Registration lapsed No litigation declared Residential / Group Housing project

EKDANT

By ZENIA REALTY

RG-MH-25144 · RERA P51900007614 · Last updated on MahaRERA portal: 14 Feb 2025

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 27 months past the filed date

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai City registration emailed to you, free during the pilot beta.
Jul 2024Possession promised27 months past this date
4 of 11Construction stages donefurthest along: Staircases, 95%
0Complaints at MahaRERAon this registration
Jump to the 101 documents Report an error

EKDANT is a Residential / Group Housing project by ZENIA REALTY in Mumbai City, Maharashtra, registered with MahaRERA as P51900007614 on 17 Aug 2017. Possession was promised by 11 Jul 2024 and is now 27 months past that date.

At a glance

Project

  • NameEKDANT
  • TypeResidential / Group Housing
  • Location
    • 10th lane. kamatipura
    • mumbai central
    • Mumbai City
    • 400008
  • Pincode400008
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51900007614
  • ReraGenie IDRG-MH-25144

Builder

  • NameZENIA REALTY
  • Entity typeOthers
  • PartnerGITEN VALLABHJI POLADIA

Key dates

27 months past promisethis monthRegisteredAug 2017PromisedJul 2024

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on17 Aug 2017
  • Promised completion11 Jul 2024
  • Revised completionNone
  • Buildings1 building record
  • Documents filed101 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
EkdantNA250000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 14 Feb 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 11 construction stages are filed complete. The stage furthest along is Staircases, at 95%.

Ekdant: 72% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises65%
Sanitary Fittings within the flats / premises65%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks95%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.75%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.90%

Progress on shared amenities15

As on 14 Feb 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes65%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes75%
Storm Water DrainsYes75%
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes75%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes80%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area556 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI9456.14
Proposed, not sanctioned4,728 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branch10TH KHETWADI, GRANT ROAD EAST, MUMBAI-400004

Certifying professionals and partners2

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSafzar Ali Kazi
EngineerHANWARE CONSULTANTS
PartnerRole in project
ZENIA REALTY-

Litigation declared3

CaseCourtStatus
575/926/2012Small Causes CourtTrial
514/2013Small Causes CourtTrial
1315/2016Small Causes CourtMutually settled and consent term to be file in the court

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 31 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 1 Mar 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 30 Dec 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 12 Jan 2019Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 29 Dec 2022

Documents filed101

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 101 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Certificates of CA (Form 3)File: Zenia Realty_CA Certificate_March 2024.pdf14 Feb 2025
Architect’s Certificate on Completion of Project (Form 4)File: Architect’s Certificate -Form 4.pdf6 Dec 2024
Architect’s Certificate on Completion of Project (Form 4)File: Form 4 -Zenia Realty.pdf16 Nov 2024
Architect’s Certificate on Completion of Project (Form 4)File: Form 4 -Zenia Realty.pdf16 Nov 2024
Certificates of CA (Form 3)File: CA Certificate - Jan 23.pdf12 Feb 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: architect certificate.pdf21 Dec 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: architect certificate.pdf21 Dec 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: architect certificate.pdf21 Dec 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: architect certificate.pdf21 Dec 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: June 2022.pdf21 Dec 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer's Certificate.pdf21 Dec 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer's Certificate.pdf21 Dec 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer's Certificate.pdf21 Dec 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form-5-signed.pdf4 Dec 2023
Certificates of CA (Form 3)File: CA Certificate - Mar-23.pdf14 Oct 2023
Certificates of CA (Form 3)File: CA Certificate - Jun23.pdf14 Oct 2023
Certificates of CA (Form 3)File: CA Certificate - Sept23.pdf14 Oct 2023
Certificates of CA (Form 3)File: Form 3.pdf28 Mar 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form5_FY 2021_22.pdf28 Mar 2023
Building plan approvalFile: DRAWING0.pdf30 Dec 2022
Building Plan Approval (IOD)File: DRAWING0.pdf30 Dec 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer_Certificate_JUNE_2019.pdf30 Dec 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer_Certificate_DEC_2019.pdf30 Dec 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer_Certificate_DEC_2020.pdf30 Dec 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer_Certificate_JUNE_2021.pdf30 Dec 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer_Certificate_SEPT_2021.pdf30 Dec 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - july to September 22.pdf29 Dec 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form5.pdf29 Dec 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5.pdf29 Dec 2022
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Occupation Certificate.pdf29 Dec 2022
Certificates of CA (Form 3)File: Form 3.pdf24 Dec 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECT CONSULTANT ASLAM QURESHI.pdf18 Aug 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate.pdf18 Aug 2022
Form 2AFile: Form 2A.pdf18 Aug 2022
Certificates of CA (Form 3)File: Form 3 - CA Certificate.pdf18 Aug 2022
Layout approvalFile: Drawing (6)_00001.pdf1 Mar 2022
Layout approvalFile: Drawing (6)_00002.pdf1 Mar 2022
Layout approvalFile: Drawing (6)_00003.pdf1 Mar 2022
Layout approvalFile: Drawing (6)_00004.pdf1 Mar 2022
Layout approvalFile: Drawing (6)_00005.pdf1 Mar 2022
Copy of Layout Approval (in case of layout)File: Drawing (6)_00001.pdf1 Mar 2022
Copy of Layout Approval (in case of layout)File: Drawing (6)_00002.pdf1 Mar 2022
Copy of Layout Approval (in case of layout)File: Drawing (6)_00003.pdf1 Mar 2022
Copy of Layout Approval (in case of layout)File: Drawing (6)_00004.pdf1 Mar 2022
Copy of Layout Approval (in case of layout)File: Drawing (6)_00005.pdf1 Mar 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect form 1.pdf27 Dec 2021
Form 2AFile: Form 2A - Jun 21.pdf27 Dec 2021
Certificates of CA (Form 3)File: signed CA Certificate ZENIA REALTY - JUN'21.pdf27 Dec 2021
Certificates of CA (Form 3)File: Signed CA Certificate ZENIA REALTY - Sept21.pdf27 Dec 2021
Layout approvalFile: PLANS_page-0001.pdf21 Dec 2021
Layout approvalFile: PLANS_page-0002.pdf21 Dec 2021
Layout approvalFile: PLANS_page-0003.pdf21 Dec 2021
Layout approvalFile: PLANS_page-0004.pdf21 Dec 2021
Layout approvalFile: PLANS_page-0005.pdf21 Dec 2021
Copy of Layout Approval (in case of layout)File: PLANS_page-0001.pdf21 Dec 2021
Copy of Layout Approval (in case of layout)File: PLANS_page-0002.pdf21 Dec 2021
Copy of Layout Approval (in case of layout)File: PLANS_page-0003.pdf21 Dec 2021
Copy of Layout Approval (in case of layout)File: PLANS_page-0004.pdf21 Dec 2021
Copy of Layout Approval (in case of layout)File: PLANS_page-0005.pdf21 Dec 2021
Certificates of CA (Form 3)File: signed ca certificate - Final.pdf31 Mar 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate 2021.pdf26 Jan 2021
Form 2AFile: Form 2A.pdf26 Jan 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCH.pdf24 Jan 2020
Form 2AFile: 2A.pdf24 Jan 2020
Certificates of CA (Form 3)File: CA.pdf24 Jan 2020
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: CA-FORM-5.pdf9 Dec 2019
Form 2AFile: FORM 2A.pdf21 Nov 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCH.pdf14 Nov 2019
Certificates of CA (Form 3)File: zenia realty.pdf17 Sep 2019
Certificates of CA (Form 5)File: FORM 5.pdf20 Mar 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1.pdf11 Mar 2019
Form 2AFile: FORM-2A.pdf11 Mar 2019
PAN CardFile: img856.pdf12 Jan 2019
PAN CardFile: img856.pdf12 Jan 2019
Commencement Certificates / NA Order for plotted developmentFile: 22 FLOOR CC.pdf12 Jan 2019
Commencement Certificates / NA Order for plotted developmentFile: 22 FLOOR CC.pdf12 Jan 2019
Status of ConveyanceFile: CONVEYANCE-min.pdf12 Jan 2019
Copy of the legal title reportFile: Office Lens 20170731-134609-ilovepdf-compressed.pdf31 Jul 2017
Declaration in FORM BFile: Office Lens 20170731-205118-ilovepdf-compressed.pdf31 Jul 2017
Proforma of Allotment letterFile: Allotment Letter.pdf31 Jul 2017

How this compares with Mumbai City

33%of Mumbai City projects moved their completion datethis one has not
25%of Mumbai City registrations have lapsed or been cancelledthis one is among them

Computed across the 780+ Mumbai City projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep EKDANT on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near mumbai central780+ in Mumbai City

2 kmEKDANTCompleted 19Lapsed / revoked 40Other 101Dot size: filed unitsN

Filed coordinates, straight-line distance. 160 registered projects within 2 km.

Builder: ZENIA REALTY

ZENIA REALTY has 1 registration on MahaRERA, including EKDANT. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai City district page.

Frequently asked questions

What does it mean that EKDANT shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if EKDANT is delayed beyond 11 Jul 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of EKDANT?

The registered promoter entity is ZENIA REALTY, an others as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in EKDANT?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for EKDANT?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at EKDANT?

The professionals named in the filing: Architect: Safzar Ali Kazi; Engineer: HANWARE CONSULTANTS. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in EKDANT?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About EKDANT. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save EKDANT to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.