Home / Browse projects / Pune, Maharashtra / Elina

Completed No litigation declared Residential / Group Housing project

Elina

By Tulip Venture

RG-MH-51071 · RERA P52100048472 · Last updated on MahaRERA portal: 9 Oct 2024

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2024Possession promisedregistration recorded completed
16 of 22Construction stages doneacross 2 buildings; furthest along: Podiums (if any), 0%
0Complaints at MahaRERAon this registration
Jump to the 37 documents Report an error

Elina is a Residential / Group Housing project by Tulip Venture in Pune, Maharashtra, registered with MahaRERA as P52100048472 on 3 Jan 2023. The registration is recorded completed; possession was promised by 31 Dec 2024.

At a glance

Project

  • NameElina
  • TypeResidential / Group Housing
  • Location
    • Pimple Nilakh
    • Haveli
    • Pune
    • 411027
  • Pincode411027
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100048472
  • ReraGenie IDRG-MH-51071

Builder

  • NameTulip Venture
  • Entity typeOthers
  • Named personsHaribhau Kalu Sathe, Kolte-Patil Developers Limited

Key dates

this monthRegisteredJan 2023PromisedDec 2024Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on3 Jan 2023
  • Promised completion31 Dec 2024
  • Revised completionNone
  • Buildings2 building records
  • Documents filed37 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Elina - Floor 01 to 12NA120000
13th FloorNA10000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 9 Oct 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

16 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Podiums (if any), at 0%.

Elina - Floor 01 to 1291%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
13th Floor55%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 9 Oct 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed77

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots77
Closed/Covered10
Open Space67

Land and ownership6

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area2,049 sq m
Land owned byThe promoter, with other names on the file
Named landowners6
LandownerVillageDistrict
Mr Haribhau Kalu Sathe HUF and othersPimple NilakhPune
Mandakini Haribhau SathePimple NilakhPune
Pranoti Haribhau SathePimple NilakhPune
Mauli alias Dnyanoba Kalu SathePimple NilakhPune
Mangala Mauli SathePimple NilakhPune
Priyanka Mauli SathePimple NilakhPune

Approvals and building plan

Permissible FSI2180.62
Proposed, not sanctioned2,181 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGround floor and 1st floor, Millennium Star, Dhole Patil Road, Pune 411001

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectUnusual Spaces
EngineerJW Consultant LLP
EngineerAnil Adhikari
Chartered AccountantCA Nikita Bajaj
Chartered AccountantVIDHI S SHAH & ASSOCIATES CHARTERED ACCOUNTANTS
PartnerRole in project
Tulip Venture-

Litigation declared1

CaseCourtStatus
RCS 65 of 2021/2021CJJD Akrudi PuneFiling of written statement

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 29 Jun 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 9 Jun 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 9 Jun 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 29 Sep 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 23 Jun 2023

Documents filed37

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: ELINA JAZZ 3.pdf9 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: ELINA JAZZ 3.pdf9 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Elina - Tulip venture.pdf29 Sep 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Elina (Tulip venture).pdf20 Jul 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Elina-JazzIII Tulip Ventures.pdf20 Jul 2023
Proforma of Agreement for saleFile: Post OC AFS Elina.pdf23 Jun 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC Elina.pdf23 Jun 2023
Architect’s Certificate on Completion of Project (Form 4)File: Form 4 - Elina.pdf23 Jun 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Elina.pdf20 Apr 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Elina.pdf20 Apr 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Elina_compressed.pdf20 Apr 2023
CERSAI detailsFile: CERSAI_Search_Report_200266194630_For_Debtor_Based_Search_15_04_2023_17_27_26_526.pdf19 Apr 2023
Proforma of Agreement for saleFile: 23-12-2022-Revised-FINAL-New Project- AFS -Elina.pdf23 Dec 2022
Deviation Report with respect to model copy of AgreementFile: deviation - AFS.pdf14 Dec 2022
Details of encumbrances concerned to FinanceFile: Encumbrances - finance.pdf12 Dec 2022
Details of encumbrances concerned to FinanceFile: Encumbrances - legal.pdf12 Dec 2022
Details of encumbrances concerned to LegalFile: Encumbrances - finance.pdf12 Dec 2022
Details of encumbrances concerned to LegalFile: Encumbrances - legal.pdf12 Dec 2022
CERSAI detailsFile: CERSAI_Search_Report_200254523219_For_Asset_Based_Search_12_12_20.pdf12 Dec 2022
Other - LegalFile: Declaration - legal and technical.pdf12 Dec 2022
Other - TechnicalFile: Declaration - legal and technical.pdf12 Dec 2022
Other - TechnicalFile: clarification - cc.pdf12 Dec 2022
Commencement Certificates / NA Order for plotted developmentFile: commencement certificate.pdf29 Sep 2022
Proforma of Allotment letterFile: Allotment Letter.pdf29 Sep 2022
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Declaration Seprate Bank Account.pdf29 Sep 2022
Details of encumbrances concerned to FinanceFile: declaration encumbrances.pdf8 Aug 2022
Details of encumbrances concerned to LegalFile: declaration encumbrances.pdf8 Aug 2022
Deviation Report with respect to Allotment letterFile: Declaration for deviation.pdf25 Jul 2022
Copy of the legal title reportFile: Title - Elina_compressed.pdf29 Jun 2022
Declaration in FORM BFile: Affidavit - Tulip.pdf16 Jun 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Elina.pdf13 Jun 2022
Layout approvalFile: Plan.pdf9 Jun 2022
Building plan approvalFile: Plan.pdf9 Jun 2022
Copy of Layout Approval (in case of layout)File: Plan.pdf9 Jun 2022
Building Plan Approval / NA Order for plotted developmentFile: Plan.pdf9 Jun 2022
Declaration about Commencement CertificateFile: Declaration about Commencement certificate-Elina - 06 June 22.pdf9 Jun 2022
PAN CardFile: Tulip Venture PAN_WP.pdf14 Dec 2021

How this compares with Pune

26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Elina on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Pimple Nilakh13,700+ in Pune

2 kmElinaCompleted 67Lapsed / revoked 30Other 65Dot size: filed unitsN

Filed coordinates, straight-line distance. 162 registered projects within 2 km.

Builder: Tulip Venture

Tulip Venture has 1 registration on MahaRERA, including Elina. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Elina is delayed beyond 31 Dec 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Elina?

The registered promoter entity is Tulip Venture, an others as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Elina?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Elina?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Elina?

The professionals named in the filing: Architect: Unusual Spaces; Engineer: JW Consultant LLP; Engineer: Anil Adhikari; Chartered Accountant: CA Nikita Bajaj; Chartered Accountant: VIDHI S SHAH & ASSOCIATES CHARTERED ACCOUNTANTS. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Elina?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Elina. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Elina to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.