ReraGenieLog inGet a buyer report

Home / Browse projects / Mumbai Suburban, Maharashtra / EKTA CO. OP. HSG. SOC. Prop

Registration lapsed No litigation declared Residential / Group Housing project

EKTA CO. OP. HSG. SOC. Prop

By Poonam Housecon Pvt. Ltd.

RG-MH-21796 · RERA P51800024202 · Last updated on MahaRERA portal: 19 Dec 2024

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 16 months past the filed date
  • Completion date moved by 6 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Jun 2025Possession promised16 months past this date
10 of 11Construction stages donefurthest along: Installation of Lifts, 98%
0Complaints at MahaRERAon this registration
Jump to the 152 documents Report an error

EKTA CO. OP. HSG. SOC. Prop is a Residential / Group Housing project by Poonam Housecon Pvt. Ltd. in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800024202 on 27 Jan 2020. Possession was promised by 30 Jun 2025 and is now 16 months past that date. The completion date has moved by 6 months from the original filing.

At a glance

Project

  • NameEKTA CO. OP. HSG. SOC. Prop
  • TypeResidential / Group Housing
  • Location
    • Rani Sati Marg
    • Malad East
    • Greater Mumbai (M Corp.) (Part) (802794)
    • Mumbai
    • Mumbai Suburban
    • 400097
  • Pincode400097
  • RERA no.P51800024202
  • ReraGenie IDRG-MH-21796

Builder

  • NamePoonam Housecon Pvt. Ltd.
  • Entity typeCompany
  • DirectorsUmesh Ambaji Karande, Manoj Lalchand Singh, Ramnik Shivjibhai Shah, Kuwarji Bharmal Chhadwa, Ankur Vinod Singh
  • Declared earlier projects2 →

Key dates

16 months past promisethis monthRegisteredJan 2020First promiseDec 2024Revised toJun 2025

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on27 Jan 2020
  • Promised completion30 Jun 2025
  • Revised completionRevised to 30 Jun 2025 (originally 30 Dec 2024)
  • Buildings1 building record
  • Documents filed152 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Vaishno HeightsNA270000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 19 Dec 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

10 of 11 construction stages are filed complete. The stage furthest along is Installation of Lifts, at 98%.

Vaishno Heights: 100% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.98%

Progress on shared amenities15

As on 19 Dec 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes80%
Solid Waste Management And DisposalYes60%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed1

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots1
Closed/Covered1

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area3,808 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI21500.0
Proposed, not sanctioned15,745 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchMalad East, Mumbai-400097

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectVishwas Satodia
EngineerNeel Dholia
Chartered AccountantSudhir R Shah
PartnerRole in project
Poonam Housecon Pvt. Ltd.-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51800025522Dec 2024 → Jun 2025

Reason as filed by the promoterWe, the promoters of the project EKTA CO. OP. HSG. SOC. Prop, respectfully submit this explanatory note in compliance with the provisions of the Real Estate (Regulation and Development) Act, 2016, to seek an extension of the project registration validity for our project "Vaishno Heights." Details of the Project: The project " EKTA CO. OP. HSG. SOC. Prop" and Building Name: Vaishno Heights consists of three wings: 1. Wing A: Full Occupancy Certificate (OC) obtained on 09-08-2024 2. Wing B: Full Occupancy Certificate (OC) obtained on 09-08-2024 3. Wing C: Part Occupancy Certificate (Part OC) obt

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 17 Dec 2019
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 8 Apr 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 3 Dec 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 3 Dec 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 3 Dec 2024

Documents filed152

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 152 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Declaration about all RERA Designated Bank Accounts (Format A)File: Format A.pdf19 Dec 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: All DINS.pdf19 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 MArch 24_11zon.pdf14 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Sep 24_11zon.pdf14 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 23-24_11zon.pdf14 Dec 2024
Details of encumbrances concerned to FinanceFile: 1 Details of encumbrances.pdf13 Dec 2024
Declaration in FORM BFile: Affidavit Cum Declaration.pdf13 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Vaishno Heights Eng Certificate 310324.pdf13 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Vaishno Heights Eng Certificate 300924.pdf13 Dec 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A 19-20.pdf13 Dec 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A 20-21.pdf13 Dec 2024
Disclosure of sold/ booked inventoryFile: Circular 29.pdf13 Dec 2024
Declaration about Commencement CertificateFile: Format D.pdf13 Dec 2024
CERSAI detailsFile: CERSAI_Search_Report_200331417977_For_Asset_Based_Search_13_12_2024_15_30_08_872.pdf13 Dec 2024
Details of encumbrances concerned to LegalFile: 1 Details of encumbrances.pdf13 Dec 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A 21-22.pdf13 Dec 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A 22-23.pdf13 Dec 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A 23-24.pdf13 Dec 2024
Building plan approvalFile: Rev LOI .pdf3 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Rera 310324.pdf3 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: PHPL Architect Certificate.pdf3 Dec 2024
Commencement Certificates / NA Order for plotted developmentFile: CC Re endorsed ekta chs.pdf3 Dec 2024
Building Plan Approval / NA Order for plotted developmentFile: Rev LOI .pdf3 Dec 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: PHPL OC 09082024.pdf3 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 31032023.pdf28 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 31032021 Signed.pdf6 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 31032022 Signed.pdf6 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5.pdf5 Mar 2024
Disclosure of sold/ booked inventoryFile: Disclosure of Inventory details.pdf1 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf22 Aug 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Amar Singh Engineer Certificate.pdf20 Jun 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: PHPL Architect Certificate.pdf17 Apr 2023
Layout approvalFile: OC 16_compressed.pdf8 Apr 2023
Copy of Layout Approval (in case of layout)File: OC 16_compressed.pdf8 Apr 2023
Layout approvalFile: part 1.pdf7 Apr 2023
Layout approvalFile: part 2.pdf7 Apr 2023
Layout approvalFile: part 3.pdf7 Apr 2023
Layout approvalFile: part 4.pdf7 Apr 2023
Layout approvalFile: part 5.pdf7 Apr 2023
Layout approvalFile: part 6.pdf7 Apr 2023
Copy of Layout Approval (in case of layout)File: part 1.pdf7 Apr 2023
Copy of Layout Approval (in case of layout)File: part 2.pdf7 Apr 2023
Copy of Layout Approval (in case of layout)File: part 3.pdf7 Apr 2023
Copy of Layout Approval (in case of layout)File: part 4.pdf7 Apr 2023
Copy of Layout Approval (in case of layout)File: part 5.pdf7 Apr 2023
Copy of Layout Approval (in case of layout)File: part 6.pdf7 Apr 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5.pdf6 Apr 2023
Layout approvalFile: 1.pdf23 Feb 2023
Layout approvalFile: 1x1_11zon.pdf23 Feb 2023
Layout approvalFile: 2_11zon.pdf23 Feb 2023
Layout approvalFile: 3_11zon.pdf23 Feb 2023
Layout approvalFile: 4_11zon.pdf23 Feb 2023
Layout approvalFile: 5_11zon.pdf23 Feb 2023
Layout approvalFile: 6_11zon.pdf23 Feb 2023
Layout approvalFile: 7_11zon.pdf23 Feb 2023
Layout approvalFile: 8_11zon.pdf23 Feb 2023
Layout approvalFile: 9_11zon.pdf23 Feb 2023
Layout approvalFile: 10_11zon.pdf23 Feb 2023
Layout approvalFile: 11 (2)_11zon.pdf23 Feb 2023
Layout approvalFile: 12_11zon.pdf23 Feb 2023
Layout approvalFile: 13_11zon.pdf23 Feb 2023
Layout approvalFile: 14_11zon.pdf23 Feb 2023
Layout approvalFile: 15_11zon.pdf23 Feb 2023
Copy of Layout Approval (in case of layout)File: 1.pdf23 Feb 2023
Copy of Layout Approval (in case of layout)File: 1x1_11zon.pdf23 Feb 2023
Copy of Layout Approval (in case of layout)File: 2_11zon.pdf23 Feb 2023
Copy of Layout Approval (in case of layout)File: 3_11zon.pdf23 Feb 2023
Copy of Layout Approval (in case of layout)File: 4_11zon.pdf23 Feb 2023
Copy of Layout Approval (in case of layout)File: 5_11zon.pdf23 Feb 2023
Copy of Layout Approval (in case of layout)File: 6_11zon.pdf23 Feb 2023
Copy of Layout Approval (in case of layout)File: 7_11zon.pdf23 Feb 2023
Copy of Layout Approval (in case of layout)File: 8_11zon.pdf23 Feb 2023
Copy of Layout Approval (in case of layout)File: 9_11zon.pdf23 Feb 2023
Copy of Layout Approval (in case of layout)File: 10_11zon.pdf23 Feb 2023
Copy of Layout Approval (in case of layout)File: 11 (2)_11zon.pdf23 Feb 2023
Copy of Layout Approval (in case of layout)File: 12_11zon.pdf23 Feb 2023
Copy of Layout Approval (in case of layout)File: 13_11zon.pdf23 Feb 2023
Copy of Layout Approval (in case of layout)File: 14_11zon.pdf23 Feb 2023
Copy of Layout Approval (in case of layout)File: 15_11zon.pdf23 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: FORM 5_FY 2019-20.pdf30 May 2022

Promoter's earlier projects2

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

2 delivered late
ProjectLocationFlatsStatusPromisedDelivered
SHREE GANESH VAISHNO DEVELOPERSSia Apartment Mantri Wadi Malad West Mumbai 40006452CompletedApr 2017Late, Jul 2017
Solitaire Home Phase 1Suhas Modi Road Kandivali East Mumbai 400101323CompletedJan 2016Late, Mar 2016

How this compares with Mumbai Suburban

33%of Mumbai Suburban projects moved their completion datethis one moved by 6 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is among them

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep EKTA CO. OP. HSG. SOC. Prop on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Malad East6,700+ in Mumbai Suburban

Builder: Poonam Housecon Pvt. Ltd.

Poonam Housecon Pvt. Ltd. has 1 registration on MahaRERA, including EKTA CO. OP. HSG. SOC. Prop. Its filings disclose 2 earlier MahaRERA projects: declares 0 of 2 past projects completed on time. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What does it mean that EKTA CO. OP. HSG. SOC. Prop shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if EKTA CO. OP. HSG. SOC. Prop is delayed beyond 30 Jun 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of EKTA CO. OP. HSG. SOC. Prop?

The registered promoter entity is Poonam Housecon Pvt. Ltd., a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in EKTA CO. OP. HSG. SOC. Prop?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for EKTA CO. OP. HSG. SOC. Prop?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at EKTA CO. OP. HSG. SOC. Prop?

The professionals named in the filing: Architect: Vishwas Satodia; Engineer: Neel Dholia; Chartered Accountant: Sudhir R Shah. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in EKTA CO. OP. HSG. SOC. Prop?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About EKTA CO. OP. HSG. SOC. Prop. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save EKTA CO. OP. HSG. SOC. Prop to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.