Red flags

  • Litigation declared, 3 cases
  • 8 complaints at MahaRERA
  • Completion date moved by 58 months
  • 5 extensions taken

Clear

  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai City registration emailed to you, free during the pilot beta.
Oct 2027Possession promisedmoved 58 months from the original
28 of 33Construction stages doneacross 3 buildings; furthest along: Internal walls, 90%
96 of 220Units unsoldnot recorded sold or booked
8Complaints at MahaRERAon this registration
Jump to the 196 documents Report an error

FUEGO is a Residential / Group Housing project by HILTON INFRASTRUCTURE in Mumbai City, Maharashtra, registered with MahaRERA as P51900009939 on 22 Aug 2017. Possession is promised by 30 Oct 2027. The completion date has moved by 58 months from the original filing. 124 of the 220 units on this registration are recorded sold or booked, and 28 of 33 construction stages are filed complete. 8 complaints are on record with the regulator.

At a glance

Project

  • NameFUEGO
  • TypeResidential / Group Housing
  • Location
    • SHUKLAJI STREET
    • Mumbai City
    • 400008
  • Pincode400008
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51900009939
  • ReraGenie IDRG-MH-45419

Builder

  • NameHILTON INFRASTRUCTURE
  • Entity typePartnership
  • PartnersTABREZ SHAFIAHMED SHAIKH, RUBBERWALA HOUSING AND INFRASTRUCTURE DEVELOPMENT, MOHIUDDIN AHMED ABDUL HAMID ANSARI

Key dates

this monthRegisteredAug 2017First promiseDec 2022Revised toOct 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on22 Aug 2017
  • Promised completion30 Oct 2027
  • Revised completionRevised to 30 Oct 2027 (originally 30 Dec 2022)
  • Buildings3 building records
  • Documents filed196 files

Current status

56%124 of 220 units booked
71.7%Work done, per cost certificate

Figures as on 18 Aug 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BUILDING ANA30222091210
BUILDING BNA171710010
BUILDING CNA120000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 18 Aug 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

28 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Internal walls, at 90%.

BUILDING A93%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Sanitary Fittings within the flats / premises75%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks88%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.85%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.80%
BUILDING B100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
BUILDING C100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 18 Aug 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes80%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes85%
Storm Water DrainsYes75%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes80%
Solid Waste Management And DisposalYes70%
Water conservation /Rain water harvestingYes80%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes85%
Electrical meter room, sub-station, receiving stationYes85%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed190

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots190
Closed/Covered190
BuildingClosed/CoveredTotal
BUILDING A129129
BUILDING B77
BUILDING C5454

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area4,246 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on9 Aug 2025

Approvals and building plan

Permissible FSI21251.83
Proposed, not sanctioned15,936 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchDR A B NAIR MARG OPP MUMBAI CENTRAL STATION MUMBAI 400008
Estimated costRs 127.52 cr
Cost incurredRs 91.43 cr
Work done71.7%
BuildingWingEstimatedIncurred
BUILDING ANARs 97.68 crRs 70.55 cr
BUILDING CNARs 13.39 crRs 9.24 cr
BUILDING BNARs 11.77 crRs 8.42 cr
-NARs 4.68 crRs 3.23 cr

Certifying professionals and partners9

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectIRANI ARCHITECTS
ArchitectSHAIKH & ASSOCIATES
EngineerSTRUCT BOMBAY CONSULTANTS
EngineerIDRIS DOHADWALA
EngineerSADDAM SHAIKH
EngineerAFTAB SHAIKH
EngineerDipesh Joshi
Chartered AccountantMOHAN L GUPTA & ASSOCIATES
Chartered AccountantBSN & ASSOCIATES
PartnerRole in project
HILTON INFRASTRUCTURE-

Extensions applied for5

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51900013092Dec 2022 → Dec 2023

Reason as filed by the promoterIn accordance with circular no 28, we hereby apply for extension of our project u/s 6 in Format B. The project was delayed for reasons beyond our control on account of various reasons and more particularly on account of the pandemic of Covid-19.

EXT51900018646Dec 2022 → Dec 2024

Reason as filed by the promoterIn accordance with circular no 28, we hereby apply for extension of our project u/s 7(3) in Format B. The project was delayed for reasons beyond our control on account of various reasons and more particularly on account of the pandemic of Covid-19. We have consent of % allottees for purpose of extension of RERA registration period of the said project.

EXT51900026067Dec 2022 → Dec 2025

Reason as filed by the promoterWe have almost completed the project and we have attached site photos for your reference so we required 1 year extension for our sale and we will apply for the OC. please grant Extension.

EA09012619385Dec 2022 → Jun 2027

Reason as filed by the promoterThe construction of the project is substantially completed. However, due to slow sales and resultant financial constraints, the completion and sale of the remaining units got delayed. Hence, extension of the project registration is required up to 30.06.2027

P51900009939/WarDec 2022 → Oct 2027

Reason as filed by the promoterNA

Litigation declared3

CaseCourtStatus
201197/2012SMALL CAUSESEVIDENCE AND HEARING
4656/2012CITY CIVILFOR RECORDING EVIDENCE
4655/2012CITY CIVILFOR RECORDING EVIDENCE

Complaints filed with MahaRERA8

Case no.ComplainantRespondentFiled
CC006000000198417Harsha Sanjay SiroyaHilton Infrastructure26/11/2021
CC006000000198418Nisha J. SinghviHilton Infrastructure26/11/2021
CC006000000198528Neeta Rajesh LodhaHilton Infrastructure26/11/2021
CC006000000198532Dipti Pratik SinghviHilton Infrastructure26/11/2021
CC006000000198534Hulas B. SiroyaHilton Infrastructure26/11/2021
CC006000000198535Sheela Naresh LodhaHilton Infrastructure26/11/2021
CC006000000210073M/S HILTON INFRASTRUCTRETANVEER BANO SAMEER ABBAS BHAYANI21/02/2022
CC12605477Ashok Chunnilal PurohitHILTON INFRASTRUCTURE25/08/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 30 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 30 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 23 Jul 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 12 Jan 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Oct 2027

Documents filed196

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 196 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2025-2026)File: 2A fego 2026.pdf18 Aug 2026
Withdrawal Update Form 1File: Arch jun26 fueg.pdf30 Jul 2026
Withdrawal Update Form 2File: Eng june26 fueg.pdf30 Jul 2026
Withdrawal Update Form 3File: Ca june26 fueg.pdf30 Jul 2026
Withdrawal Update Form 1File: Arch cert fueg mar26.pdf22 May 2026
Withdrawal Update Form 2File: Eng cert fueg mar26.pdf22 May 2026
Withdrawal Update Form 3File: CA CERT MAR 26 FUEG.pdf22 May 2026
Form 2A (FY 2024-2025)File: FORM 2A 2024-25.pdf12 Feb 2026
Withdrawal Update Form 1File: Arch cet fueg dec25.pdf9 Feb 2026
Withdrawal Update Form 1File: Arch cet fueg dec25.pdf9 Feb 2026
Withdrawal Update Form 2File: ENG CER Fuego DEC25.pdf9 Feb 2026
Withdrawal Update Form 2File: ENG CER Fuego DEC25.pdf9 Feb 2026
Withdrawal Update Form 3File: CA Cert dec25 fuego.pdf9 Feb 2026
Withdrawal Update Form 3File: CA Cert dec25 fuego.pdf9 Feb 2026
Form 5 (FY 2024-2025)File: Form 5 2024-25 Fuego.pdf7 Feb 2026
Withdrawal Update Form 1File: Arch Cert fuego jun25.pdf13 Jan 2026
Withdrawal Update Form 1File: Arch Cert fuego jun25.pdf13 Jan 2026
Withdrawal Update Form 1File: Arch Cert fuego jun25.pdf13 Jan 2026
Withdrawal Update Form 1File: Arch Cert fuego jun25.pdf13 Jan 2026
Withdrawal Update Form 2File: Engcertjune25fuego.pdf13 Jan 2026
Withdrawal Update Form 2File: Engcertjune25fuego.pdf13 Jan 2026
Withdrawal Update Form 2File: Engcertjune25fuego.pdf13 Jan 2026
Withdrawal Update Form 2File: Engcertjune25fuego.pdf13 Jan 2026
Withdrawal Update Form 3File: CA CER FUEG JUNE25.pdf13 Jan 2026
Withdrawal Update Form 3File: CA CER FUEG JUNE25.pdf13 Jan 2026
Withdrawal Update Form 3File: CA CER FUEG JUNE25.pdf13 Jan 2026
Withdrawal Update Form 3File: CA CER FUEG JUNE25.pdf13 Jan 2026
Withdrawal Update Form 1File: Arch Cert fuego jun25.pdf19 Dec 2025
Withdrawal Update Form 1File: Arch fueg_sep25.pdf19 Dec 2025
Withdrawal Update Form 2File: ENG CERT_3062024_FUEGO.pdf19 Dec 2025
Withdrawal Update Form 2File: ENG CERT_3062024_FUEGO.pdf19 Dec 2025
Withdrawal Update Form 3File: CA CER FUEG JUNE25.pdf19 Dec 2025
Withdrawal Update Form 3File: CA CERT SEP25 FEUG_compressed.pdf19 Dec 2025
Form 1File: Arch sep25-fueg.pdf2 Dec 2025
Form 2File: Eng Cert sep25_fueg.pdf2 Dec 2025
Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD INVENTORY_FUEG.pdf2 Dec 2025
Form 3File: CA CERT SEP25 FEUG_compressed.pdf2 Dec 2025
Form 1File: ARCH CERT FUEGDE24.pdf15 Oct 2025
Form 2File: ENG CERT-FUEG_DEC24.pdf15 Oct 2025
Form 3File: CA FUEG-DEC24_compressed.pdf15 Oct 2025
Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD INVENTORY_compressed (1) (1).pdf15 Oct 2025
Form 1File: ARCH CER FUEGO SEP24.pdf15 Oct 2025
Form 2File: Eng Cert_sep24_fueg (1).pdf15 Oct 2025
Form 3File: CA CERT_FUEG SEP24_compressed.pdf15 Oct 2025
Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD INVENTORY_compressed (1) (1).pdf15 Oct 2025
Form 5 (FY 2023-2024)File: FORM 5_FUEGO -2023-24.pdf26 Aug 2025
Form 1File: Arch Cert fuego jun25.pdf23 Jul 2025
Form 2File: Engcertjune25fuego.pdf23 Jul 2025
Form 3File: CA CER FUEG JUNE25.pdf23 Jul 2025
Self-declaration of Quarterly ProgressFile: Document_250715_120930.pdf23 Jul 2025
Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD INVENTORY_compressed (1) (1).pdf23 Jul 2025
Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD INVENTORY_compressed (1).pdf24 Jun 2025
Form 1File: ARCH CERT FUEG MAR25.pdf24 Jun 2025
Form 2File: ENG CERT FUEGO MAR25.pdf24 Jun 2025
Form 3File: CA CERT FUEGO MAR25.pdf24 Jun 2025
Self-declaration of Quarterly ProgressFile: QPR_hilton.pdf24 Jun 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCH CERT FUEG MAR25.pdf6 May 2025
Certificates of CA (Form 3)File: CA CERT FUEGO MAR25.pdf6 May 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENG CERT FUEGO MAR25.pdf6 May 2025
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD INVENTORY_compressed (1).pdf28 Feb 2025
Other - TechnicalFile: PERT Chart 2025-fuego.pdf28 Feb 2025
Certificates of CA (Form 3)File: CA FUEG-DEC24_compressed.pdf24 Feb 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCH CERT FUEGDE24.pdf21 Feb 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENG CERT-FUEG_DEC24.pdf21 Feb 2025
Certificates of CA (Form 3)File: CA CERT_FUEG SEP24_compressed.pdf8 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5_FUEGO -2023-24.pdf6 Jan 2025
Declaration in FORM BFile: Form B_2025_fueg.pdf2 Jan 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Eng Cert_sep24_fueg (1).pdf2 Jan 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCH CERT FUEG JUNE24.pdf14 Nov 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCH CER FUEGO SEP24.pdf14 Nov 2024
Certificates of CA (Form 3)File: CA 311223_HILTON_compressed.pdf12 Nov 2024
Certificates of CA (Form 3)File: CA 31324_HILTON_compressed.pdf12 Nov 2024
Certificates of CA (Form 3)File: CA 30624_HILTON_compressed.pdf12 Nov 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENG CERT_3062024_FUEGO.pdf7 Aug 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form2A-23-24-fuego.pdf26 Jun 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - Fuego as on March 2024 (1).pdf11 Jun 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - Fuego as on Dec 2023.pdf28 May 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Fuego as on Dec 2023.pdf28 May 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arch cer-dec23-fuego.pdf5 Apr 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Eng cer-dec23-fuego.pdf5 Apr 2024

How this compares with Mumbai City

56%of this project is bookeddistrict median 17%
33%of Mumbai City projects moved their completion datethis one moved by 58 months
25%of Mumbai City registrations have lapsed or been cancelledthis one is on the register

Computed across the 780+ Mumbai City projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep FUEGO on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Mumbai City780+ in Mumbai City

2 kmFUEGOCompleted 29Lapsed / revoked 35Other 96Dot size: filed unitsN

Filed coordinates, straight-line distance. 160 registered projects within 2 km.

Builder: HILTON INFRASTRUCTURE

HILTON INFRASTRUCTURE has 1 registration on MahaRERA, including FUEGO. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Mumbai City district page.

Frequently asked questions

What are my rights if FUEGO is delayed beyond 30 Oct 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of FUEGO?

The registered promoter entity is HILTON INFRASTRUCTURE, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in FUEGO?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against FUEGO?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for FUEGO?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at FUEGO?

The professionals named in the filing: Architect: IRANI ARCHITECTS; Architect: SHAIKH & ASSOCIATES; Engineer: STRUCT BOMBAY CONSULTANTS; Engineer: IDRIS DOHADWALA; Engineer: SADDAM SHAIKH; Engineer: AFTAB SHAIKH. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in FUEGO?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About FUEGO. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save FUEGO to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.