ReraGenieLog inGet a buyer report

Home / Browse projects / Pune, Maharashtra / EMPRESS VIEW

Registration lapsed No litigation declared Residential / Group Housing project

EMPRESS VIEW

By Mohit Construction

RG-MH-56965 · RERA P52100053839 · Last updated on MahaRERA portal: 14 Jan 2026

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 7 months past the filed date
  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Mar 2026Possession promised7 months past this date
28 of 33Construction stages doneacross 3 buildings; furthest along: Internal walls, 79%
5 of 58Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 95 documents Report an error

EMPRESS VIEW is a Residential / Group Housing project by Mohit Construction in Pune, Maharashtra, registered with MahaRERA as P52100053839 on 1 Dec 2023. Possession was promised by 30 Mar 2026 and is now 7 months past that date. The completion date has moved by 12 months from the original filing. 53 of the 58 units on this registration are recorded sold or booked, and 28 of 33 construction stages are filed complete.

At a glance

Project

  • NameEMPRESS VIEW
  • TypeResidential / Group Housing
  • Location
    • SOLAPUR ROAD
    • WANAWADI
    • Pune (M Corp.)
    • Pune City
    • Pune
    • 411040
  • Pincode411040
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100053839
  • ReraGenie IDRG-MH-56965

Builder

  • NameMohit Construction
  • Entity typeOthers
  • GSTIN27ATYPJ3014G2ZI
  • ProprietorMohit Ashok Jain Proprietor Mohit Construction Ashok Jain

Key dates

7 months past promisethis monthRegisteredDec 2023First promiseMar 2025Revised toMar 2026

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on1 Dec 2023
  • Promised completion30 Mar 2026
  • Revised completionRevised to 30 Mar 2026 (originally 30 Mar 2025)
  • Buildings3 building records
  • Documents filed95 files

Current status

91%53 of 58 units booked
90.5%Work done, per cost certificate

Figures as on 14 Jan 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
WING -ANA8624024
WING - BNA8624024
WING - CNA7510010

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 14 Jan 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

28 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Internal walls, at 79%.

WING -A100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
WING - B100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
WING - C66%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises79%
Sanitary Fittings within the flats / premises50%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 14 Jan 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes75%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes65%
Electrical meter room, sub-station, receiving stationYes65%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes25%

Parking filed70

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots70
Closed/Covered17
Open Space53
BuildingClosed/CoveredOpen SpaceTotal
WING -A62026
WING - B62026
WING - C51318

Land and ownership5

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,260 sq m
Land owned byThe promoter, with other names on the file
Named landowners5
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on19 Jul 2025
LandownerVillageDistrict
Mohit ConstructionPune (M Corp.)Pune
M/s. Ashoka DevelopersPune (M Corp.)Pune
Sai Properties and DevelopersPune (M Corp.)Pune
Harishchandra Piraji TambePune (M Corp.)Pune
Suhas Piraji TambePune (M Corp.)Pune

Approvals and building plan

Sanctioning authorityPUNE MUNICIPAL CORPORATION
Permissible FSI3372.19
Proposed, not sanctioned3,372 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchUdyog Bhavan, 989, D Buildng, Maharashtra Cultural Centre, Lokmanya Bal Gangadhar Tilak Road, Shukra
Estimated costRs 10.16 cr
Cost incurredRs 9.19 cr
Work done90.53%
BuildingWingEstimatedIncurred
WING -ANARs 4.34 crRs 4.34 cr
WING - BNARs 3.18 crRs 3.18 cr
WING - CNARs 1.84 crRs 1.19 cr
-NARs 78.87 lakhRs 48.09 lakh

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectDeepak M Gadale
ArchitectVIRENDRA SANJAY OSWAL
EngineerMohit Ashok Jain
EngineerDEEPAK MAHADEV GADALE
Chartered AccountantM M Gharpure and Company
Chartered AccountantDILIP VINAYAK PHADTARE
PartnerRole in project
MOHIT CONSTRUCTION-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100027978Mar 2025 → Mar 2026

Reason as filed by the promoterDue to low response at the Project site, we faced difficulties to receive required funds for the Project which lead to delay in work. Due to this financial issue we could not manage to complete the work within the estimated time applied in RERA.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 26 Oct 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 29 Sep 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 10 May 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 10 May 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 25 Mar 2025

Documents filed95

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 95 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 Sai Ashoka.pdf14 Jan 2026
Withdrawal Update Form 2File: Form 2 Sai Ashoka Ventures.pdf14 Jan 2026
Withdrawal Update Form 3File: Form 3 Sai Ashoka Ventures_compressed.pdf14 Jan 2026
Withdrawal Update Form 1File: Form 1 (1).pdf1 Nov 2025
Withdrawal Update Form 2File: Form 2 (3).pdf1 Nov 2025
Withdrawal Update Form 3File: Form 3 (1)_compressed.pdf1 Nov 2025
Withdrawal Update Form 1File: FROM 1 (1).pdf24 Jul 2025
Withdrawal Update Form 2File: From 2.pdf24 Jul 2025
Withdrawal Update Form 3File: From 3 (2).pdf24 Jul 2025
Declaration in FORM BFile: FORM B (3).pdf16 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 (4).pdf16 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf16 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 (3).pdf16 Apr 2025
Disclosure of sold/ booked inventoryFile: BOOKED INVENTORY.pdf16 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A.pdf16 Apr 2025
Disclosure of sold/ booked inventoryFile: Sold Booked Inventory.pdf7 Apr 2025
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Occupancy Certificate Part 6_compressed.pdf25 Mar 2025
Other - TechnicalFile: Occupancy Certificate Part 7_compressed.pdf25 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf3 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf3 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf3 Feb 2025
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OCC 1040.pdf3 Feb 2025
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OCC 1153.pdf3 Feb 2025
Disclosure of sold/ booked inventoryFile: sold inventory.pdf3 Feb 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5.pdf3 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 sept end-compressed.pdf18 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1_compressed.pdf17 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf17 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3_compressed.pdf17 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 (1)_compressed.pdf17 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2.pdf17 Oct 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OCC Part 2.pdf17 Oct 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OCC Part 3.pdf17 Oct 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory.pdf17 Oct 2024
Building plan approvalFile: 1 (13).pdf10 May 2024
Building plan approvalFile: 2 (3).pdf10 May 2024
Building plan approvalFile: 3 (2).pdf10 May 2024
Building plan approvalFile: 4 (1).pdf10 May 2024
Building Plan Approval / NA Order for plotted developmentFile: 1 (13).pdf10 May 2024
Building Plan Approval / NA Order for plotted developmentFile: 2 (3).pdf10 May 2024
Building Plan Approval / NA Order for plotted developmentFile: 3 (2).pdf10 May 2024
Building Plan Approval / NA Order for plotted developmentFile: 4 (1).pdf10 May 2024
Commencement Certificates / NA Order for plotted developmentFile: CC.pdf10 May 2024
Declaration about Commencement CertificateFile: DECLARATION ABOUT.pdf10 May 2024
Declaration about Commencement CertificateFile: DECLARATION CC.pdf10 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 MARCH 2024.pdf10 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 DEC 2023.pdf10 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 DEC 2023.pdf10 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 MARCH 2024.pdf10 May 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: QAC.pdf10 May 2024
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD MARCH 24.pdf10 May 2024
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD OCT 23 TO DEC 23.pdf10 May 2024
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD MARCH 24.pdf10 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 DEC 23_compressed.pdf10 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 MARCH 24_compressed.pdf10 May 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OCC.pdf10 May 2024
Other - LegalFile: Self declaration Propreitor.pdf23 Nov 2023
Other - FinanceFile: cersai report.pdf23 Nov 2023
Other - TechnicalFile: scan 3.pdf23 Nov 2023
Building plan approvalFile: scan 3.pdf22 Nov 2023
Building Plan Approval / NA Order for plotted developmentFile: scan 3.pdf22 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 21 11 2023_compressed.pdf22 Nov 2023
Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory.pdf21 Nov 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Bank Declaration.pdf20 Nov 2023
Proforma of Agreement for saleFile: AFS RERA Format.pdf28 Oct 2023
Copy of the legal title reportFile: Legal Title and Flow of Title_compressed (1).pdf26 Oct 2023
Copy of the legal title reportFile: Search Report and Title Certificate_compressed.pdf26 Oct 2023
Deviation Report with respect to Allotment letterFile: Mohit Deviation Allotment letter.pdf14 Oct 2023
Deviation Report with respect to model copy of AgreementFile: Mohit Deviation Agreement for sales.pdf14 Oct 2023
Details of encumbrances concerned to FinanceFile: FINANCE.pdf5 Oct 2023
Details of encumbrances concerned to FinanceFile: LEGAL.pdf5 Oct 2023
Details of encumbrances concerned to LegalFile: FINANCE.pdf5 Oct 2023
Details of encumbrances concerned to LegalFile: LEGAL.pdf5 Oct 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: INTREST IN OTHER PROJECTS_compressed.pdf2 Oct 2023
Layout approvalFile: Amalgamation_compressed.pdf29 Sep 2023
Building plan approvalFile: scan 12_compressed.pdf29 Sep 2023
Building plan approvalFile: scan 13 (1)_compressed.pdf29 Sep 2023
Building plan approvalFile: scan 14_compressed.pdf29 Sep 2023
Building plan approvalFile: scan 15_compressed.pdf29 Sep 2023
PAN CardFile: Mohit jain pan card.pdf29 Sep 2023

How this compares with Pune

91%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one moved by 12 months
26%of Pune registrations have lapsed or been cancelledthis one is among them

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep EMPRESS VIEW on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near WANAWADI13,700+ in Pune

2 kmEMPRESS VIEWCompleted 15Lapsed / revoked 6Other 22Dot size: filed unitsN

Filed coordinates, straight-line distance. 43 registered projects within 2 km.

Builder: Mohit Construction

Mohit Construction has 1 registration on MahaRERA, including EMPRESS VIEW. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What does it mean that EMPRESS VIEW shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if EMPRESS VIEW is delayed beyond 30 Mar 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of EMPRESS VIEW?

The registered promoter entity is Mohit Construction, an others as per the filing. Its GSTIN 27ATYPJ3014G2ZI can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in EMPRESS VIEW?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for EMPRESS VIEW?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at EMPRESS VIEW?

The professionals named in the filing: Architect: Deepak M Gadale; Architect: VIRENDRA SANJAY OSWAL; Engineer: Mohit Ashok Jain; Engineer: DEEPAK MAHADEV GADALE; Chartered Accountant: M M Gharpure and Company; Chartered Accountant: DILIP VINAYAK PHADTARE. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in EMPRESS VIEW?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About EMPRESS VIEW. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save EMPRESS VIEW to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.