feb 2022
Building Plan Approval / NA Order for plotted developmentFile: Revised Plan 7.pdf12 Feb 2022
Commencement Certificates / NA Order for plotted developmentFile: Final Commencement Certificate (2).pdf12 Feb 2022
Copy of the legal title reportFile: Title Search Report Annexure.pdf22 Mar 2021
Layout approvalFile: Layout.pdf5 Mar 2021
Building plan approvalFile: Plan 1.pdf5 Mar 2021
Building plan approvalFile: Plan 2.pdf5 Mar 2021
Building plan approvalFile: Plan 3.pdf5 Mar 2021
Building plan approvalFile: Plan 4.pdf5 Mar 2021
Building plan approvalFile: Plan 5.pdf5 Mar 2021
Building plan approvalFile: Plan 6.pdf5 Mar 2021
Building plan approvalFile: Plan 7.pdf5 Mar 2021
PAN CardFile: PAN Card.pdf5 Mar 2021
Copy of the legal title reportFile: Title Search Report.pdf5 Mar 2021
Details of encumbrancesFile: Encumbrance Certificate.pdf5 Mar 2021
Copy of Layout Approval (in case of layout)File: Layout.pdf5 Mar 2021
Building Plan Approval / NA Order for plotted developmentFile: Plan 1.pdf5 Mar 2021
Building Plan Approval / NA Order for plotted developmentFile: Plan 2.pdf5 Mar 2021
Building Plan Approval / NA Order for plotted developmentFile: Plan 3.pdf5 Mar 2021
Building Plan Approval / NA Order for plotted developmentFile: Plan 4.pdf5 Mar 2021
Building Plan Approval / NA Order for plotted developmentFile: Plan 5.pdf5 Mar 2021
Building Plan Approval / NA Order for plotted developmentFile: Plan 6.pdf5 Mar 2021
Building Plan Approval / NA Order for plotted developmentFile: Plan 7.pdf5 Mar 2021
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf5 Mar 2021
Declaration in FORM BFile: Form B.pdf5 Mar 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate.pdf5 Mar 2021
Proforma of Allotment letterFile: Draft Agreement.pdf5 Mar 2021

How this compares with Pune

26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep EPIC PHASE - 3 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Wagholi13,700+ in Pune

Builder: Shivsagar Promoters & Developers

SHIVSAGAR PROMOTERS & DEVELOPERS has 4 registrations on MahaRERA, including EPIC PHASE II and EPIC PHASE 1. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if EPIC PHASE - 3 is delayed beyond 30 Jun 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of EPIC PHASE - 3?

The registered promoter entity is Shivsagar Promoters & Developers, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in EPIC PHASE - 3?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for EPIC PHASE - 3?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at EPIC PHASE - 3?

The professionals named in the filing: Architect: Spiro Designs; Engineer: Sunil Mutalik & Associates; Chartered Accountant: Anurag Meherwal and Co; Chartered Accountant: Sunil Shamrao Nimbalkar. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in EPIC PHASE - 3?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About EPIC PHASE - 3. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save EPIC PHASE - 3 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.