Completed No litigation declared Residential / Group Housing project

EMH - 1

By VISTACORE LIFESPACE DEVELOPERS INDIA PVT LTD

RG-MH-24231 · RERA P53000010504 · Last updated on MahaRERA portal: 6 Aug 2021

Source: official MahaRERA filing

Red flags

  • 2 complaints at MahaRERA
  • Completion date moved by 42 months
  • 1 extension taken

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Kolhapur registration emailed to you, free during the pilot beta.
Dec 2021Possession promisedregistration recorded completed
5 of 11Construction stages donefurthest along: Sanitary Fittings within the flats /..., 80%
2Complaints at MahaRERAon this registration
Jump to the 24 documents Report an error

EMH - 1 is a Residential / Group Housing project by VISTACORE LIFESPACE DEVELOPERS INDIA PVT LTD in Kolhapur, Maharashtra, registered with MahaRERA as P53000010504 on 31 Aug 2017. The registration is recorded completed; possession was promised by 30 Dec 2021. The completion date has moved by 42 months from the original filing. 2 complaints are on record with the regulator.

At a glance

Project

  • NameEMH - 1
  • TypeResidential / Group Housing
  • Location
    • Yadrav
    • Shirol
    • Kolhapur
    • 411030
  • Pincode411030
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P53000010504
  • ReraGenie IDRG-MH-24231

Builder

  • NameVISTACORE LIFESPACE DEVELOPERS INDIA PVT LTD
  • Entity typeCompany
  • Managing DirectorMR UTKARSH BALASAHEB PATIL

Key dates

this monthRegisteredAug 2017First promiseJun 2018Revised toDec 2021Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on31 Aug 2017
  • Promised completion30 Dec 2021
  • Revised completionRevised to 30 Dec 2021 (originally 30 Jun 2018)
  • Buildings1 building record
  • Documents filed24 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
EMH - 1NA20000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 6 Aug 2021, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

5 of 11 construction stages are filed complete. The stage furthest along is Sanitary Fittings within the flats / premises, at 80%.

EMH - 1: 59% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises80%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.70%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities18

As on 6 Aug 2021, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes90%
Water SupplyYes80%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes60%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes90%
Street LightingYes90%
Community BuildingsYes95%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes90%
Aggregate area of recreational Open SpaceYes90%
Open ParkingNoNot applicable
GYMYes98%
COMPOUND WALL AND MAIN ENTRANCE GATEYes95%
SWIMMING POOLYes90%

Parking filed170

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots170
Closed/Covered170

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area20,010 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
PADMAVATI DEVELOPERSIchalkaranji (M Cl)Kolhapur

Approvals and building plan

Permissible FSI13002.66
Proposed, not sanctioned13,003 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchKALYANI NAGAR PUNE 411006

Certifying professionals and partners2

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectPRAKAASH JADHAV AND ASSOCIATES
EngineerPRAVIN PISE
PartnerRole in project
VISTACORE LIFESPACE DEVELOPERS INDIA PVT LTD-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT53000005839Jun 2018 → Dec 2020

Reason as filed by the promoterWe have completed the work and have applied for Occupancy Certificate which is awaited. Further, the allottees have taken possession of their units.

Complaints filed with MahaRERA2

Case no.ComplainantRespondentFiled
CC0050000000119241) Sachin V. bora , vishnugopal Vyas, Vikram G. Jadhav, Ajit A. patil Sanjay n. Raut & 50 OthersVistacoreLifespace developers india pvt ltd. & Padmavati developers27/10/2018
CC005000000064898SACHIN BORA SANJAY RAUT VIKRAM JADHAV AJIT PATIL VISHNU VYASVISTACORE LIFE SPACES DEVELOPERS INDIA LTD & PADMAVATI DEVELOPERS09/12/2020

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 31 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 16 Aug 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 31 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 14 Aug 2017Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 19 Jun 2021

Documents filed24

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Status of Formation of Legal Entity (Society/Co Op etc.)File: Incorporation Certificate of Society.pdf6 Aug 2021
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Occupancy Certificate.pdf19 Jun 2021
Architect’s Certificate on Completion of Project (Form 4)File: Form 4 Architect Certificate.pdf19 Jun 2021
OtherFile: Application for OC.pdf19 Jun 2021
OtherFile: Booked Inventory-compressed.pdf19 Jun 2021
Layout approvalFile: EMH_1_layout for upload.pdf16 Aug 2017
Copy of Layout Approval (in case of layout)File: EMH_1_layout for upload.pdf16 Aug 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architects_Cer_EMH_1.pdf16 Aug 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Cer EMH 1.pdf16 Aug 2017
Details of encumbrancesFile: encumbrances Sangali_Bank1.pdf14 Aug 2017
Commencement Certificates / NA Order for plotted developmentFile: Commencement_Cer.pdf14 Aug 2017
Declaration in FORM BFile: FORM B LIFESPACE.pdf14 Aug 2017
Certificates of CA (Form 3)File: CA_Certificate1.pdf14 Aug 2017
Proforma of Allotment letterFile: Agreement_-_Proforma.pdf14 Aug 2017
OtherFile: NOTES.pdf14 Aug 2017
Building plan approvalFile: A_Type.pdf31 Jul 2017
Building plan approvalFile: B_Type.pdf31 Jul 2017
Layout approvalFile: Layout_Plan.pdf31 Jul 2017
PAN CardFile: PAN.pdf31 Jul 2017
Copy of the legal title reportFile: Legal_Title_Report.PDF31 Jul 2017
Details of encumbrancesFile: Legal_Title_Report.PDF31 Jul 2017
Copy of Layout Approval (in case of layout)File: Layout_Plan.pdf31 Jul 2017
Building Plan Approval (IOD)File: A_Type.pdf31 Jul 2017
Building Plan Approval (IOD)File: B_Type.pdf31 Jul 2017

How this compares with Kolhapur

17%of Kolhapur projects moved their completion datethis one moved by 42 months
25%of Kolhapur registrations have lapsed or been cancelledthis one is completed

Computed across the 880+ Kolhapur projects on ReraGenie, from their own filings.

Keep EMH - 1 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Yadrav880+ in Kolhapur

2 kmEMH - 1Completed 1Lapsed / revoked 2Other 8Dot size: filed unitsN

Filed coordinates, straight-line distance. 11 registered projects within 2 km.

Builder: VISTACORE LIFESPACE DEVELOPERS INDIA PVT LTD

VISTACORE LIFESPACE DEVELOPERS INDIA PVT LTD has 1 registration on MahaRERA, including EMH - 1. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Kolhapur district page.

Frequently asked questions

What are my rights if EMH - 1 is delayed beyond 30 Dec 2021?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of EMH - 1?

The registered promoter entity is VISTACORE LIFESPACE DEVELOPERS INDIA PVT LTD, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in EMH - 1?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against EMH - 1?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for EMH - 1?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at EMH - 1?

The professionals named in the filing: Architect: PRAKAASH JADHAV AND ASSOCIATES; Engineer: PRAVIN PISE. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in EMH - 1?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About EMH - 1. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save EMH - 1 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.