Registered No litigation declared Residential / Group Housing project

Guardian Cityscapes Phase-3

By Guardian Homes Private Limited

RG-MH-17270 · RERA P52100028630 · Last updated on MahaRERA portal: 25 Jun 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 24 months
  • 2 extensions taken
  • Rs 320.00 crore secured on the land, in favour of KKR India Asset Finance Limited

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Jun 2027Possession promisedmoved 24 months from the original
19 of 22Construction stages doneacross 2 buildings; furthest along: Installation of Lifts, 85%
2 of 154Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 123 documents Report an error

Guardian Cityscapes Phase-3 is a Residential / Group Housing project by Guardian Homes Private Limited in Pune, Maharashtra, registered with MahaRERA as P52100028630 on 25 Mar 2021. Possession is promised by 30 Jun 2027. The completion date has moved by 24 months from the original filing. 152 of the 154 units on this registration are recorded sold or booked, and 19 of 22 construction stages are filed complete.

At a glance

Project

  • NameGuardian Cityscapes Phase-3
  • TypeResidential / Group Housing
  • Location
    • Sinhgad Road
    • NEAR RAJARAM BRIDGE
    • Parvati
    • Haveli
    • Pune
    • 411030
  • Pincode411030
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100028630
  • ReraGenie IDRG-MH-17270

Builder

  • NameGuardian Homes Private Limited
  • Entity typeCompany
  • Managing DirectorsManish Murlidhar Sabade, MANISH MADHAV SOMAN
  • Other registrations2 more →
  • Completed2 of 3

Key dates

this monthRegisteredMar 2021First promiseJun 2025Revised toJun 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on25 Mar 2021
  • Promised completion30 Jun 2027
  • Revised completionRevised to 30 Jun 2027 (originally 30 Jun 2025)
  • Buildings2 building records
  • Documents filed123 files

Current status

99%152 of 154 units booked
93.8%Work done, per cost certificate

Figures as on 25 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BNA232178078
ENA231976076

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 25 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

19 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Installation of Lifts, at 85%.

B90%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.85%
E91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 25 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes95%
Water SupplyYes95%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes95%
Storm Water DrainsYes95%
Landscaping & Tree PlantingYes80%
Street LightingYes95%
Community BuildingsYes60%
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes40%
Open ParkingNoNot applicable

Land and ownership

A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area6,218 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared present
Charge in favour ofKKR India Asset Finance Limited
Secured amountRs 320.00 crore
CERSAI search filedYes
Declared on17 Jul 2025

Approvals and building plan

Sanctioning authorityPune Municipal Corporation
Permissible FSI12087.6
Proposed, not sanctioned12,088 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchKOTHRUD PUNE-411038
Estimated costRs 118.49 cr
Cost incurredRs 111.10 cr
Work done93.76%
BuildingWingEstimatedIncurred
BNARs 56.54 crRs 50.17 cr
ENARs 47.56 crRs 47.40 cr
-NARs 14.39 crRs 13.52 cr

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectVikas Achalkar
ArchitectVikas D Achalkar
EngineerAnand Rathod
Chartered AccountantSSPM & Co
PartnerRole in project
Guardian Homes Private Limited-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA17072502095Jun 2025 → Jun 2026

Reason as filed by the promoterDue to finance issue

EA17062621415Jun 2025 → Jun 2027

Reason as filed by the promoterProject delayed due to finance issues

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 18 Mar 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 5 Mar 2021
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 5 Mar 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 5 Mar 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 25 Jun 2025

Documents filed123

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 123 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2020-2021)File: CS-3 Quality Assurance Yr 20-21.pdf25 Jun 2026
Form 2A (FY 2021-2022)File: CS-3 Quality Assurance Yr 21-22.pdf25 Jun 2026
Form 2A (FY 2022-2023)File: CS-3 Quality Assurance Yr 22-23.pdf25 Jun 2026
Form 2A (FY 2023-2024)File: CS-3 Quality Assurance Yr 23-24.pdf25 Jun 2026
Form 2A (FY 2024-2025)File: CS-3 Quality Assurance Yr 24-25.pdf25 Jun 2026
Form 2A (FY 2025-2026)File: CS-3 Quality Assurance Yr 25-26.pdf25 Jun 2026
Form 2A (FY 2026-2027)File: CS-3 Quality Assurance Yr 26-27.pdf25 Jun 2026
Form 5 (FY 2020-2021)File: Form 5 FY 2223.pdf25 Jun 2026
Form 5 (FY 2021-2022)File: Form 5 FY 2223.pdf25 Jun 2026
Form 5 (FY 2022-2023)File: Form 5 FY 2223.pdf25 Jun 2026
Form 5 (FY 2023-2024)File: Form 5 FY 2324.pdf25 Jun 2026
Form 5 (FY 2024-2025)File: Form 5 2425.pdf25 Jun 2026
Form 5 (FY 2025-2026)File: Form 5 2425.pdf25 Jun 2026
Withdrawal Update Form 1File: Architect Sep 25.pdf17 Jun 2026
Withdrawal Update Form 1File: Architect Dec 25.pdf17 Jun 2026
Withdrawal Update Form 1File: Architect Mar 26.pdf17 Jun 2026
Withdrawal Update Form 2File: Engineer Certificate Sep 25.pdf17 Jun 2026
Withdrawal Update Form 2File: Engineer Certificate Dec 25.pdf17 Jun 2026
Withdrawal Update Form 2File: Engineer Certificate Mar 26.pdf17 Jun 2026
Withdrawal Update Form 3File: CA Sep 25.pdf17 Jun 2026
Withdrawal Update Form 3File: CA Dec 25.pdf17 Jun 2026
Withdrawal Update Form 3File: CA Mar 26.pdf17 Jun 2026
Form 1File: CS-Architect Certificate-Ph-3-March-21.pdf17 Jul 2025
Form 2File: CS-Engineer Certificate-Ph-3-March-21.pdf17 Jul 2025
Form 3File: CS-Architect Certificate-Ph-3-March-21.pdf17 Jul 2025
Disclosure of Sold and Booked InventoryFile: Sold Disclousre.pdf17 Jul 2025
Form 1File: Arch Mar 25.pdf17 Jul 2025
Form 2File: Cityscapes Engg Certificates Ph-3_Mar-25 (Modified For Accounts).pdf17 Jul 2025
Form 3File: CA Mar 25 c.pdf17 Jul 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold B Bldg- Mar 25.pdf17 Jul 2025
OthersFile: Sold Unsold E Bldg- Mar 25.pdf17 Jul 2025
Form 1File: Arch Dec 24.pdf17 Jul 2025
Form 2File: Cityscapes Engg Certificates Ph-3_Dec-24 (Modified For Accounts).pdf17 Jul 2025
Form 3File: CA Dec 24 c.pdf17 Jul 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold B Bldg- Dec 24.pdf17 Jul 2025
OthersFile: Sold Unsold E Bldg- Dec 24.pdf17 Jul 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Sep 24 c.pdf25 Jun 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Dec 24 c.pdf25 Jun 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Mar 25 c.pdf25 Jun 2025
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Cityscapes-E Building Completion.pdf25 Jun 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Sep 24 c.pdf25 Jun 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Dec 24 c.pdf25 Jun 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Mar 25 c.pdf25 Jun 2025
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Cityscapes-E Building Completion.pdf25 Jun 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2024-25)File: Form 5 - GHPL - Phase 3 - FY 2023-2024.pdf20 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch Sept 24.pdf23 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch June 24.pdf23 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch Dec 24.pdf23 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch Mar 25.pdf23 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Sept 24.pdf23 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Dec 24.pdf23 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Mar 25.pdf23 Apr 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold B Bldg- Dec 24.pdf23 Apr 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold B Bldg- Mar 25.pdf23 Apr 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold E Bldg- Dec 24.pdf23 Apr 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold E Bldg- Mar 25.pdf23 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch Jun.pdf9 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Eng sep.pdf9 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Eng Dec.pdf9 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Eng Mar.pdf9 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect.pdf24 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer.pdf24 Apr 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Quality.pdf24 Apr 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 Phase 3 CA Certificate March 2023.pdf15 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch ph 3.pdf17 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Eng ph 2.pdf15 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Eng ph 3.pdf15 Jan 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: QA ph 3.pdf15 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: CS arc.pdf12 Jan 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: plan for view O1.pdf11 Dec 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: 1 Disclosure of sold_ booked inventory.pdf11 Dec 2023
Details of encumbrances concerned to FinanceFile: Encumbrance Legal.pdf11 Aug 2023
Details of encumbrances concerned to LegalFile: Encumbrance Legal.pdf11 Aug 2023
CERSAI detailsFile: Cersai.pdf11 Aug 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Dis Real Estate Org 1.pdf11 Aug 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Dis Real Estate Org 2.pdf11 Aug 2023
Proforma of Agreement for saleFile: Cityscapes Phase 3 Agreement.pdf11 Aug 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Bank ph 3.pdf11 Aug 2023
Deviation Report with respect to Allotment letterFile: Deviation AL AFS.pdf11 Aug 2023
Deviation Report with respect to model copy of AgreementFile: Deviation AL AFS.pdf11 Aug 2023

How this compares with Pune

99%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one moved by 24 months
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Guardian Cityscapes Phase-3 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near NEAR RAJARAM BRIDGE13,700+ in Pune

2 kmGuardian Cityscapes PhasCompleted 58Lapsed / revoked 33Other 81Dot size: filed unitsN

Filed coordinates, straight-line distance. 172 registered projects within 2 km.

Builder: Guardian Homes Private Limited

Guardian Homes Private Limited has 3 registrations on MahaRERA, including Guardian Cityscapes Phase 1 and Guardian Cityscapes Phase 2. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Guardian Cityscapes Phase-3 is delayed beyond 30 Jun 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Guardian Cityscapes Phase-3?

The registered promoter entity is Guardian Homes Private Limited, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Guardian Cityscapes Phase-3?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Guardian Cityscapes Phase-3?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Guardian Cityscapes Phase-3?

The professionals named in the filing: Architect: Vikas Achalkar; Architect: Vikas D Achalkar; Engineer: Anand Rathod; Chartered Accountant: SSPM & Co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Guardian Cityscapes Phase-3?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Guardian Cityscapes Phase-3. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Guardian Cityscapes Phase-3 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.