Completed No litigation declared Residential / Group Housing project

Emerald Isle - T10

By Larsen & Toubro Ltd. (Realty Division)

RG-MH-95147 · RERA P51800013052 · Last updated on MahaRERA portal: 5 Oct 2022

Source: official MahaRERA filing

Red flags

  • 4 complaints at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2023Possession promisedregistration recorded completed
5 of 11Construction stages donefurthest along: Staircases, 80%
4Complaints at MahaRERAon this registration
Jump to the 81 documents Report an error

Emerald Isle - T10 is a Residential / Group Housing project by Larsen & Toubro Ltd. (Realty Division) in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800013052 on 14 Sep 2017. The registration is recorded completed; possession was promised by 30 Dec 2023. 4 complaints are on record with the regulator.

At a glance

Project

  • NameEmerald Isle - T10
  • TypeResidential / Group Housing
  • Location
    • Saki Vihar Road
    • Kurla
    • Mumbai Suburban
    • 400072
  • Pincode400072
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800013052
  • ReraGenie IDRG-MH-95147

Builder

  • NameLarsen & Toubro Ltd. (Realty Division)
  • Entity typeCompany
  • CINL99999MH1946PLC004768
  • GSTIN27AAACL0140P5ZF
  • GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • Chairman & Managing DirectorSekharipuram Narayanan Subrahmanyan
  • President, Whole-time Director & CFORamamurthi Shankar Raman
  • Whole-time Director & President (Energy)Subramanian Sudarsanam Sarma
  • Whole time Director and Senior ExecutivesSudhindra Vasantrao Desai, Tharayil Madhava Das
  • Whole-time Director & Senior ExecutiveAnil Vithal Parab
  • Other registrations24 more →
  • Completed7 of 25
  • No longer live3 lapsed, de-registered or revoked
  • Declared earlier projects30 →

Key dates

this monthRegisteredSep 2017PromisedDec 2023Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on14 Sep 2017
  • Promised completion30 Dec 2023
  • Revised completionNone
  • Buildings1 building record
  • Documents filed81 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Emerald Isle - T10NA230000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 5 Oct 2022, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

5 of 11 construction stages are filed complete. The stage furthest along is Staircases, at 80%.

Emerald Isle - T10: 73% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure63%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises60%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks80%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.70%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.25%

Progress on shared amenities15

As on 5 Oct 2022, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes25%
Water SupplyYes45%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes75%
Storm Water DrainsYes55%
Landscaping & Tree PlantingYes40%
Street LightingYes20%
Community BuildingsYes100%
Treatment And Disposal Of Sewage And Sullage WaterYes75%
Solid Waste Management And DisposalYes80%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes25%
Fire protection and fire safety requirementsYes55%
Electrical meter room, sub-station, receiving stationYes25%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed187

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots187
Closed/Covered187

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area939 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI17351.17
Proposed, not sanctioned1,376 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branch5C/ 2 Mittal Court Mumbai 400021

Certifying professionals and partners

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

PartnerRole in project
Larsen & Toubro Ltd. (Realty Division)-

Litigation declared4

CaseCourtStatus
2755 of 2011/2011HIGH COURT OF JUDICATURE AT BOMBAYSuit is pending for final hearing
2593 of 2012/2012HIGH COURT OF JUDICATURE AT BOMBAYSuit is pending for final hearing on August Two Thousand Nineteen
CC/91/2018/2018CONSUMER DISPUTES REDRESSAL COMMISSION BANDRAMatter listed on September Two Thousand Twenty
A/19/457/2019STATE CONSUMER DISPUTES REDRESSAL COMMISSION MUMBAIMatter listed on September Two Thousand Nineteen

Complaints filed with MahaRERA4

Case no.ComplainantRespondentFiled
CC006000000055664ASHWIN MESHRAMLARSEN & TOUBRO LTD. (REALITY DIVISION05/08/2018
CC006000000193453Harmanprit GandhiLarsen & Turbo Ltd. ( Realty Division)13/07/2020
CC006000000209461Inderraj Naraindas SukhejaaLarson and Toubro limited24/12/2021
CC12502538Larsen & Toubro Ltd. (Realty Division)Sangita Pawar23/07/2025

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 4 Sep 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 4 Sep 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 4 Sep 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 30 Apr 2018Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 4 Jan 2022

Documents filed81

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 81 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: T10.pdf5 Oct 2022
Architect’s Certificate on Completion of Project (Form 4)File: Form 4_T10.pdf15 Jun 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Tower T10 Q1 FY19-20.pdf19 Feb 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Tower T10 Q2 FY19-20.pdf19 Feb 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Tower T10 Q3 FY19-20.pdf19 Feb 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Tower T10 Q4 FY19-20.pdf19 Feb 2022
Disclosure of sold/ booked inventoryFile: P51800013052-T10.pdf2 Feb 2022
Status of Formation of Legal Entity (Society/Co Op etc.)File: T10 Society Registration Certificate.pdf20 Jan 2022
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Form 4_T10.pdf4 Jan 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: ENGINEERS CERTIFICATE (FORM 2A FY 20-21) - T10.pdf3 Jan 2022
CERSAI detailsFile: Form 3_T10_R.pdf4 Dec 2021
Certificates of CA (Form 3)File: CA Certificate_T10_Q1_FY 21-22.pdf4 Dec 2021
Certificates of CA (Form 3)File: Form 3_T10_R.pdf4 Dec 2021
Disclosure of sold/ booked inventoryFile: Annexure_T10.pdf3 Dec 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Declaration CC EI T10.pdf23 Nov 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Qualty Assurance Certificate EI - T10.pdf23 Nov 2021
Declaration about Commencement CertificateFile: Declaration CC EI T10.pdf19 Nov 2021
Status of Formation of Legal Entity (Society/Co Op etc.)File: EI T10 name reservation.pdf20 Oct 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5_T10_.pdf30 Sep 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: RERA Form 1 Tower 10.pdf15 Jun 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: RERA Form 1 Tower 10.pdf15 Jun 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: RERA Form 2 T10.pdf15 Jun 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: RERA Form 2 T10.pdf15 Jun 2021
Certificates of CA (Form 3)File: Form 3 - T10 Dec 2020.pdf15 Jun 2021
Certificates of CA (Form 3)File: Form 3_T10.pdf15 Jun 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: RERA Form 1 Tower 10.pdf17 Nov 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: RERA Form 1 Tower 10.pdf17 Nov 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: RERA Form 1 Tower 10.pdf17 Nov 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: RERA Form 2 T10.pdf17 Nov 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2_T10.pdf17 Nov 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: RERA Form 2 T10.pdf17 Nov 2020
Certificates of CA (Form 3)File: Form_T10.pdf17 Nov 2020
Certificates of CA (Form 3)File: Form 3_T10.pdf17 Nov 2020
Certificates of CA (Form 3)File: form 3-T10.pdf17 Nov 2020
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: From 5_T10_2019-20_.pdf20 Oct 2020
Details of Restarting of Construction work post lockdownFile: EI_T10.pdf22 Jul 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: RERA Form 1 Tower 10_.pdf10 Feb 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: RERA Form 2_T10.pdf10 Feb 2020
Certificates of CA (Form 3)File: FINAL_T10.pdf10 Feb 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1_EI_T10_.pdf13 Nov 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2_EI_T10.pdf13 Nov 2019
Certificates of CA (Form 3)File: Form 3_EI_T10.pdf13 Nov 2019
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Rera form 5 signed certificate - T10.pdf13 Nov 2019
Certificates of CA (Form 5)File: Rera form 5 signed certificate - T10.pdf30 Sep 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: T10_Form 1_.pdf1 Aug 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: T10_Form 2.pdf1 Aug 2019
Certificates of CA (Form 3)File: EI-T10.pdf1 Aug 2019
Certificates of CA (Form 3)File: T10_Form 3.pdf1 Aug 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: EI-T10_.pdf3 May 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: EI-T10_.pdf3 May 2019
Declaration in FORM BFile: Form B_T10_.pdf26 Feb 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1_T10_.pdf3 Feb 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: TOWER T10.pdf3 Feb 2019
Certificates of CA (Form 3)File: Form 3_Final_T10.pdf3 Feb 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: T10-ilovepdf-compressed.pdf23 Nov 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: T 10.pdf23 Nov 2018
Certificates of CA (Form 3)File: Form 3-T10.pdf23 Nov 2018
Certificates of CA (Form 5)File: Form 5 T10.pdf29 Sep 2018
Certificates of CA (Form 3)File: Form 3 T10.pdf30 Jul 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 EIT10 - Jun'18.pdf25 Jul 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - EIT10 Jun'18.pdf25 Jul 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: T10.pdf1 May 2018
Commencement Certificates / NA Order for plotted developmentFile: Further CC Copy.pdf30 Apr 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 T10.pdf30 Apr 2018
Certificates of CA (Form 3)File: Form 3 - T10.pdf30 Apr 2018
Proforma of Allotment letterFile: Allotment Letter.pdf30 Apr 2018
Commencement Certificates / NA Order for plotted developmentFile: CC Copy.pdf29 Mar 2018
Certificates of CA (Form 3)File: Form 3 - T10.pdf29 Jan 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: RERA_Form_2_T10.pdf27 Jan 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECT CERTIFICATE T10-01.pdf24 Jan 2018
Declaration in FORM BFile: Form B - T10.pdf24 Oct 2017
Declaration in FORM BFile: Form B - T10.pdf5 Sep 2017
Proforma of Allotment letterFile: Revised standard AFS.pdf5 Sep 2017
Layout approvalFile: Layout Approval Letter.pdf4 Sep 2017
Building plan approvalFile: IOD Letter.pdf4 Sep 2017
PAN CardFile: Pan Card.pdf4 Sep 2017
Copy of the legal title reportFile: Legal Title Rep.pdf4 Sep 2017
Details of encumbrancesFile: Encumberances.pdf4 Sep 2017
Copy of Layout Approval (in case of layout)File: Layout Approval Letter.pdf4 Sep 2017
Building Plan Approval (IOD)File: IOD Letter.pdf4 Sep 2017

Promoter's earlier projects12

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

10 delivered on promise2 not delivered by the promised date
ProjectLocationFlatsRegisteredStatusPromisedDelivered
Emerald Isle - T16P51800013504Kurla, Mumbai Suburban127Oct 2017OngoingDec 2024Registered original: Dec 2023Not delivered
TestTest1-OngoingNov 2024Not delivered
Emerald Isle - T15Saki Vihar Road Powai208-CompletedJun 2023Jun 2023
Emerald Isle - T10Saki Vihar Road Powai203-CompletedJun 2023Jun 2023
Emerald Isle - T9Saki Vihar Road Powai150-CompletedJun 2021Apr 2021
Emerald Isle - T8Saki Vihar Road Powai72-CompletedDec 2018Dec 2018
Emerald Isle - T7Saki Vihar Road Powai72-CompletedJun 2018Apr 2018
Emerald Isle - T4, T5, T6Saki Vihar Road Powai371-CompletedJun 2018Sep 2017
EMERALD ISLE TOWER 3LT Emerald Isle Near LT Business Park Saki Vihar Road Powai 400072139-CompletedAug 2016Jul 2016
EMERALD ISLE TOWER 2LT Emerald Isle Near LT Business Park Saki Vihar Road Powai 40007293-CompletedAug 2016Jul 2016
EMERALD ISLE TOWER 1LT Emerald Isle Near LT Business Park Saki Vihar Road Powai 40007242-CompletedAug 2016Jul 2016
SanofiSanofi House No 117B Near L&T Business Park Saki Vihar Road Mumbai 4000721-CompletedMar 2015Mar 2015

How this compares with Mumbai Suburban

33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is completed

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Emerald Isle - T10 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Kurla6,700+ in Mumbai Suburban

2 kmEmerald Isle - T10Completed 53Lapsed / revoked 22Other 37Dot size: filed unitsN

Filed coordinates, straight-line distance. 112 registered projects within 2 km.

Builder: Larsen & Toubro Ltd. (Realty Division)

Larsen & Toubro Ltd. (Realty Division) has 25 registrations on MahaRERA, including Emerald Isle - T7 and Emerald Isle - T8. Its filings disclose 30 earlier MahaRERA projects: declares 19 of 19 past projects completed on time. Litigation is declared on 14 of its registrations. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if Emerald Isle - T10 is delayed beyond 30 Dec 2023?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Emerald Isle - T10?

The registered promoter entity is Larsen & Toubro Ltd. (Realty Division), a company as per the filing. Its CIN L99999MH1946PLC004768 and GSTIN 27AAACL0140P5ZF can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Emerald Isle - T10?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Emerald Isle - T10?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Emerald Isle - T10?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

What should I check before booking in Emerald Isle - T10?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Emerald Isle - T10. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Emerald Isle - T10 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.