ReraGenieLog inGet a buyer report

Home / Browse projects / Nagpur, Maharashtra / EMPRESS DREAMS

Registered No litigation declared Residential / Group Housing project

EMPRESS DREAMS

By KAUSHAL LOGISTICS PRIVATE LIMITED

RG-MH-00488 · RERA P50500012169 · Last updated on MahaRERA portal: 14 Jul 2026

Source: official MahaRERA filing

Red flags

  • 2 complaints at MahaRERA
  • Completion date moved by 54 months
  • 1 extension taken

Clear

  • No litigation declared
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Nagpur registration emailed to you, free during the pilot beta.
Jun 2030Possession promisedmoved 54 months from the original
20 of 22Construction stages doneacross 2 buildings; furthest along: Installation of Lifts, 95%
0 of 140Units unsoldnot recorded sold or booked
2Complaints at MahaRERAon this registration
Jump to the 50 documents Report an error

EMPRESS DREAMS is a Residential / Group Housing project by KAUSHAL LOGISTICS PRIVATE LIMITED in Nagpur, Maharashtra, registered with MahaRERA as P50500012169 on 1 Sep 2017. Possession is promised by 30 Jun 2030. The completion date has moved by 54 months from the original filing. 140 of the 140 units on this registration are recorded sold or booked, and 20 of 22 construction stages are filed complete. 2 complaints are on record with the regulator.

At a glance

Project

  • NameEMPRESS DREAMS
  • TypeResidential / Group Housing
  • Location
    • Salvav
    • Nagpur (M Corp.)
    • Nagpur (Urban)
    • Nagpur
    • 440018
  • Pincode440018
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P50500012169
  • ReraGenie IDRG-MH-00488

Builder

  • NameKAUSHAL LOGISTICS PRIVATE LIMITED
  • Entity typeCompany
  • Managing DirectorSUBHASH CHANDRA NIGAM

Key dates

this monthRegisteredSep 2017First promiseDec 2025Revised toJun 2030

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on1 Sep 2017
  • Promised completion30 Jun 2030
  • Revised completionRevised to 30 Jun 2030 (originally 30 Dec 2025)
  • Buildings2 building records
  • Documents filed50 files

Current status

100%140 of 140 units booked
100.0%Work done, per cost certificate

Figures as on 14 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
EMPRESS DREAMS I BLDGNA151456056
EMPRESS DREAMS JNA151484084

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 14 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

20 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Installation of Lifts, at 95%.

EMPRESS DREAMS I BLDG100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.95%
EMPRESS DREAMS J100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.95%

Progress on shared amenities15

As on 14 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed100

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots100
Closed/Covered80
Open Space20
BuildingClosed/CoveredOpen SpaceTotal
EMPRESS DREAMS I BLDG401050
EMPRESS DREAMS J401050

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area3,589 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on17 Jun 2025

Approvals and building plan

Sanctioning authorityNAGPUR MUNCIPAL CORPORATION
Permissible FSI10453.37
Proposed, not sanctioned8,453 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchKALYAN
Estimated costRs 30.00 cr
Cost incurredRs 30.00 cr
Work done100.0%
BuildingWingEstimatedIncurred
EMPRESS DREAMS I BLDGNARs 13.50 crRs 13.50 cr
EMPRESS DREAMS JNARs 13.50 crRs 13.50 cr
-NARs 3.00 crRs 3.00 cr

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSURESH MISTRY
ArchitectSSBEHLIM Associates
Engineersandeep laxman chougale
Chartered AccountantRISHI SEKHRI
Chartered Accountantsm bhat
PartnerRole in project
KAUSHAL LOGISTICS PRIVATE LIMITED-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA02072501925Dec 2025 → Jun 2030

Reason as filed by the promoterDue to delays caused by material shortages, labor shortages, and insufficient funding, the project has been delayed. However, with the funding now available, we kindly request an extension until 30/06/2030 to complete the project

Complaints filed with MahaRERA2

Case no.ComplainantRespondentFiled
CC004000000000022Anand VithalaniSAURABH PRAVIN TAYAL30/12/2017
CC004000000030162Ashis RathourPraveen Tayal24/11/2019

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 15 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 10 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 29 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 10 Jul 2017Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Jun 2030

Documents filed50

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: KAUSHAL - ARCHITECH CERT - JUN26.pdf14 Jul 2026
Withdrawal Update Form 2File: KAUSHAL - ENGINEERS CERTIFICATE.pdf14 Jul 2026
Withdrawal Update Form 3File: KAUSHAL - FORM 3 - JUN26.pdf14 Jul 2026
Withdrawal Update Form 1File: Kaushal_FORM1-MAR26.pdf30 Apr 2026
Withdrawal Update Form 1File: Kaushal_FORM1-MAR26.pdf30 Apr 2026
Withdrawal Update Form 2File: kaushal_ENG CAERTIFICATE.pdf30 Apr 2026
Withdrawal Update Form 2File: kaushal_ENG CAERTIFICATE.pdf30 Apr 2026
Withdrawal Update Form 3File: kaushal_FORM-3_MAR26.pdf30 Apr 2026
Withdrawal Update Form 3File: kaushal_FORM-3_MAR26.pdf30 Apr 2026
Withdrawal Update Form 1File: form 1.pdf12 Feb 2026
Withdrawal Update Form 2File: form 2.pdf12 Feb 2026
Withdrawal Update Form 3File: form 3.pdf12 Feb 2026
Withdrawal Update Form 1File: KAUSHAL FORM1.pdf19 Nov 2025
Withdrawal Update Form 1File: KAUSHAL FORM1.pdf19 Nov 2025
Withdrawal Update Form 2File: KAUSHAL ENG CERTIFICATE - SEP25.pdf19 Nov 2025
Withdrawal Update Form 2File: KAUSHAL ENG CERTIFICATE - SEP25.pdf19 Nov 2025
Withdrawal Update Form 3File: KAUSHAL FORM3_SEP25.pdf19 Nov 2025
Withdrawal Update Form 3File: KAUSHAL FORM3_SEP25.pdf19 Nov 2025
Form 1File: ARC 2025.pdf19 Jun 2025
Form 2File: ENGG 225.pdf19 Jun 2025
Form 3File: kaushal form 3_2021 TO 2025.pdf19 Jun 2025
Disclosure of Sold and Booked InventoryFile: kaushal sold unsold inventory.pdf19 Jun 2025
Form 2A (FY 2024-2025)File: Form 2A-8_page-0001 (1).pdf19 Jun 2025
Form 5 (FY 2024-2025)File: Form 5-3_page-0001 (1).pdf19 Jun 2025
Details of encumbrances concerned to FinanceFile: encumb.pdf10 Feb 2025
Declaration about Commencement CertificateFile: kaushal cc.pdf10 Feb 2025
CERSAI detailsFile: CRESAI .pdf10 Feb 2025
Deviation Report with respect to Allotment letterFile: Kaushal ALLOTMENT Letter MahaRERA.pdf10 Feb 2025
Details of encumbrances concerned to LegalFile: encumb.pdf10 Feb 2025
Deviation Report with respect to model copy of AgreementFile: Kaushal Agreement of sale MahaRERA.pdf10 Feb 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: kaushal.pdf10 Feb 2025
PAN CardFile: KAUSHAL-Pancard.pdf26 Apr 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: declaration.pdf26 Apr 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: KAUSHAL LOGISTIC - FORM 5.pdf26 Apr 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: KAUSHAL LOGISTIC - FORM 5.pdf26 Apr 2023
Proforma of Agreement for saleFile: Kaushal - agreement format - IJ.pdf26 Apr 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: BANK DETAILS.pdf26 Apr 2023
Declaration in FORM BFile: KAUSHAL-2.pdf31 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: architect cerificate-2.pdf31 Jul 2017
OtherFile: compressed_852078649.pdf31 Jul 2017
Building plan approvalFile: cc.pdf29 Jul 2017
Building Plan Approval (IOD)File: cc.pdf29 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: compressed_294561257.pdf29 Jul 2017
Certificates of CA (Form 3)File: compressed_1575464116.pdf29 Jul 2017
Copy of the legal title reportFile: title nagpur.pdf15 Jul 2017
Details of encumbrancesFile: NO ENCUMB.pdf12 Jul 2017
Proforma of Allotment letterFile: Kaushal - agreement dreams IJ.pdf12 Jul 2017
Layout approvalFile: layout plan.pdf10 Jul 2017
Copy of Layout Approval (in case of layout)File: layout plan.pdf10 Jul 2017
Commencement Certificates / NA Order for plotted developmentFile: COMMENCEMENT CERTIFICATE A TO J.pdf10 Jul 2017

How this compares with Nagpur

100%of this project is bookeddistrict median 35%
13%of Nagpur projects moved their completion datethis one moved by 54 months
22%of Nagpur registrations have lapsed or been cancelledthis one is on the register

Computed across the 2,800+ Nagpur projects on ReraGenie, from their own filings.

Free monthly report: Nagpur on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep EMPRESS DREAMS on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Nagpur (M Corp.)2,800+ in Nagpur

2 kmEMPRESS DREAMSCompleted 38Lapsed / revoked 16Other 47Dot size: filed unitsN

Filed coordinates, straight-line distance. 101 registered projects within 2 km.

Builder: KAUSHAL LOGISTICS PRIVATE LIMITED

KAUSHAL LOGISTICS PRIVATE LIMITED has 1 registration on MahaRERA, including EMPRESS DREAMS. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Nagpur district page.

Frequently asked questions

What are my rights if EMPRESS DREAMS is delayed beyond 30 Jun 2030?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of EMPRESS DREAMS?

The registered promoter entity is KAUSHAL LOGISTICS PRIVATE LIMITED, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in EMPRESS DREAMS?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against EMPRESS DREAMS?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for EMPRESS DREAMS?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at EMPRESS DREAMS?

The professionals named in the filing: Architect: SURESH MISTRY; Architect: SSBEHLIM Associates; Engineer: sandeep laxman chougale; Chartered Accountant: RISHI SEKHRI; Chartered Accountant: sm bhat. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in EMPRESS DREAMS?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About EMPRESS DREAMS. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save EMPRESS DREAMS to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.