Completed No litigation declared Residential / Group Housing project

Emerald Isle - T4, T5, T6

By Larsen & Toubro Ltd. (Realty Division)

RG-MH-09734 · RERA P51800003307 · Last updated on MahaRERA portal: 3 Jan 2022

Source: official MahaRERA filing

Red flags

  • 17 complaints at MahaRERA
  • Completion date moved by 6 months
  • 1 extension taken

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Jun 2018Possession promisedregistration recorded completed
33 of 33Construction stages doneacross 3 buildings; every applicable stage filed complete
17Complaints at MahaRERAon this registration
Jump to the 32 documents Report an error

Emerald Isle - T4, T5, T6 is a Residential / Group Housing project by Larsen & Toubro Ltd. (Realty Division) in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800003307 on 5 Aug 2017. The registration is recorded completed; possession was promised by 30 Jun 2018. The completion date has moved by 6 months from the original filing. 17 complaints are on record with the regulator.

At a glance

Project

  • NameEmerald Isle - T4, T5, T6
  • TypeResidential / Group Housing
  • Location
    • Saki Vihar Road
    • Kurla
    • Mumbai Suburban
    • 400072
  • Pincode400072
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800003307
  • ReraGenie IDRG-MH-09734

Builder

  • NameLarsen & Toubro Ltd. (Realty Division)
  • Entity typeCompany
  • CINL99999MH1946PLC004768
  • GSTIN27AAACL0140P5ZF
  • GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • Chairman & Managing DirectorSekharipuram Narayanan Subrahmanyan
  • President, Whole-time Director & CFORamamurthi Shankar Raman
  • Whole-time Director & President (Energy)Subramanian Sudarsanam Sarma
  • Whole time Director and Senior ExecutivesSudhindra Vasantrao Desai, Tharayil Madhava Das
  • Whole-time Director & Senior ExecutiveAnil Vithal Parab
  • Other registrations24 more →
  • Completed7 of 25
  • No longer live3 lapsed, de-registered or revoked
  • Declared earlier projects30 →

Key dates

this monthRegisteredAug 2017First promiseDec 2017Revised toJun 2018Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on5 Aug 2017
  • Promised completion30 Jun 2018
  • Revised completionRevised to 30 Jun 2018 (originally 31 Dec 2017)
  • Buildings3 building records
  • Documents filed32 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
T4NA290000
T5NA290000
T6NA290000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 3 Jan 2022, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

33 of 33 construction stages are filed complete across 3 buildings.

T4100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
T5100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
T6100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 3 Jan 2022, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsYes100%
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed701

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots701
Closed/Covered701
BuildingClosed/CoveredTotal
T4234234
T5234234
T6233233

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area2,026 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI34919.56
Proposed, not sanctioned34,920 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branch5C/ II , Mittal Court, Mumbai - 400021

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectDSP Design Associates Pvt ltd Associate Architect
EngineerM/s Struct Bombay Consultants
EngineerM/s L&T EDRC
PartnerRole in project
Larsen & Toubro Ltd. (Realty Division)-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51800000086Dec 2017 → Jun 2018

Reason as filed by the promoterPart O.C. received for all three towers except for two floors in T6. Form 4 duly certified by Architect dated 12th October, 2017 (already uploaded on site).

Litigation declared4

CaseCourtStatus
2755/ 2011/2011HIGH COURT OF JUDICATURE AT BOMBAYSuit is pending for final hearing
2593 /2012/2012HIGH COURT OF JUDICATURE AT BOMBAYSuit is pending for final hearing
1578 of 2016/2016HIGH COURT OF JUDICATURE AT BOMBAYServed on LT Ltd and LTR Ltd matter is now notified to be listed in Nov Two thousand and Seventeen
1783 of 2017/2017HIGH COURT OF JUDICATURE AT BOMBAYChamber summons filed by U Dixit and K Nair seeking impleadment in WP Next date not notified

Complaints filed with MahaRERA17

Case no.ComplainantRespondentFiled
CC006000000000230Banmali TandanLarsen & Toubro22/08/2017
CC006000000000515SUMITA SINGH AND SANJAY SINGH RAJAWATLARSEN AND TOUBRO LTD AND SHRIKANT JOSHI13/09/2017
CC006000000001117Calvin JohnL&T Realty Emerald Isle06/10/2017
CC006000000001223Abhijit Bose & Malabika BoseShyam Renkuntla11/10/2017
CC006000000000999Sukesh BhowalLarsen and Toubro Limited07/10/2017
CC006000000001230SHYAM SUNDAR SARRAFSHYAM RENKUNTLA27/10/2017
CC006000000001269Pradeep MukerjeeLarsen & Toubro Limited15/10/2017
CC006000000001313Rajesh Chandra VermaLarsen & Toubro Ltd16/10/2017
CC006000000001423Murali M NatrajanLarsen and Toubro (Realty Division)25/10/2017
CC006000000012373Sunil Daga and Manish KathuriaLarsen and Toubro limited12/01/2018
CC006000000023296REKHA SINHALARSEN AND TOURBO LIMITED09/02/2018
CC006000000022886Sapna Vijay ShivlaniLarsen & Toubro Ltd.15/01/2018
CC006000000023140Navaz ColabawallaLarsen And Toubro Limited30/01/2018
CC006000000055437RAMESH MISHRALARSEN & TOUBRO LIMITED19/07/2018
CC006000000089713RAMESH MISHRALARSEN & TOUBRO LIMITED15/06/2019
CC006000000057215BANMALI TANDANLarsen & Toubro07/12/2018
CC006000000397746Navaz ColabawallaLarsen and Toubro Ltd07/10/2023

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 20 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 11 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 7 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 30 Apr 2018Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 3 Jan 2022

Documents filed32

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC T6 27-4-2018.pdf3 Jan 2022
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: oc ei T4,5,6.pdf22 Dec 2021
Status of ConveyanceFile: RERA EI 4,5,6.pdf22 Oct 2021
Status of Formation of Legal Entity (Society/Co Op etc.)File: Soc Regn_EI-T2-T5.pdf26 Nov 2019
Certificates of CA (Form 5)File: Form 5 T4-T6.pdf29 Sep 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: T45 6.pdf3 May 2018
Certificates of Architect (Form 4)File: Form 4 - T4 T5 T6.pdf2 May 2018
OtherFile: T7 T6 OC.PDF2 May 2018
Commencement Certificates / NA Order for plotted developmentFile: Further CC Copy.pdf30 Apr 2018
OtherFile: T2-T5.pdf5 Apr 2018
OtherFile: T6.pdf5 Apr 2018
Commencement Certificates / NA Order for plotted developmentFile: CC Copy.pdf29 Mar 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 T4,T5,T6.pdf13 Oct 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 T4 T5 T6.pdf13 Oct 2017
Certificates of CA (Form 3)File: Form 3 T4,T5,T6.pdf13 Oct 2017
Certificates of Architect (Form 4)File: T4,5,6 - Form 4.pdf13 Oct 2017
Certificates of Architect (Form 4)File: T4,5,6 Form4.pdf13 Oct 2017
OtherFile: OC T4,T5,T6.pdf13 Oct 2017
OtherFile: T4,T5,T6 OC.pdf13 Oct 2017
OtherFile: T4,5,6 Form4.pdf13 Oct 2017
PAN CardFile: PAN Card.pdf28 Jul 2017
Declaration in FORM BFile: Form B (T4, T5, T6).pdf28 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: T4-5-6 Form 1.pdf28 Jul 2017
Proforma of Allotment letterFile: Revised standard AFS_final.pdf28 Jul 2017
Copy of the legal title reportFile: Title Certificate.pdf20 Jul 2017
Details of encumbrancesFile: Title Certificate.pdf20 Jul 2017
Certificates of CA (Form 3)File: Form 3-T4-T6 final.pdf20 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - T4, T5, T6_R1.pdf19 Jul 2017
Layout approvalFile: Layout Approval.pdf11 Jul 2017
Copy of Layout Approval (in case of layout)File: Layout Approval.pdf11 Jul 2017
Building plan approvalFile: AMENDED_APPROVAL_LETTER(IOD).pdf7 Jul 2017
Building Plan Approval (IOD)File: AMENDED_APPROVAL_LETTER(IOD).pdf7 Jul 2017

Promoter's earlier projects12

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

10 delivered on promise2 not delivered by the promised date
ProjectLocationFlatsRegisteredStatusPromisedDelivered
Emerald Isle - T16P51800013504Kurla, Mumbai Suburban127Oct 2017OngoingDec 2024Registered original: Dec 2023Not delivered
TestTest1-OngoingNov 2024Not delivered
Emerald Isle - T15Saki Vihar Road Powai208-CompletedJun 2023Jun 2023
Emerald Isle - T10Saki Vihar Road Powai203-CompletedJun 2023Jun 2023
Emerald Isle - T9Saki Vihar Road Powai150-CompletedJun 2021Apr 2021
Emerald Isle - T8Saki Vihar Road Powai72-CompletedDec 2018Dec 2018
Emerald Isle - T7Saki Vihar Road Powai72-CompletedJun 2018Apr 2018
Emerald Isle - T4, T5, T6Saki Vihar Road Powai371-CompletedJun 2018Sep 2017
EMERALD ISLE TOWER 3LT Emerald Isle Near LT Business Park Saki Vihar Road Powai 400072139-CompletedAug 2016Jul 2016
EMERALD ISLE TOWER 2LT Emerald Isle Near LT Business Park Saki Vihar Road Powai 40007293-CompletedAug 2016Jul 2016
EMERALD ISLE TOWER 1LT Emerald Isle Near LT Business Park Saki Vihar Road Powai 40007242-CompletedAug 2016Jul 2016
SanofiSanofi House No 117B Near L&T Business Park Saki Vihar Road Mumbai 4000721-CompletedMar 2015Mar 2015

How this compares with Mumbai Suburban

33%of Mumbai Suburban projects moved their completion datethis one moved by 6 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is completed

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Emerald Isle - T4, T5, T6 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Kurla6,700+ in Mumbai Suburban

2 kmEmerald Isle - T4, T5, TCompleted 53Lapsed / revoked 22Other 37Dot size: filed unitsN

Filed coordinates, straight-line distance. 112 registered projects within 2 km.

Builder: Larsen & Toubro Ltd. (Realty Division)

Larsen & Toubro Ltd. (Realty Division) has 25 registrations on MahaRERA, including Emerald Isle - T7 and Emerald Isle - T8. Its filings disclose 30 earlier MahaRERA projects: declares 19 of 19 past projects completed on time. Litigation is declared on 14 of its registrations. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if Emerald Isle - T4, T5, T6 is delayed beyond 30 Jun 2018?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Emerald Isle - T4, T5, T6?

The registered promoter entity is Larsen & Toubro Ltd. (Realty Division), a company as per the filing. Its CIN L99999MH1946PLC004768 and GSTIN 27AAACL0140P5ZF can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Emerald Isle - T4, T5, T6?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Emerald Isle - T4, T5, T6?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Emerald Isle - T4, T5, T6?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Emerald Isle - T4, T5, T6?

The professionals named in the filing: Architect: DSP Design Associates Pvt ltd Associate Architect; Engineer: M/s Struct Bombay Consultants; Engineer: M/s L&T EDRC. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Emerald Isle - T4, T5, T6?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Emerald Isle - T4, T5, T6. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Emerald Isle - T4, T5, T6 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.